Golden Predator Mining — Investor Presentation (August 2016)
39 slides from Golden Predator Mining's investor presentation, August 2016
Slide 1: Deep Value Gold Resources In Canada's Yukon
Deep Value Gold Resources In Canada’s Yukon CORPORATE PRESENTATION – August 2016
Slide 2: Disclaimer
Disclaimer ©2016 Golden Predator Mining Corp. All rights reserved. Unless otherwise noted, “Golden Predator” and all other marks used in this presentation are trademarks of Golden Predator (the “Company”). Any reproduction or dissemination of any feature of this presentation, in whole or in part, or
Slide 3: Corporate Project Highlights
Corporate Project Highlights 3 Aces Project High Grade Orogenic Veins • District scale potential, 2 highest grade surface outcrops discovered to date in the Yukon • ~750 ton bulk sample, ongoing gravity processing • 2015 drilling encountered high grade Au in every hole including 7.5 ft from surface
Slide 4: Corporate Structure
Corporate Structure Market Capitalization (@ $0.88) 64,933,846 Shares Issued and Outstanding 73,788,462 Stock Options 4,692,500 Warrants ($0.15 due 02/25/18 & 03/03/18) 4,025,000 Warrants ($0.16 due 05/25/18) 1,274,000 Warrants ($0.21 due 05/25/18) 28,274,000 Warrants ($1.00 due 07/26/18) 10,988,530
Slide 5: Board of Directors
Board of Directors William M. Sheriff, MSc| Chairman • Chairman and founder of enCore Energy Corp., & Golden Predator • Co-founder and Chairman of Energy Metals Corporation, NYSE listed company sold to Uranium One for $1.8 billion dollars in 2007 Jesse Duke| Director • Principal of Ibex Valley Consu
Slide 6: Management
Management Janet Lee-Sheriff | Chief Executive Officer • 25 years of public, governmental and private sector experience • Founded the Yukon Mines Legacy Foundation the Yukon Gold Mining Alliance and as founding director of the Yukon Mines Training Association, secured $20 million in federal funding
Slide 7: First Nation Relations
First Nation Relations Accomplishments include • Socio Economic Accord (SEA) for Brewery Creek Project 2012 • Kaska Nation Exploration Accord • 50/50 Kaska Nation Partnership and Proposal on Reclamation Project (government bid – finished 2nd) • Developed and funded Yukon First Nation Trade Mission t
Slide 8: Brewery Creek Project
Brewery Creek Project TSX.V:GPY -8-
Slide 9: Brewery Creek Project - Overview
BREWERY CREEK PROJECT - Overview • Past open pit heap leach producer from 1996- 2002 before closing due to low gold prices • Preliminary Economic Assessment completed in Q4, 2014; revision likely to show significantly improved economics given sizeable decreases in fuel, labor and machinery costs • S
Slide 10: Brewery Creek Project: Claims & Tr'ondek Hwech'in Land Base
BREWERY CREEK PROJECT: Claims & Tr’ondek Hwech’in Land Base TSX.V:GPY -10-
Slide 11: Brewery Creek Project - Ownership History
BREWERY CREEK PROJECT – Ownership History • 1995 Loki Gold begins construction of Brewery Creek Mine first gold pour in 1996 • 2001 Active mining ceases and site goes into reclamation due to low gold prices and below forecasted gold recoveries • 2005 Alexco Resources Corporation acquires property •
Slide 12: Brewery Creek Project: Resource Growth 2009-2013
BREWERY CREEK PROJECT: Resource Growth: 2009-2013 GPY has spent over $30 MM in exploration since 2009 97,111 meters drilled, majority of which have been in-fill drilling Potential to further expand resources based on many untested targets 86% of all drilling has been on the Reserve Trend F
Slide 13: Brewery Creek Project: Deposits and Pits
BREWERY CREEK PROJECT: Deposits and Pits TSX.V:GPY -13-
Slide 14: Brewery Creek Project - Intrusion related gold model
BREWERY CREEK PROJECT – Intrusion related gold model TSX.V:GPY 14
Slide 15: Brewery Creek Project: Total Magnetic Intensity
