Orosur Mining Inc. · TSXV:OMI

Orosur Mining — Investor Presentation (June 2022)

19 slides from Orosur Mining's investor presentation, June 2022

  1. Slide 1: Investor Presentation

    Investor Presentation London, June 2022 SOUTH AMERICAN EXPLORER www.orosur.ca I TSXV:OMI / AIM:OMI 1

  2. Slide 2: Disclaimer

    Disclaimer This document has been issued by Orosur Mining Inc. (the “Company”). This document does not constitute or form part of any offer or invitation to sell or issue, or any solicitation of any offer to purchase or subscribe for, any securities of the Company, nor shall any part of it nor the f

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot 12 Month Share Performance Directors and Management Name Position Louis Castro Director and Executive Chairman Brad George Director and CEO Thomas Masney Non-Executive Director Capital Structure and Key Metrics (27th June 2022) Nick Von Schirnding Non- Executive Director Basic Sha

  4. Slide 4: Current status

    Current status • Uruguay closure near completion. • Anzá now being operated by Newmont/Agnico. • +15,000m drilled since restart in late 2020, +38,000m in total • Drilling at APTA completed for the moment – rigs moved north, two at Pepas, one at Pupino. First results imminent. • El Pantano positive r

  5. Slide 5: Anzá Project

    Anza Project x Preven reer rere july

  6. Slide 6: Anzá Status

    Anzá Status • Over 15,000m drilled since late 2020, over 38,000m in total. • Numerous mineralized zones identified at APTA – high grade but complex. Decision taken not to drill to resource. • Project operations handed over to JV partner. • Focus finally shifted to northern prospects after 10 years.

  7. Slide 7: Regional Potential

    Regional Potential • Almost all drilling since 2012 at APTA. Not because it was best, but because it was easiest to access and was safest during Covid. • Drilling is expensive – we need targets first. • Large sampling, mapping and geophysics programs through 2021. Followed by development of access.

  8. Slide 8: Porphyry-Epithermal. A question of depth

    Porphyry-Epithermal. A question of depth • Wide variety of ore body types derive from the Porphyry-epithermal model • Require source, fluid pathway and trap site. • Key is the interaction of upwelling fluids with surrounding rocks and waters • Buritica is lower in the system than APTA – Carbonate Ba

  9. Slide 9: Anza – leases and applications

    Anza – leases and applications 9

  10. Slide 10: Anza – conversion of applications

    Anza – conversion of applications Bosque Seco Tropicale - BST Jesuitas Cuts application in half 10

  11. Slide 11: Anzà, what next?

    Anzà, what next? • Results at Pepas soon. • Four rigs in the north, regular newsflow. • Second rig to start at Pupino soon. • Geo teams moved to south of project. More difficult access. • Progress on application conversion. • Exercise option to move to Phase 2 by Sept 6th 2022. • Form formal JV, $2m

  12. Slide 12: Brazil - Ariquemes

    Brazil - Ariquemes • Large land holding (3,000km2) • Mining friendly region. • $3m over 4 years to earn 75%. • Key but unloved energy metal • High metal price, supply is fragile and very little ESG compliant production • Major province but under exploited and explored. • Other metals not exploited.

  13. Slide 13: Ariquemes – Granites and Greisens

    Ariquemes – Granites and Greisens • Three target styles – granite hosted, higher level veins, alluvial 13

  14. Slide 14: Ariquemes – Granites and Greisens

    Ariquemes – Granites and Greisens • Three target styles –higher level veins (BF), granite hosted, alluvial Bom Futuro 14

  15. Slide 15: Ariquemes – work commencing

    Ariquemes – work commencing • Engaged local consultants • Data compilation commenced • Established commercial structures (low cost and no long-term liabilities) • Stream sediment sampling July • Ongoing mapping, trenching, target generation. • Price coming off reduces hype – opens up opportunities f

  16. Slide 16: Argentina – El Pantano

    Argentina – El Pantano • Large land holding (600km2) in key endowed district. • Mining friendly • Few environmental issues • Near to major producing mine (Cerro Vanguardia – Anglo). • National scale power lines 40km away • Early stage but key geological indicators. • Zero entry cost and low-cost ear

  17. Slide 17: El Pantano – basic exploration

    El Pantano – basic exploration • No drilling ever undertaken. • Jurassic volcanics and major NW structural corridor. • Lithology and alteration suggestive of major low- sulphidation epithermal system • Anomalous high-grade sampling in and around the project • Two phases of Geochem undertaken. 17

  18. Slide 18: El Pantano – positive first signs

    El Pantano – positive first signs • Preliminary soils positive and indicative of epithermal system. • Return after winter for more targeting. View to drill in medium term? • Key is to add maximum value at minimum cost. 18

  19. Slide 19: Summary – the new Orosur

    Summary – the new Orosur • Anzà progressing as a major project off balance sheet. • Results from northern drilling imminent. • Nearing decision point to move to Phase 2 • Uruguay wound up. • Several other projects operating in parallel. • Balance sheet remains strong. 19

Orosur Mining — Investor Presentation (June 2022) on 6ix