Igo Limited · ASX:IGO

Igo — Independence Group NL — Shareholder Meeting (November 2004)

43 slides from Igo's shareholder meeting presentation, Nov 24, 2004

  1. Slide 1: Independence Group NL Annual General Meeting

    INDEPENDENCE GROUP NL Annual General Meeting 24th th November 2004

  2. Slide 2: Executive Summary

    EXECUTIVE SUMMARY Low cost nickel producer. Expanding production profile and increasing mine life. Strong cash reserves and cash generation potential. Paying dividends. Exploring for gold and nickel in Australia. Unique exploration technology. Aim to become a diversified mining house.

  3. Slide 3: Share Structure

    SHARE STRUCTURE ASX Code - Shares IGO $1.34 (19.11.04) - Options IGOO $1.18 (19.11.04) IGO average turnover (last 6 months) = 377,983 shares/day Ordinary shares 87.4M Options 12.8M Contributing shares 7.0M Unlisted options 9.3M TOTAL 116.5M Option expiry date 31.01.05 Will raise $4.1M if all exercis

  4. Slide 4: Top Ten Shareholders

    TOP TEN SHAREHOLDERS Ordinary Shares Equity Trustees 6.5M 8.1% JP Morgan Nominees 3.7M 4.6% National Nominees 3.1M 3.9% Forbar Custodians 2.7M 3.3% ANZ Nominees 2.3M 2.8% Citicorp Nominees 2.0M 2.5% IME 2.0M 2.5% Virtual Genius 2.0M 2.4% Queensland Investments 2.0M 2.4% Westpac Custodians 1.7M 2.1%

  5. Slide 5: IGO Profitability

    IGO PROFITABILITY 2002/3 2003/4 Mine Revenue $25.5M $66.7M Mine cash flow (pre tax)* $7.3M $29.4M Group profit (after tax) $1.4M $17.3M Earnings per share 2.0c 24c (undiluted) Earnings per share 2.0c 18c (diluted) * Excludes capital, depreciation, amortisation and exploration

  6. Slide 6: IGO Cash

    IGO CASH 2002/3 2003/4 Cash: $4.0M $18.4M Receivables: $5.1M $13.7M Creditors: ($3.6M) ($6.5M) Total: $5.5M $25.6M Debt: $17.2M $12.7M

  7. Slide 7: IGO Cash + Receivables as at 30.9.04

    IGO CASH + RECEIVABLES as at 30.9.04

  8. Slide 8: Long Nickel Mine Geological Setting

    LONG NICKEL MINE GEOLOGICAL SETTING WMC Production 1979-1999: 5.43M t 3.7% Ni 203,184 Ni t IGO Production 2002-2004: 256,155 t 3.9 % Ni 9,852 Ni t 2004/2005 Reserves: 1.185M t 4.1 % Ni 48,300 Ni t

  9. Slide 9: IGO Nickel Resources & Reserves Comparison

    IGO NICKEL RESOURCES & RESERVES COMPARISON

  10. Slide 10: Long Mine Safety

    LONG MINE SAFETY LTI’s MTI’s LTIFR 2002/2003 1 4 8.3 2003/2004 0 11 0 Total 1 15 2.8 Industry Average 5.7 Contributions to Safety: Owner operator with salaried employees. Continual awareness, training and good communication. High standards of shotcreting, bolting and meshing. Low extraction rate com

  11. Slide 11: Long Mine Personnel

    LONG MINE PERSONNEL 92 employees. Turnover extremely low. Skilled personnel waiting list. Very experienced team.

  12. Slide 12: 2003/2004 Production

    2003/2004 PRODUCTION IGO Ni t Tonnes % Ni Ni t Share Budget 160,000 3.3 5,280 3,109 Actual 168,991 4.1 6,843 4,063 REASONS: Mined 1,854 Ni t from outside ore reserve. Mined an additional 1,292 Ni t from inside reserves due to better grades. eg. Gibb South - 3.7% Ni ore reserve grade - 6.9% Ni actual

  13. Slide 13: 2003/2004 Production Stats

    2003/2004 PRODUCTION STATS Tonnes % Ni Ni t Long 143,651 3.7 5,240 Gibb South 22,130 6.9 1,528 Victor South 3,210 2.4 75 TOTAL 168,991 4.1 6,843 A$/lb Payable Ni Payable sales revenue (incl. hedging): 7.52 Cash mining / development costs: 2.45 Milling & other cash costs: 0.87 TOTAL 3.32 Deprec. / am

  14. Slide 14: Future Cost Savings

    FUTURE COST SAVINGS Producing own cement Redesigning ground support

  15. Slide 15: Future Cost Savings

    FUTURE COST SAVINGS New 55t haulage truck Compressed air blast hole rig

  16. Slide 16: Mining Research & Development

    MINING RESEARCH & DEVELOPMENT Ground support evaluation

  17. Slide 17: Innovations - Geophysics

    INNOVATIONS - GEOPHYSICS 3 component fluxgate down hole probe 3 component EM torch

