Pure Gold Mining — Investor Presentation (August 2017)
31 slides from Pure Gold Mining's investor presentation, August 2017
Slide 1: August 2017
August 2017 PGM:TSX-V
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statements regarding the Company’s expectations in respect of its fut
Slide 3: Pure Gold Mining: A Fresh Look at a Historic Producer
Pure Gold Mining A FRESH LOOK AT A HISTORIC PRODUCER Red Lake, Ontario, Canada – an established mining district with more JURISDICTION than 28 million ounces of high grade gold produced to date (1) One of the highest grade undeveloped deposits in the world (2) with HIGH GRADE current resources of 1,
Slide 4: Direct Red Lake Experience
Pure Gold Mining DIRECT RED LAKE EXPERIENCE Management & Technical Team Board of Directors Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Former VP Business Development, Terrane Metals Corp. • Former Director, Investment Banking at Canaccord Genuity • Former Chief Geologist, Plac
Slide 5: Capital Structure
Pure Gold Mining CAPITAL STRUCTURE Capital Structure (as at August 2, 2017) Key Shareholders (2) Shares Outstanding 191.5 million Management & Directors 4.9% Options Outstanding Strategic Shareholders 27.3% 13.3 million Weighted average exercise price $0.34 AngloGold Ashanti 10.8% Evanachan Ltd. (Ro
Slide 6: 2017 Focus on Growth
Pure Gold Mining 2017 FOCUS ON GROWTH 70,000m of drilling in fully funded Phase I exploration program Aggressive Drill Program Close to Infrastructure • Plan to grow resource and improve PEA metrics • Actively drilling from surface and underground • Significantly expanded resource - August 2017(1) •
Slide 7: Red Lake Mining District: Canadian High Grade Gold Belt
Red Lake Mining District CANADIAN HIGH GRADE GOLD BELT +28 million oz high-grade gold mined in Red Lake to date (1) • Established, mining-friendly jurisdiction with +85 year history • 1.6 million ounces of gold produced in the district at a grade of 18.8 g/t from 2013 to 2016 (2) • 47 km2 contiguous
Slide 8: Focused on Discovery in a Proven District
Madsen Gold Project FOCUSED ON DISCOVERY IN A PROVEN DISTRICT 3rd largest 2.5 million oz 9.9 g/t LAND PACKAGE IN RED LAKE HISTORICAL PRODUCTION (1) AVERAGE HISTORICAL GRADE (1) • Existing mill and tailings management facility • Second largest historic producer in Red Lake, with continuous historical
Slide 9: Focused on Discovery in a Proven District
Madsen Gold Project FOCUSED ON DISCOVERY IN A PROVEN DISTRICT Russet South Target Tailings Madsen Madsen #2 Shaft Management McVeigh Portal Facility and Decline Site Offices McVeigh Austin Mill Powerline 8
Slide 10: +$200 Million of Existing Infrastructure
Madsen Mine & Mill +$200 MILLION OF EXISTING INFRASTRUCTURE(1) Portal to underground ramp decline Interior of Madsen mill 1,275 metre deep shaft Existing tailings facility & 27 levels of workings Madsen mill (1) Management estimate to replace existing infrastructure at current cost estimates 9
Slide 11: Modern Science Driving Exploration
Madsen Gold Project MODERN SCIENCE DRIVING EXPLORATION • Multiple highly prospective targets currently being drill tested Portal to underground ramp decline 10
Slide 12: Multiple Gold Zones Open for Expansion
Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION 8 Zone Resource1 Ind: 379kt @ 20.8 g/t Au Inf: 142kt @ 16.3 g/t Au Note: Mine workings and geologic contacts in this image are schematic. (1) See news release August 2, 2017 for disclosure of Madsen mineral resource 11
Slide 13: Austin – McVeigh Setting
Madsen Mine Geology AUSTIN – MCVEIGH SETTING McVeigh • Limited near-surface production with a maximum historic mining depth of 230 metres • Recurrent south-plunging mineralized system • Open for expansion – focus of current drill program Austin • Hanging wall horizon mined from surface to a depth of
Slide 14: Targeting High Grade Gold Shoots at McVeigh
Madsen 2017 Drill Program TARGETING HIGH GRADE GOLD SHOOTS AT MCVEIGH A’ B’ 50.0 g/t Au 11.0 g/t Au 4.0 m 4.2 m 133.4 g/t Au 2.0 m 69.0 g/t Au 1.2 m 67.5 g/t Au 1.1 m 21.3 g/t Au 1.5 m 17.7 g/t Au 2.0 m Note: See Pure Gold news releases dated March 1, 2016, April 4, 2016, May 17, 2016, June 14, 2016
Slide 15: Austin Long Section – A3 Target
Madsen 2017 Drill Program AUSTIN LONG SECTION – A3 TARGET • New gold target located within the Austin Horizon, interpreted to be another sub-parallel gold bearing structure that is open in all directions(1) 16.7 g/t Au 1.0 m 25.4 g/t Au 8.0 m 58.8 g/t Au 2.0 m 6.2 g/t Au 3.3 m 14.3 g/t Au 1.0 m (1)
Slide 16: Targeting High Grade Gold Mineralization
