Revival Gold Inc · TSXV:RVG

Revival Gold — Technical Presentation (November 2020)

38 slides from Revival Gold's technical presentation, Nov 17, 2020

  1. Slide 1: Pursuing a Revival in Gold

    TSX-V: RVG Beartrack-Arnett Gold Project revival-gold.com OTCQB: RVLGF 17th November 2020 1st Phase PEA PURSUING A REVIVAL IN GOLD

  2. Slide 2: Cautionary Notes

    CAUTIONARY NOTES This document has been prepared by Revival Gold Inc. (“Revival Gold” or, the “Company”) for evaluation of the Company by the recipient. The information contained in this presentation is derived from estimates made by the Company, information that has been provided to the Company by

  3. Slide 3: Revival Gold Inc.

    REVIVAL GOLD INC. A growth company in gold • Advancing the Beartrack-Arnett Gold Project located in Idaho, USA • Largest past-producing gold mine in the state • Multi-million-ounce; gold-only • Strong PEA economics on first phase restart • Veteran gold team - track records of success with: Gold bars

  4. Slide 4: Beartrack – Arnett Gold Project

    BEARTRACK – ARNETT GOLD PROJECT The Asset 1st Phase PEA Idaho Location Valuation • 5,400 hectare land • Staged approach; 1st • Ranked in Top-10 by • $16/oz vs peers trading position re-assembled in Phase is a re-start of Fraser Institute at $30-50/oz2 2017-18 heap leach operations • State government

  5. Slide 5: 1st Phase PEA

    1st PHASE PEA Supports resumption of meaningful heap leach gold production • PEA authored by Wood (w/ RPA, KCH, PWC) • Key metrics1 ▪ 72,000 oz/yr over 7 yrs with $1,057/oz AISC ▪ $100 M pre-production capex ▪ $88 M after-tax NPV5% , 25% after-tax IRR at $1,550 Au • Brownfield site – low technical a

  6. Slide 6: 1st Phase Economics

    1st PHASE ECONOMICS Robust Project Economics1 $1,550/oz Gold PEA Base Case PEA (equivalent to consensus LT gold price2) Base Case Avg Annual Production 72,000 oz Au/yr Pre-Production Capex $100 M Gold Price US$/oz $1,550 $1,750 $1,950 LOM Sustaining Capex $62 M Life of Mine (LOM) 7 years NPV(5%) $88

  7. Slide 7: Competitive Position

    COMPETITIVE POSITION 7 Capital Intensity US Heap Leach Mines $ Initial Capex/Eqvlt. oz Au Production AISC/Eqvlt. oz Au Ranking 350 2000 300 1800 1600 Average $1,253/oz 250 1400 USD/oz 200 1200 1000 150 800 100 600 400 50 200 0 0 Source: Public company filings. Source: Public company filings. • $100

  8. Slide 8: Large Scale, Top-5 Grade

    LARGE SCALE, TOP-5 GRADE Independently Owned & Undeveloped Beartrack-Arnett Resource Open Pit Gold Projects Ranked by Grade & Resource 14 2.5 100% Au 12 2 Resources Moz AuEq 10 Grade g/t AuEq 8 1.5 6 1 4 0.5 1st 2 Phase 0 0 • Full potential exceeds M&I Inf M&I Grade Source: Public company filings. 3

  9. Slide 9: Project Details

    PROJECT DETAILS • 12,000 tonnes/day open pit, heap leach operation; 75-ton Komatsu trucks • Modular 2-stage crush to -2 inch; no agglomeration; conveyor stacking • Utilizes existing infrastructure including access road, powerline, ADR plant and solution ponds • Average gold recovery 60% (for oxide,

  10. Slide 10: Production Schedule

    PRODUCTION SCHEDULE TSX-V: RVG | OTCQB: RVLGF See press release dated November 17th, 2020 for further details. 10

  11. Slide 11: Capital Cost Summary

    CAPITAL COST SUMMARY TSX-V: RVG | OTCQB: RVLGF See press release dated November 17th, 2020 for further details. 11

  12. Slide 12: Cash Flow Profile

    CASH FLOW PROFILE1 TSX-V: RVG | OTCQB: RVLGF Note: (1) At $1,550/oz Au. See press release dated November 17th, 2020 for further details. 12

  13. Slide 13: Site Layout

    SITE LAYOUT Beartrack Pits Haidee Pit Leach Pads 2,000 ft Plant Site TSX-V: RVG | OTCQB: RVLGF 13

  14. Slide 14: Infrastructure Head Start

    INFRASTRUCTURE HEAD START Grid Power Gold Production Facility TSX-V: RVG | OTCQB: RVLGF