  18. Slide 18: Geophysics Nickel Grade Estimation

    GEOPHYSICS NICKEL GRADE ESTIMATION

  19. Slide 19: Exploration Targets

    EXPLORATION TARGETS y 1) GOLD FIELDS ML 15/161 _ OYALTY AREA 7.1m @ 12.1% Ni 3.15m @ 3.2% Ni _— Fe 0.76m @ 10.1% <. z r ) PS BS * 3.6m @ 3.3% Ni 0.7m @ 4.7% Ni _ Long South £ Decline Proposed Proposed drill holes 1km TARGET AREAS LEGEND @ Victor South @) Long Deeps || Nickel mineralisation @ EM cond

  20. Slide 20: 2004/2005 Production Budget

    2004/2005 PRODUCTION BUDGET Budget: 222,000 t @ 4.0% Ni (8,900t Ni) 2004/5 Cash costs <A$3.30/lb (payable (payable nickel nickel metal) metal)

  21. Slide 21: Long - 5 Year Mining Schedule

    (2 LONG -5 YR MINING SCHEDULE Production Head Grade Nickel Tonnes % Ni 12000 5.0 10000 40 8000 2004/5 2005/6 2006/7 2007/8 2008/9 |i Production Ni tonnes =——= Head grade % Ni

  22. Slide 22: Australian Regional Exploration Strategy

    AUSTRALIAN REGIONAL EXPLORATION STRATEGY Looking for new nickel and gold camps: • Under cover, and • In lightly or unexplored terrains using empirical & conceptual targeting

  23. Slide 23: IGO Nickel Exploration Projects

    IGO NICKEL EXPLORATION PROJECTS

  24. Slide 24: Geophysical Innovations

    GEOPHYSICAL INNOVATIONS LOW TEMP SQUID TEM SENSOR MAG TEM SENSOR Anglo American JV

  25. Slide 25: Geophysical Innovations: Coil vs MAG TEM & SQUID TEM

    GEOPHYSICAL INNOVATIONS COIL vs MAG TEM & SQUID TEM Conventional Coil TEM MAG & SQUID TEM

  26. Slide 26: Exploration Innovations: Using Chromites to Find NiS

    EXPLORATION INNOVATIONS USING CHROMITES TO FIND NiS Chromites occur in many rock types. Diamond explorers collect and analyse chromites. IGO can use their data to recognise chromites that are sourced from massive nickel sulphides and fertile flows. Chromite grains

  27. Slide 27: Cosmos Example

    COSMOS EXAMPLE Other NiS deposits have associated chromite anomalies, including: Kambalda Widgiemooltha Scotia Cosmos Blair Ravensthorpe >40 new nickel targets defined.

  28. Slide 28: Chromite Example

    CHROMITE EXAMPLE Aeromagnetic Image showing NiS anomalous chromite sample locations

  29. Slide 29: North Eastern Goldfields Nickel Project Locations

    NORTH EASTERN GOLDFIELDS NICKEL PROJECT LOCATIONS

  30. Slide 30: Nickel Geochem Anomaly

    NICKEL GEOCHEM ANOMALY Anomalous values and TEM conductor Nickel geochemical image over magnetics

  31. Slide 31: Nickel Geochem Anomaly

    NICKEL GEOCHEM ANOMALY Aeromagnetic image Nickel geochemical image showing peak geochem results

  32. Slide 32: IGO Gold Exploration Projects

    IGO GOLD EXPLORATION PROJECTS

  33. Slide 33: Tropicana East Gold JV

    TROPICANA EAST GOLD JV ANGLOGOLD earning 70%

  34. Slide 34: Tropicana Cross-Sections

    TROPICANA CROSS-SECTIONS 142800mN 143200mN

  35. Slide 35: Goldsworthy Gold JV

    GOLDSWORTHY GOLD JV IGO earning 80%

  36. Slide 36: Goldsworthy Gold JV Gold Anomalous Shear Zones

    GOLDSWORTHY GOLD JV GOLD ANOMALOUS SHEAR ZONES

  37. Slide 37: Goldsearch JV

    GOLDSEARCH JV IGO earning 36% Goldsearch JV - Bloods Range Gold Geochem Image

  38. Slide 38: Murrin South & Leonora Gold Projects

    MURRIN SOUTH & LEONORA GOLD PROJECTS Murrin South Leonora Project Gold in Auger Geochemistry Image Cross-Section

  39. Slide 39: Mt Padbury Project

    MT PADBURY PROJECT IGO earning 90% Gold Geochemistry Image Arsenic Geochemistry Image

  40. Slide 40: Dalwallinu Project

    DALWALLINU PROJECT Gold Arsenic Bismuth Geochemistry Image Geochemistry Image Geochemistry Image

  41. Slide 41: Mt Isdell Project

    MT ISDELL PROJECT Zinc Geochemistry Image Lead Geochemistry Image Copper Geochemistry Image Gold Geochemistry Image

  42. Slide 42: Summary

    SUMMARY +5 year mine life with low cash costs. Strong cash position. Significant cash flow available for growth and fully franked dividends. Exposure to exploration upside at Long and on regional nickel and gold plays. $6M exploration budget plus Long South decline. Acquisitions must be value accret

  43. Slide 43: Independence Group NL

    INDEPENDENCE GROUP NL Creating Shareholder Wealth

Independence Group NL — Shareholder Meeting (November 2004) on 6ix