Madsen 2017 Drill Program TARGETING HIGH GRADE GOLD MINERALIZATION Resource Growth Close to Mine Infrastructure • Geologic setting genetically and spatially links mineralization in multiple settings • A3 discovery is a direct application of modern exploration geoscience to a data rich project • Mine
Slide 17: +5km Mineralized System
Madsen Property +5km MINERALIZED SYSTEM Fork McVeigh Starratt Austin Significant Gold Mineralized System, Scale Potential • Austin open down plunge - hole AD-11-01 returns 14.3 g/t gold over 2.0m at 2.1km vertical depth • McVeigh open for expansion – drilling expanding gold mineralization outside of
Slide 18: Russet South: Potential for Near Surface Resource
Russet South POTENTIAL FOR NEAR SURFACE RESOURCE • Satellite gold target located ~1.5 km west of the McVeigh horizon and existing infrastructure • Russet South to be included in planned Q4 2017 resource update • New Zone of Mineralization Discovered PG17-335 returns 4.4 g/t gold over 12.0m including
Slide 19: Russet South: Potential for Near Surface Resource
Russet South POTENTIAL FOR NEAR SURFACE RESOURCE • Gold mineralization associated with quartz veining cutting multiple geologic contacts at low angles (1) See Pure Gold news releases dated May 11, 2017, March 27, 2017, November 14, 2016, April 11, 2016, March 16, 2015 and March 2, 2015 18
Slide 20: Roadmap to Value Creation
Pure Gold Mining ROADMAP TO VALUE CREATION Project Milestones Commence Madsen Site Satellite Underground Visit Deposits Drill Drilling Scoping Resource Results Q2,Q3, Studies Update Resource Q4 Update August 2, 70,000m Drilling 2017 Updated PEA Q3/Q4 July October Q4 2017 2017 2017 19
Slide 21: Investment Highlights
Pure Gold Mining INVESTMENT HIGHLIGHTS High grade deposit in a proven mining jurisdiction Actively growing resource through aggressive exploration program Existing infrastructure on-site contributes to favourable economics Proven management team with experience in Red Lake region Strategic investors
Slide 22: Appendix
APPENDIX % puregold dream big 21
Slide 23: Current Mineral Resource (August 2017)
Madsen Gold Project CURRENT MINERAL RESOURCE (August 2017) Grade Contained Gold Resource Classification Tonnes g/t Au (oz.) Indicated 5,785,000 8.9 1,648,000 Inferred 587,000 9.4 178,000 The updated mineral resource estimate for Madsen is reported at a 4.0 g/t Au cut-off effective August 2, 2017 (1)
Slide 24: Preliminary Economic Assessment (April 2016)
Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT (April 2016) • Initial PEA (April 2016) shows total gold 2016 PEA (1) production of ~260,000 ounces over a 6.5 year mine life at an average diluted head grade of Pre-Tax / After-Tax IRR 8.3 g/t gold (1) 74% / 62% Positive base case assessment of
Slide 25: 2016 PEA – Additional Details
Madsen Gold Project 2016 PEA – ADDITIONAL DETAILS • Underground mining via mechanized cut and fill, PEA SUMMARY PARAMETERS (1) shrinkage, and long-hole mining methods Gold Price US$1,175/oz • $20.1 million in pre-production capital costs over a Exchange Rate (US$ to C$) 0.80 12-month period Total Re
Slide 26: Madsen Gold Project Exploration Targets
Madsen Satellite Zones MADSEN GOLD PROJECT EXPLORATION TARGETS 25
Slide 27: Starratt
Madsen Satellite Zones STARRATT • Regional target associated with the historic Starratt Olsen Mine Located ~2.2km south of the Madsen No. 2 Shaft • Open down plunge and along strike, in an analogous geological setting to the McVeigh, South Austin and Austin horizons • Starratt Olsen Mine produced
Slide 28: Benchmarking vs. Peers – Resource Grade
Pure Gold Mining BENCHMARKING VS. PEERS – RESOURCE GRADE M&I Resource Grade 12.0 11.61 10.0 9.13 M&I Resource Grade (g/t Au) 8.90 8.72 8.42 8.0 5.87 6.0 4.91 4.09 4.0 3.50 2.66 1.63 2.0 0.0 (2) (1) Dalradian Integra Pure Gold Harte Osisko Sabina Gold Auryn Eastmain Condor Gold ATAC Midas Gold Inferr
Slide 29: Benchmarking vs. Peers – Market Cap & P/NAV
Pure Gold Mining BENCHMARKING VS. PEERS – MARKET CAP & P/NAV Price / NAV 0.97x 1.00x 0.86x 0.84x 0.74x 0.75x Price / NAV 0.50x 0.50x 0.42x 0.41x 0.24x 0.25x 0.00x Sabina Gold Integra Osisko Dalradian Pure Gold Midas Gold ATAC Eastmain Market Capitalization $830 $600 $525 $500 Market Cap (C$mm) $400
Slide 30: One of the World's Highest Grade Gold Projects
Madsen Gold Project ONE OF THE WORLD’S HIGHEST GRADE GOLD PROJECTS Select High Grade Gold Assets Hope Bay (TMAC) Back River (Sabina) Brucejack (VOK) Fire Creek Madsen Red Lake Brucejack (VOK) Cocheneur (Pretium) Jerusalem Zaruma Fire Creek & Midas Lamaque (Integra) (Klondex) Madsen Cocheneur & Red G
Slide 31: Corporate Inquiries
Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca