Aura Energy Ltd · ASX:AEE
Aura Energy — London Mines & Money 2014
14 slides from Aura Energy's conference presentation, Dec 5, 2014

Slide 1: Aura Energy Limited – Developing High Margin Uranium Projects
London Mines & Money, 1-5 Dec 2014 Aura Energy Limited – ASX: AEE Developing High Margin Uranium Projects... At the CURRENT U Price Peter Reeve – Executive Chairman BOOTH H4

Slide 2: Disclaimer & Competent Persons Statement
Disclaimer & Competent Persons Statement This presentation has been prepared to provide information on Aura Energy Limited’s projects. It is not intended as an offer, invitation solicitation or recommendation with respect to the purchase or sale of any securities. This presentation should not be

Slide 3: Aura Energy Summary
Aura Energy Summary • Aura holds a globally significant uranium resource base in 2 projects; • Reguibat 50 Mlbs – Mauritania • Häggån 800Mlbs – Sweden • Scoping Studies completed on both projects • Reguibat project provides near term production & cashflow • C1 Cash cost - US$30/lb U3O8 • Capital cos

Slide 4: Aura Projects C1 Cash Costs
Aura Projects C1 Cash Costs 70 Uranium Long Term Price - $65/lb 60 50 Uranium Spot Price - $40/lb 40 $30/lb 30 $25/lb 20 $13.5/lb 10 0 Reguibat Häggån 1 Häggån 2

Slide 5: Reguibat Project’s Extraordinary Natural Attributes
Reguibat Project’s Extraordinary Natural Attributes Key project attributes: 1. Very shallow mining; 1-5 metres only 2. The uranium ore is simply upgradeable by up to 700% 3. Leach rate and extraction both very high Leads to a project that has; • Very small physical footprint • No grinding • Easily s

Slide 6: Uranium Mineralisation; 1-5 Metres from Surface
Uranium Mineralisation;1-5 Metres from Surface Metres 0 2 4 6 8 10 6

Slide 7: Reguibat Project Scoping Study
Reguibat Project Scoping Study • Shallow mining ~120 tph (1.0 Mtpa) • Simple wash and screen for upgrade • 25 tph to small leach facility • Mined grade >420ppm U₃O₈ for 15 years • Leach feed grade of 2500ppm U3O8 • Production circa 1.0 Mlbs U₃O₈ per year • 15 year mine life • Cumulative pre tax cash

Slide 8: Reguibat Surface Mineralisation
Reguibat Surface Mineralisation Friable mineralisation breaks down on digging Free dig truck and shovel mining Uranium Mineralisation - Carnotite 8

Slide 9: Mauritania – A Mining Country
Mauritania – A Mining Country Attracting Substantial Investment 9

Slide 10: Häggån Project Sweden
Häggån Project Sweden Pyrite 10 Black Schist with Quartz

Slide 11: Häggån Project – Long Life, High Margin U₃O₈
Häggån Project – Long Life, High Margin U₃O₈ Strategic European based uranium deposit 803Mlbs U₃O₈ in Inferred Resources – one of largest globally Completed Independent Scoping Study Key project attributes; 1. Simple open pit – thick continuous mineralisation from surface 2. Bacterial heap lea

Slide 12: Häggån – Low cost, Low risk, Mining Project
Häggån – Low cost, Low risk, Mining Project C1 Cash Capital Produced Project Cost Cost U₃O₈ ~ Credits Mtpa $m Mlbs $/lb 5.0 190 1.4 25-30 30 540 7.8 13.50

Slide 13: Aura Energy - Corporate Snapshot
Aura Energy - Corporate Snapshot Share price: 3.1 cents Market capitalisation: A$9.0 million Cash position: $1.7 M (23/11/14) Shares: 267 million Code: AEE (ASX) Board; Peter Reeve Executive Chairman Bob Beeson Managing Director Brett Fraser Non-Executive Board Member Jules Perkins Non-Executive Boa

Slide 14: Aura Energy - Summary
Aura Energy - Summary Aura progressing low capex and low opex project developments High margin projects imply significant value Aura can make money at today’s uranium price Reguibat Scoping Study successfully recently completed Reguibat’s beneficiation upgrade is simple and unique Capita
Source: Internet Archive copy of auraenergy.com.au
More decks from Aura Energy Ltd
Technical Presentation (October 2026)75 slides · Oct 19, 2026
121 Conference, London 202640 slides · May 2026
Africa Downunder 202517 slides · Sep 5, 2025
Investor Presentation (September 2025)23 slides · September 2025
Fact Sheet (February 2025)1 slide · February 2025
Investor Presentation (February 2025)21 slides · February 2025