    2 Disclaimer All statements in this presentation other than statements of historical fact are forward-looking statements, which are subject to a number of risks, uncertainties, and assumptions that are difficult to predict and are based upon assumptions as to future events that may not prove accurat

  3. Slide 3: Agenda

    Slide 3: Agenda

    3 Agenda Highlights Q2 2008 Financial results Status and outlook Summary

  4. Slide 4: The quarter in brief

    Slide 4: The quarter in brief

    4 The quarter in brief Best-ever financial quarterly result Split process completed Positive market outlook Day rates continue to increase Strong operational performance High utilisation rate Safe Esbjerg (99%) Set for continued strong development

  5. Slide 5: Income statement

    Slide 5: Income statement

    5 Income statement (Unaudited figures in USD million) Q2 08 Q1 08 Q2 07 H1 08 H1 07 2007 Operating revenues 125.9 105.0 95.9 230.9 162.4 376.7 Operating expenses (50.6) (51.0) (45.9) (101.6) (77.3) (167.3) EBITDA 75.3 54.0 50.0 129.3 85.1 209.4 Depreciation (11.9) (12.0) (11.5) (23.9) (22.9) (46.4)

  6. Slide 6: Offshore Support Services

    Slide 6: Offshore Support Services

    6 Offshore Support Services (Unaudited figures in USD million) Q2 08 Q1 08 Q2 07 H1 08 H1 07 2007 Operating revenues 126.5 97.9 95.8 224.4 162.2 376.1 Operating expenses (49.4) (48.6) (43.0) (98.0) (71.7) (154.3) EBITDA 77.1 49.3 52.8 126.4 90.5 221.8 Depreciation (11.9) (11.9) (11.4) (23.8) (22.7)

  7. Slide 7: Corporate and eliminations

    Slide 7: Corporate and eliminations

    7 Corporate and eliminations (Unaudited figures in USD million) Q2 08 Q1 08 Q2 07 H1 08 H1 07 2007 Operating revenues (0.6) 7.1 0.1 6.5 0.2 0.6 Operating expenses (1.2) (2.4) (2.9) (3.6) (5.6) (13.0) EBITDA (1.8) 4.7 (2.8) 2.9 (5.4) (12.4) Depreciation 0.0 (0.1) (0.1) (0.1) (0.2) (0.4) EBIT (1.8) 4.

  8. Slide 8: Balance sheet

    Slide 8: Balance sheet

    8 Balance sheet (Unaudited figures in USD million) 30.06.08 31.03.08 31.12.07 30.06.07 Goodwill 226.7 226.7 355.0 355.0 Rigs 760.7 753.6 749.6 760.3 Ships 0.0 0.0 926.5 701.2 Other non-current assets 3.2 1.5 304.6 281.3 Total non-current assets 990.6 981.8 2 335.7 2 097.8 Cash and deposits 118.6 74.

  9. Slide 9: Key figures

    Slide 9: Key figures

    9 Key figures Q2 08 Q1 08 Q2 07 H1 08 H1 07 2007 Operating margin 50.4 % 40.0 % 41.2 % 45.6 % 39.6 % 43.3 % Equity ratio 14.7 % 37.5 % 47.5 % 14.7 % 47.5 % 39.6 % Return on equity 36.8 % 19.2 % 16.7 % 35.7 % 11.3 % 13.5 % Net interest bearing debt 842.3 1 327.3 851.0 842.3 851.0 1 189.1

  10. Slide 10: Shareholders

    Slide 10: Shareholders

    10 Shareholders AS AT 20.08.2008 No. of shares Ownership Folketrygdfondet 16 961 735 7.4 % UBS (nom.) 14 130 209 6.1 % Brown Brothers Harriman 9 549 314 4.2 % GMO 8 590 985 3.7 % State Street Bank & Trust (nom.) 6 171 464 2.7 % Pareto 6 137 800 2.7 % Storebrand 4 878 985 2.1 % Fidelity Funds 4 800 0

  11. Slide 11: Operating revenues Offshore Support Services

    Slide 11: Operating revenues Offshore Support Services

    11 Operating revenues Offshore Support Services (USD million) YTD Q2 08 Q1 08 Charter income 172.4 98.6 73.8 Mob/demob income 13.4 0.7 12.7 Other income 38.6 27.2 11.4 Total 224.4 126.5 97.9

  12. Slide 12: Demand is increasing

    Slide 12: Demand is increasing

    12 Demand is increasing High exploration drilling activity High oil company E&P spending Growth in the number of new installations, especially in deep water Increasing repair and maintenance work Future growth in decommissioning activities Positioned to benefit from positive market outlook

  13. Slide 13: Repair and maintenance market

    Slide 13: Repair and maintenance market

    13 Repair and maintenance market UK and Norwegian North Sea Visible strong demand for accommodation rigs into 2011 in connection with maintenance and modification activities Gulf of Mexico Steady demand for accommodation rigs in relation to construction and maintenance

  14. Slide 14: Emerging markets

    Slide 14: Emerging markets

    14 Emerging markets West Africa Visible demand for flotels in connection with the support of installation and construction of new production facilities into 2012 Brazil Emerging market, MSV Regalia alongside Bonga FPSO possibilities for DP units for work in 2009

  15. Slide 15: Dominant position in harsh environments

    Slide 15: Dominant position in harsh environments

    15 Dominant position in harsh environments North Sea Norway Scotland Semis and jack-ups Semis Harsh / semi-harsh environment Cyprus Sakhalin Mostly semis GoM Mostly barges Singapore Semis and barges Deepwater regions Headquarters Offices Semis Rigs Mostly semis Operations as per August 2008

