Sm Energy Company · NYSE:SM

Sm Energy — IPAA OGIS NYC 2015

25 slides from Sm Energy's conference presentation, Apr 20, 2015

  1. Slide 1: IPAA OGIS NYC

    IPAA OGIS NYC Jay Ottoson President and CEO April 20, 2015

  2. Slide 2: Forward Looking Statements - Cautionary Language

    2 Forward Looking Statements - Cautionary Language Except for historical information contained herein, statements in this presentation, including information regarding the business of the Company, contain forward looking statements within the meaning of securities laws, including forecasts and proje

  3. Slide 3: Asset and Strategy Overview

    (1) Economic inventory consists of projects expected to achieve at least a 20% rate of return at 5-yr average strip pricing as of 2/23/15 and expected well costs. 3 Asset and Strategy Overview Williston Basin ~90 MMBOE (net) ~500 gross locations Eagle Ford ~900 MMBOE (net) ~1,050 gross locations Eco

  4. Slide 4: Financial Position

    Financial Position 4 Revolving Credit Facility 6.625% Senior Notes 6.50% Senior Notes Borrowing base reaffirmed at $2.4 billion at the April 2015 redetermination. Strong proved reserve adds at YE14 resulted in a maintained borrowing base in depressed commodity market. 6.125% Senior Notes 6.50% Senio

  5. Slide 5: 2015 Operated Activity

    5 2015 Operated Activity Reducing rig activity and building WOC inventory 0 10 20 30 40 50 60 70 80 90 100 0 2 4 6 8 10 12 14 16 18 20 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Wells Waiting on Completion Rigs Eagle Ford Bakken/Three Forks Powder River Basin Permian East Texas WOC inventory

  6. Slide 6: 2015 Capital Expenditures

    6 2015 Capital Expenditures Total CAPEX budget of $1,230 Op. Eagle Ford $470 Other $185 Bakken/Three Forks $255 Non - Op Eagle Ford $135 (in millions) $1,045 $185 Drilling and Completion Non-drilling and New Ventures

  7. Slide 7: Service Costs Coming Down

    7 Service Costs Coming Down 2015 budget assumed 15% - 20% service cost deflation by year-end. Company-wide costs currently are in-line with budgeted deflation assumptions. Drilling costs currently down 10% - 20%. Completions costs currently down 20% - 25%. Operated EF costs per stage down ~20% from

  8. Slide 8: 1Q15 Production Beat Expectations

    8 1Q15 Production Beat Expectations 175.8 186.4 Strong sequential production growth of 6% from 4Q14. Production beat primarily driven by better than expected well performance. Product mix essentially unchanged quarter to quarter. Company plans to revisit guidance after the completion of its Mid-Con

  9. Slide 9: Operated Eagle Ford Program

    9 TEXAS Operated Eagle Ford Program ~144,000 total net acres Dimmit Webb 44.8 48.1 43.0 54.2 56.2 8.2 7.9 7.1 9.7 9.8 23.3 27.2 26.1 29.7 32.1 0 20 40 60 80 100 120 1Q14 2Q14 3Q14 4Q14 1Q15e MBOE/d NGL Oil Gas 76.3 83.2 76.2 93.6 98.1

  10. Slide 10: Operated Eagle Ford Type Log

    10 Operated Eagle Ford Type Log Upper EF Lower EF SM Energy has some of the thickest total Eagle Ford Shale interval in the play. Identified several targets within the Upper and Lower Eagle Ford based on facies work. Thickness and geo-mechanical variability presents an opportunity for increased inve

  11. Slide 11: Upper Eagle Ford East Testing

    11 Upper Eagle Ford East Testing Proving up the viability of the Upper Eagle Ford Upper Eagle Ford East results are in-line with Lower Eagle Ford East type curve. Galvan Ranch B311H (Upper EF) Galvan Ranch C314H (Upper EF) East Area Type Curve 0 5 10 15 20 25 30 35 40 45 50 0 2 4 6 8 10 12 2 - STREA

  12. Slide 12: Upper Eagle Ford North Testing

    12 Upper Eagle Ford North Testing Proving up the viability of the Upper Eagle Ford Briscoe Catarina East 25H (Upper EF) Galvan Ranch LP GU5 State 20H North Area Type Curve (Upper EF) Upper Eagle Ford North results are in-line with Lower Eagle Ford North type curve. 0 5 10 15 20 25 30 35 40 45 0 2 4