BREWERY CREEK PROJECT: Total Magnetic Intensity The extensive magnetic signature is indicative of a large complex intrusive center underlying the southern part of the property and the likely source of the gold mineralized fluids. TSX.V:GPY -15-
Slide 16: Brewery Creek Project: Classic & Lone Star
BREWERY CREEK PROJECT: Classic & Lone Star Classic Inferred oxide 3.7 million tonnes at 0.81 gpt(1) Lone Star Looking North Inferred oxide 1.5 million tonnes at 0.88 gpt(1) TSX.V:GPY -16-
Slide 17: Brewery Creek Project: South Thrust
BREWERY CREEK PROJECT: South Thrust • Geologically, the South Thrust zone occupies a large (4 km long) north east trending southerly dipping thrust fault. This fault juxtaposes Silurian/Devonian Steel formation overtop Devonian Earn group sediments. • Similar to the Reserve Trend’s basal fault, the
Slide 18: Brewery Creek Project - 2014 Preliminary Economic Assessment
BREWERY CREEK PROJECT – 2014 Preliminary Economic Assessment(1) PEA Summary Mine Plan and Operating Assumptions Total Oxide mined from Open Pits (tonnes) 10,264,000 Total Waste mined from Open Pits (tonnes) 43,520,000 Strip Ratio open pits 4.2:1 Total Gold Ounces Contained 445,000 Average Diluted Gr
Slide 19: Brewery Creek Project - 2014 Preliminary Economic Assessment
BREWERY CREEK PROJECT – 2014 Preliminary Economic Assessment(1) Base Case $1250/oz. Gold PEA Capital and Operating Costs Truck and shovel operation mining from Capital Costs (including contingency) eight open pits with reprocessing of portion Total Direct Capital $59,480,000 of former leach materi
Slide 20: 3 Aces Project
3 Aces Project TSX.V:GPY -20-
Slide 21: 3 Aces Project: Emerging Orogenic Gold District
3 ACES PROJECT: Emerging Orogenic Gold District The 225 square kilometer 3 Aces project encompasses a newly emerging Orogenic Gold District in the southeastern Yukon. Orogenic Gold Districts have typically yielded millions of ounces of gold. These districts are often characterized by multi-million o
Slide 22: 3 Aces Project
3 ACES PROJECT Shear Hosted Orogenic Vein System with Bonanza Grade Gold • High-grade mineralized shoots outcrop at surface • Grab samples up to 4,820 g/t gold with multiple +1,000 g/t specimens from Main zone(10) • Channel samples from Sleeping Giant zone include 5.2 meters of 448 g/t gold(3) • Tot
Slide 23: 3 Aces Project
3 ACES PROJECT Shear Hosted Orogenic Vein System with Bonanza Grade Gold • 225 km2 property • Only gold mineralization encountered to date is associated Central Core with quartz veins while the Area ~10km2 country rock is essentially barren • Central Core area of 10 km2 contains 16 distinct zones of
Slide 24: 3 Aces Project: Extensive gold-in-soil anomalies
3 ACES PROJECT: Extensive gold-in-soil anomalies 3.5 km 3.0 km Bulk Sample Pit Multiple Quartz Veins with high grade 10.5 km2 Central Core Area of well defined gold-in-soil anomalies gold within Sleeping Giant Zone 24
Slide 25: 3 Aces Project: Sleeping Giant Vein
3 ACES PROJECT: Sleeping Giant Vein Bulk Sample Program 2016 • Completed a tightly spaced Rotary Air Blast (RAB) Sleeping Giant Zone - RAB Significant Results Table(12) drill program confirming gold mineralization in Hole From (ft) To (ft) Thickness (ft)1 Au oz/t2 Au g/t3 advance of bulk sampling ,
Slide 26: 3 Aces Project: Sleeping Giant Vein
3 ACES PROJECT: Sleeping Giant Vein Bulk Sample Program Q1 2016 • Phase 1 extracted and shipped approximately 750 tons of high grade vein material targeting the top 2.5 feet to 7.5 feet of the vein as dictated by 3-D polygonal evaluation of the 2015 RAB drill results(13) • The material has been and
Slide 27: 3 Aces Project: Current Gold Recovery
3 ACES PROJECT: Current Gold Recovery Shear Hosted Orogenic Vein System with Bonanza Grade Gold • Bulk sample gold recovery underway; ~750 ton stockpile • Simple gravity recovery in line with previous metallurgical testing by SGS which indicated gravity gold recoveries of approximately 80%(2) • Seco