  16. Slide 16: Competitor situation

    Slide 16: Competitor situation

    16 Competitor situation Dynamically positioned semi rigs Anchored semi rigs Advanced units with high operational Primary strengths: versatility: Shallow to medium waterdepths All water depths Fixed installations Any seabed infrastructure Some floaters, e.g. TLPs Against fixed installations and most

  17. Slide 17: Newcomers

    Slide 17: Newcomers

    17 Newcomers Expected new entrants in the form of both mono-hulls and semi-submersibles Deliveries 2009 – 2011 Uncertain funding situation and construction cost

  18. Slide 18: Contract status

    Slide 18: Contract status

    18 Contract status Safe Astoria Asia Safe Bristolia Safe Esbje rg Safe Cale donia North Sea / Safe Scandinav ia Africa M SV Re galia Safe Concordia Safe Britannia ç 2001 è 2013 Safe Lancia ç 1998 Gulf of Safe Re ge ncy ç 1997 è 2013 Mexico Jasminia ç 1998 Safe Hibe rnia ç 2002 2006 2007 2008 2009 20

  19. Slide 19: Status operations

    Slide 19: Status operations

    19 Status operations Q2 was characterised by a high utilisation rate (99%) and solid operations Operational downtime on MSV Regalia in July 65-day contract for Safe Scandinavia in the UK sector of the North Sea at day rate of USD 350 000 6-month option for Safe Esbjerg exercised

  20. Slide 20: Steadily increasing day rates

    Slide 20: Steadily increasing day rates

    20 USD/day 100 000 150 000 200 000 250 000 300 000 350 000 400 000 0 50 000 okt.02 des.02 mar.03 Others Prosafe jun.03 sep.03 des.03 mar.04 jun.04 sep.04 des.04 mar.05 jun.05 sep.05 Award date des.05 mar.06 jun.06 sep.06 des.06 mar.07 Steadily increasing day rates jun.07 sep.07 des.07 mar.08 jun.08

  21. Slide 21: Upgrade and life extension of MSV Regalia

    Slide 21: Upgrade and life extension of MSV Regalia

    21 Upgrade and life extension of MSV Regalia Contract with yard in place Rig will enter the yard after the completion of current contract for Aker Kværner at MCP-01 Upgrade ensures 20 year further life in Norway Project to be completed in May 2009 MSV Regalia

  22. Slide 22: Main objectives for Q3/Q4

    Slide 22: Main objectives for Q3/Q4

    22 Main objectives for Q3/Q4 Secure contracts for: Safe Bristolia Safe Concordia Jasminia Investigate new growth opportunities

  23. Slide 23: Strategy going forward

    Slide 23: Strategy going forward

    23 Strategy going forward Seize interesting growth opportunities Share buy-back if and when appropriate Continue dividend payment Improved performance and continued growth

  24. Slide 24: Summary

    Slide 24: Summary

    24 Summary Positive market outlook Leading market position Unique, versatile rig fleet Solid track record Strong financial platform Solid earnings visibility Set for continued strong development

  25. Slide 25: Attachments

    Slide 25: Attachments

    25 Attachments

  26. Slide 26: Fleet overview

    Slide 26: Fleet overview

    26 Fleet overview Name MSV Regalia Safe Scandinavia Safe Caledonia Geographical area Harsh environment, NCS Harsh environment, NCS Harsh environment Mooring system - 12 point chain winches 10 point wire winches Station keeping NMD3 Moored DP2 / TAMS No of beds 160/380 583 516 Deck area 3,250 m2 400

  27. Slide 27: Fleet overview

    Slide 27: Fleet overview

    27 Fleet overview Name Safe Astoria Safe Bristolia Safe Esbjerg Geographical area Moderately harsh env. Moderately harsh env. Harsh environment Mooring system 8 point wire winches 8 point wire winches 4 point wire winches Station keeping Moored Moored Jack-up No of beds 245 612 139 Deck area 620 m2

  28. Slide 28: Fleet overview

    Slide 28: Fleet overview

    28 Fleet overview Name Safe Britannia Safe Lancia Safe Hibernia Geographical area Harsh env. Moderately harsh env. Harsh environment Mooring system 9 point wire winches 8 point chain winches 12 point wire winches Station keeping DP2 / TAMS DP2 Moored No of beds 812 600 500 Deck area 1,300 m2 1,100 m

  29. Slide 29: Fleet overview

    Slide 29: Fleet overview

    29 Fleet overview Name Safe Regency Safe Concordia Jasminia Geographical area Harsh environment Benign environment Benign environment Mooring system 8 point wire winches 4 point wire winches 8 point wire winches Station keeping DP1 DP2 Moored No of beds 771 390 535 Deck area 800 m2 1,300 m2 690 m2 P

  30. Slide 30: Financial calendar and IR contacts

    Slide 30: Financial calendar and IR contacts

    30 Financial calendar and IR contacts Financial calendar IR contacts 6 Nov 2008 Karl Ronny Klungtvedt Publication, presentation and web Exec. VP & CFO cast of Q3 2008 result karl.ronny.klungtvedt@prosafe.com Phone: +357 2462 1982 12 Feb 2009 Cell phone: +357 996 88 169 Publication, presentation and

Source: Internet Archive copy of prosafe.com

More decks from Prosafe SE

All 115 Prosafe decks