  15. Slide 15: Leadership Team

    LEADERSHIP TEAM Hugh Agro Adam Rochacewich Steve Priesmeyer Pete Blakeley President & CEO VP and CFO VP Exploration General Manager B.Sc. (Mining B.Comm., CPA, CA B.Sc. (Geology), M.Sc. B.Sc. (Geological Engineering), MBA, (Geology). C.P.G. Engineering) Accounting and finance P.Eng. professional. Wo

  16. Slide 16: Opportunity Beyond the 1st Phase PEA

    OPPORTUNITY BEYOND THE 1st PHASE PEA 1 2 3 2020 Drill Targets 1 Haidee 2 Between N. & S. Pits 4 3 Joss 4 Rabbit TSX-V: RVG | OTCQB: RVLGF 16

  17. Slide 17: Mineralized over +5 km and Open

    MINERALIZED OVER +5 KM AND OPEN open open open open open TSX-V: RVG | OTCQB: RVLGF 17

  18. Slide 18: High Grade at Beartrack

    HIGH GRADE AT BEARTRACK Cross Section • 8.5 g/t Au over 2.7 m in South Pit area • 6.6 g/t Au over 8.2 m and 8.8 g/t Au over 3.0 m in Joss area • 71 g/t Au over 9.8 m in the Ward’s Gulch area (pictured right) open open TSX-V: RVG | OTCQB: RVLGF 18

  19. Slide 19: Evolution of Beartrack Block Model

    EVOLUTION OF BEARTRACK BLOCK MODEL Expanding – limited only by drilling to-date 1996 with follow-up drilling 2018 with follow-up drilling +50% 2020 Note: 3D view looking down and to the N-W; Topo surface in grey; blocks shown in red are all above TSX-V: RVG | OTCQB: RVLGF 0.27 g/t Au. See Beartrack-

  20. Slide 20: US$5/oz Discovery Costs

    US$5/OZ DISCOVERY COSTS1 TSX-V: Note: (1) Less than RVG US$15 | OTCQB: million RVLGF in equity financing between 2017 start of exploration and 2020 release of resource. 20

  21. Slide 21: 2020 Drilling Program

    2020 DRILLING PROGRAM Arnett • 30 holes for 4,900 meters drilled • 12 released to-date • All have intersected oxide mineralization within 140 meters of surface1 Note: (1) See Revival Gold press releases dated October 15th and November 12th, 2020 for further details. TSX-V: RVG | OTCQB: RVLGF 21

  22. Slide 22: 2020 Drilling Program (cont'd)

    2020 DRILLING PROGRAM (cont’d) Beartrack • Between North and South Pits (not shown) • test continuity of PCSZ and for potential oxides (total of ~2,000 m, 5 holes) • Joss follow-up • Follow-up BT18-211D with high grades close to surface outside the PCSZ (total of ~1,000 m, 1-2 holes) • Rabbit “blue

  23. Slide 23: The Path Forward

    THE PATH FORWARD Building a great growth company in gold 2020 2021 2022 Priority Drilling Drilling Haidee, Rabbit, Joss, & Tech Studies 23 N. & S. Pits BEARTRACK- ARNETT C$15 M Equity Environmental and Permit Planning Resource Heap Leach Update & PFS PEA (mill PEA?) CORPORATE Assessing Complementary

  24. Slide 24: Relative Value

    RELATIVE VALUE 100 80 MOZ EV US$/oz M&I+I WKM GSV Near-Term Catalysts: 60 Average take-over • Resource expansion Since 2013 • “Blue sky” at Rabbit US$64/oz • Heap leach PEA MAX 40 ITR Pure Gold GPY 20 NHK Gold Eqvlt. SPA RVG Bubbles equate to M&I+I resource size 0 0 0.5 1 1.5 2 2.5 Grade g/t AuEq So

  25. Slide 25: Revival Gold Inc.

    REVIVAL GOLD INC. FAST PROVEN COMPELLING TRACKING … PROPERTY… OPPORTUNITY… • Veteran gold team • Brownfield site • Gold price on the rise • Fully funded exploration • Largest past producer in • Growing interest in program Idaho North American gold • Strong PEA economics • Significant “head start” as

  26. Slide 26: Revival Gold Inc.

    TSX-V: RVG OTCQB: RVLGF revival-gold.com REVIVAL GOLD INC. 145 King St. W., Suite 2870 Toronto, Ontario M5H 1J8 HUGH AGRO | President & CEO ADAM ROCHACEWICH | CFO info@revival-gold.com 416-366-4100 26