Slide 28: Budget and Work Plans
Budget and Work Plans 2016 - 2017 TSX.V:GPY -28-
Slide 29: Proposed Corporate Work Plan and Budget
Proposed Corporate Work Plan and Budget Golden Predator Budget July 2016 - June 1017 2016 2017 Proceeds Start Ou/$1,200US Bulk Sample Feb-16 1,000 Ou $ 1,440,000 $ - Fall-16 2,000 Ou $ 2,880,000 Financing $ 20,000,000 $ - Total $ 21,440,000 $ 2,880,000 Expenditures Brewery Creek $ 3,802,500 $ 5,195,
Slide 30: Proposed Brewery Creek Budget: 2016 - 2017
Proposed Brewery Creek Budget: 2016 - 2017 Brewery Creek Budget 2016 Q3 & Q4 Exploration and Site Work Brewery Creek Operations $ 167,500 Geotech, Gound Water and Metallurgical Drilling $ 370,000 Geotech, Met Testing $ 100,000 Geotech, Ground Water engineering and report $ 300,000 Diamond Drilling U
Slide 31: Proposed Brewery Creek Deliverables: 2016 - 2017
Proposed Brewery Creek Deliverables: 2016 - 2017 • Metallurgical Drilling • Increase & Upgrade Resource – Inferred to Indicated • PEA Update/Trade Off Study • Permitting – YESAA ExCom Submission • Bankable Feasibility Study TSX.V:GPY -31-
Slide 32: Proposed 3 Aces Work Plan and Budget: 2016 - 2017
Proposed 3 Aces Work Plan and Budget: 2016 - 2017 2016 2017 Bridge Work Bridge Engineering & Design 20,000 0 Burdge Permit Appliction 20,000 0 Bridge Foundation/Roadwork 196,000 0 Temporary Bridge Install 110,000 0 Road Work Road Building - Access Road 100,000 0 Roads - Anomoly Zones 400,000 200,000
Slide 33: 3 Aces Project Proposed Work: Improved Year-Round Access
3 Aces Project Proposed Work Improved Year-Round Access • Previous exploration efforts almost exclusively helicopter supported at high cost • Winter bulk-sampling campaign necessitated the use of an ice-bridge • Existing river crossing subject to crossing limits, extensive mud and erosion issues and
Slide 34: 3 Aces Proposed Work: Road Access and Trenching of Soil Anomalies
3 Aces Project Proposed Work Road Access and Trenching of Tier- One Soil Anomalies • 16 distinct areas with soil anomalies >70 ppb form central core of project area • Significant work on the Main and Sleeping Giant Zone have identified a number of quartz veins with very high grade gold • Anomalous s
Slide 35: 3 Aces Project Proposed Work: Geophysical Surveys
3 Aces Project Proposed Work Geophysical Surveys • Property-wide • airborne Magnetic-EM • Cost $100,000 • Central Anomaly Area • Detailed close-spaced IP-Resistivity • 57 line km, 100m initial line spacing • Cost $ 200,000 • 2017 • Follow up with Detailed IP-Resistivity on key areas developed during
Slide 36: 3 Aces Project Proposed Work: Soil Geochemical Surveys
3 Aces Project Proposed Work Soil Geochemical Surveys • Previous soil sampling in central area has led to the identification of 15 significant gold anomalies • Main and Sleeping Giant Veins have received the most work; sampling, trenching, drilling and bulk sampling • Two other veins have been disco
Slide 37: 3 Aces Project Proposed Work: Drilling
3 Aces Project Proposed Work Drilling • Main Zone: 1000m RC drilling; 40m average depth of hole • Sleeping Giant Zone: 1000m RC drilling; 33m average depth of hole • Mesa area (SG Zone): 1000m RC drilling; 33m average depth of hole Put pix of drill here • New targets: 500m RC drilling • Core drillin
Slide 38: Endnotes
Endnotes 1) NI 43-101 Technical Report on Preliminary Economic Assessment for the Brewery Creek Property, Yukon Territory, Canada, Tetra-Tech EBA dated November 19, 2014 and filed on SEDAR. 2) Golden Predator News Release dated December 2, 2014. 3) Northern Tiger News Release dated August 8, 2012. 4
Slide 39: www.goldenpredator.com
510-580 Hornby Street Vancouver, BC Canada V6C 3B6 Janet Lee-Sheriff, CEO jel@goldenpredator.com www.goldenpredator.com
Golden Predator Mining — Investor Presentation (August 2016) on 6ix