  13. Slide 13: Eagle Ford Testing Road Map

    13 Eagle Ford Testing Road Map 12 well stacked/staggered 3Q15 completion 3 well stacked/staggered 3Q15 completion 2 well LEF “W” test 2Q15 completion 15 well LEF infill spacing test (625’ & 450’) 2Q15 completion 5 well LEF/UEF “W” test 3Q15 completion Successful stack/stagger development of the Eagl

  14. Slide 14: Williston Basin Acreage

    14 Williston Basin Acreage Divide Billings Dunn McKenzie Williams Roosevelt Sheridan Gooseneck: ~120,000 net acres Raven/Bear Den: ~40,000 net acres Total Williston Basin acreage: ~245,000 net acres 16.0 16.5 17.5 23.4 23.3 0 5 10 15 20 25 1Q14 2Q14 3Q14 4Q14 1Q15e MBOE/d

  15. Slide 15: Gooseneck Sweet Spot

    15 Gooseneck Sweet Spot Divide Burke Sheridan, MT Williams Decreasing reservoir quality Decreasing reservoir quality Sizeable acreage position in the sweet spot of Divide County, ND The geology deteriorates as you move east and west from the center section of Divide County. Decreasing thermal maturi

  16. Slide 16: Gooseneck Three Forks vs. Offset

    16 Gooseneck Three Forks vs. Offset Divide Gooseneck Three Forks program outperforms offset operators Three Forks Type Curve Offset Operator Results 0 2 4 6 8 10 12 14 16 1 3 5 7 9 11 13 15 17 19 21 23 CUMULATIVE PRODUCTION (MBOE/1000FT ) PRODUCING MONTHS

  17. Slide 17: Gooseneck Bakken

    Gooseneck Bakken Middle Bakken Wells 2015 Planned Bakken Completions Successful development of the Gooseneck Bakken has the potential to double the current inventory of 400 identified Gooseneck Three Forks locations. Three Forks Type Curve Bakken Well Results Bakken wells in Gooseneck are outperform

  18. Slide 18: Takeaways

    18 Takeaways SM Energy has a strong balance sheet, significant liquidity, and a robust inventory in core programs. Potential to add meaningful inventory in core programs in current pricing environment. Focus is on creating shareholder value and outperforming the peer group.

  19. Slide 19: Appendix

    19 Appendix

  20. Slide 20: Operated Eagle Ford – East

    Assumes $3.50/mmbtu gas, 40% WTI NGL realizations, and 25% reduction from YE14 well costs. Utilizes assumptions from IRR sensitivity using $65/bbl oil. 21 Operated Eagle Ford – East Strong asset continues to provide top-tier returns. Assuming single interval development, SM Energy has identified mor

  21. Slide 21: Operated Eagle Ford – North

    Assumes $3.50/mmbtu gas, 40% WTI NGL realizations, and 25% reduction from YE14 well costs. Utilizes assumptions from IRR sensitivity using $65/bbl oil. 22 Current type curve Operated Eagle Ford – North Improved completions have enhanced this asset. Assuming single interval development, SM Energy has

  22. Slide 22: Operated Eagle Ford – South

    23 Operated Eagle Ford – South Wells in southern acreage provide an economic dry gas option. Assuming single interval development, SM Energy has identified more than 200 locations on its operated Eagle Ford South area. Webb Mexico Dimmit Historical well results Represents 25% reduction from YE14 wel

  23. Slide 23: Eagle Ford North Stack/Stagger Pilot

    24 Eagle Ford North Stack/Stagger Pilot ~85’ ~120’ 1 PAD Upper and Lower EF development well spacing in targeted facies ~70’ ~175 ft Austin Chalk Upper Eagle Ford Lower Eagle Ford ~200 ft 525’ 263’ 262’ 525’ 525’ ~85’ ~120’ ~110’ 1 PAD

  24. Slide 24: Gooseneck – Three Forks

    Assumes $3.50/mmbtu gas, 40% WTI NGL realizations, and 25% reduction from YE14 well costs. Utilizes assumptions from IRR sensitivity using $65/bbl oil. 25 Gooseneck – Three Forks Under current assumptions, SM Energy has identified more than 400 Three Forks locations on its operated Gooseneck acreage

  25. Slide 25: Raven/Bear Den – Bakken

    Assumes $3.50/mmbtu gas, 40% WTI NGL realizations, and 25% reduction from YE14 well costs. Utilizes assumptions from IRR sensitivity using $65/bbl oil. 26 Raven/Bear Den – Bakken Under current assumptions, SM Energy has identified more than 75 Bakken locations on its operated Raven/Bear Den acreage.

SM Energy — IPAA OGIS NYC 2015 on 6ix