  27. Slide 27: Appendix

    ——— APPENDIX 27

  28. Slide 28: TSXV: RVG OTCQB: RVLGF

    TSXV: RVG Street Research OTCQB: RVLGF Average Target Price Supports Significant Re-Rate 6% YRI 10% Basic Shares 71.2 M Management Fully-Diluted Shares 85.4 M 40% Share Price (13th Nov. ‘20) C$1.03 Institutional* 21% Avg. Daily Vol. 260,000 Retail Basic Market Cap C$73 M Source: Bloomberg and Yahoo

  29. Slide 29: Board

    BOARD Wayne Hubert Hugh Agro Don Birak Rob Chausse Non-Exec Chairman President & CEO Director Director B.Sc. (Chemical B.Sc. (Mining B.Sc., M.Sc. (Geology) B.Comm., CA Engineering), MBA Engineering), MBA, Former SVP, Coeur CFO, New Gold Inc. P.Eng. Former CEO of Mining and VPX and former CFO, Andean

  30. Slide 30: ESG Snapshot

    ESG SNAPSHOT Revival Gold • Committed to the safety and protection of our people, the communities and the environment within which we work • Experienced management team that has built and operated mines • Strong governance led by independent chair and board Beartrack-Arnett Project • Idaho ranked 8t

  31. Slide 31: Property Agreements

    PROPERTY AGREEMENTS Beartrack: Key terms with subsidiary of Yamana Gold announced September 7, 2017 (as amended May 8, 2019 and May 20, 2020) • 1 MM shares and US$250,000 paid on close; further 3mm shares to be paid over four years (all have now been issued) • US$10.0 MM in exploration over five yea

  32. Slide 32: Beartrack-Arnett 2020 Resource

    BEARTRACK-ARNETT 2020 RESOURCE Contained Tonnes Gold Grade Resource Category Gold (’000 t) (g/t Au) (000 oz) Indicated Leach Beartrack – Open Pit 11,900 0.56 215 Arnett – Open Pit 2,500 0.65 52 Indicated Mill Beartrack – Open Pit 22,216 1.52 1,089 Beartrack – Underground NA NA NA Total Indicated 36,

  33. Slide 33: Beartrack-Arnett 2020 Resource (cont'd)

    BEARTRACK-ARNETT 2020 RESOURCE (cont’d) 1. Effective date of December 10, 2019. CIM (2014) definitions were used for Mineral Resource classification. 2. Qualified Persons: Mark B. Mathisen, C.P.G, Ryan Rodney, C.P.G., Kathleen A. Altman, Ph.D., P.E. Mineral Resources were tabulated for model blocks

  34. Slide 34: 2020 Resource: Statistics

    2020 RESOURCE: STATISTICS Drill Hole Data Beartrack (core & RC holes) Arnett (only core holes used) Number Meters Number Meters Pre-2012 (Meridian) 471 64,084 11 1,337 Post-2012 (Yamana & RVG) 53 22,625 28 4,758 Total 524 86,709 39 6,095 … includes core holes 226 39 … of which RVG drilled (‘17-’19)

  35. Slide 35: Favourable Metallurgy

    FAVOURABLE METALLURGY Oxide/Heap Leach Material • Beartrack previously operated as a heap leach mine • Processed at 13,600 tpd of heap leach material with a 2-stage crush to minus 2-inch size • Recovery averaged 88% of cyanide soluble gold (approximately 70% of contained gold)1. • Arnett has been th

  36. Slide 36: Target Rich Land Position

    TARGET RICH LAND POSITION Aeromagnetic geophysical survey Under-cover structures at Rabbit 2 km diameter, shallow (approx. 300-meter-deep) magnetic high at Haidee See Revival Gold August 12th, 2019 press TSX-V: RVG | OTCQB: RVLGF release for summary of aeromagnetic results. 36

  37. Slide 37: Arnett: Opportunities Beyond Haidee

    ARNETT: OPPORTUNITIES BEYOND HAIDEE Arnett soil geochemistry Anomalous gold in soils TSX-V: RVG | OTCQB: RVLGF See Revival Gold press release dated November 21st, 2019 for further details. 37

  38. Slide 38: Revival Gold Inc.

    TSX-V: RVG OTCQB: RVLGF revival-gold.com REVIVAL GOLD INC. 145 King St. W., Suite 2870 Toronto, Ontario M5H 1J8 HUGH AGRO | President & CEO ADAM ROCHACEWICH | CFO info@revival-gold.com 416-366-4100 38

Revival Gold — Technical Presentation (November 2020) on 6ix