Ferrovial N.v. · BME:FER

Ferrovial — Investor Presentation (July 2026)

142 slides from Ferrovial's investor presentation, Jul 31, 2026

  1. Slide 1: Investor Presentation Equity Story & Fact Book May 2026

    1 Investor Presentation Equity Story & Fact Book May 2026

  2. Slide 2: Equity Story

    2 1 EQUITY STORY • Business Model • Why Ferrovial? • Looking ahead

  3. Slide 3: One of North America's leading road and airport infrastructure companies

    3 One of North America’s leading road and airport infrastructure companies (1) Total Shareholder Return (TSR): calculated considering dividends received and change in share price. Bloomberg data as of December 31, 2025. (2) Parent company. Fitch and S&P ratings. (3) Analysts’ consensus as of Decembe

  4. Slide 4: Stock price has outperformed most major indices over 10 years

    4 Ferrovial’s stock price has outperformed most major indices over the last 10 years TOTAL SHAREHOLDER RETURN1 (1) Total Shareholder Return (TSR): calculated considering dividends received and change in share price. Bloomberg data as of December 31, 2025. FERROVIAL; 255% S&P Global Infra; 147% DJ Br

  5. Slide 5: Long-term value creation from growing infrastructure assets

    5 DEC'16 DEC'17 DEC'18 DEC'19 DEC'20 DEC'21 DEC'22 DEC'23 DEC'24 DEC'25 4x Equity value of infrastructure assets 89%2 Contribution from infrastructure assets’ valuation (70% in Dec’16) Airports Other Highways I-77 I-66 DFW Express Lanes 407 ETR Ferrovial’s Total Equity Value1 (Analysts) €15.2B FERRO

  6. Slide 6: Integrated platform to develop infrastructure projects

    6 INTEGRATED PLATFORM TO DEVELOP INFRASTRUCTURE PROJECTS WITH HIGH VALUE CREATION (1) Business unit valuation breakdown (%) based on analysts’ consensus as of December 2025. Valuations are based on external assumptions and expectations. Construction represents 7% of Analysts’ equity value, Airports

  7. Slide 7: Why

    7 Why Unique infrastructure assets in North America Growth in new greenfield projects in North America Value creation in selected projects in other countries Solid cash flow generation and financial discipline

  8. Slide 8: Unique infrastructure assets in North America

    8 Unique infrastructure assets in North America (1) Refers to growth for the Greater Toronto Area (GTA). Ontario population projections | ontario.ca (2) Charlotte Regional Transportation Planning Organization (CRTPO). Refers to growth for the Charlotte region. The Charlotte Region 2025-2050 Growth P

  9. Slide 9: High degree of freedom to set prices

    9 High degree of freedom to set prices (1) This percentage reflects the agreement announced on March 13, 2025, by Ferrovial to acquire up to a 5.06% stake from AtkinsRéalis, considering the exercised put-call option (2) CPI growth calculated as the average yearly growth of the consumer price index i

  10. Slide 10: Main highways resilient performance in uncertain scenarios

    10 1.5% 7.2% 12.6%10.7% 9.8% 9.3% 10.6% 14.2% 17.3% 12.1% 9.7% 8.1% -43.5% 16.1% 32.6% 12.7% 15.1% 14.2% 1.1% -1.7% 5.5% 4.6% 3.1% 2.3% 4.4% 4.6% 4.0% 4.3% 4.3% 3.9% -2.1% 11.0% 9.8% 6.9% 5.1% 3.2% 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 EBITDA growt

  11. Slide 11: Value creation levers

    Value creation levers ASSET FEATURES THAT DRIVE COMPOUNDING GROWTH IN LONG-TERM CONCESSIONS DERISKING ROLLING FORWARD NPV OF REMAINING CASH FLOW ‘CONCESSION TERM | CONSTRUCTION RAMP-UP GROWTH / MATURITY. ’ MATURITY Design & Construction - RAMP UP. Conenionmental, RoW : = H Trafic Revenue Talc / Reve

  12. Slide 12: Robust pipeline and increased P3 interest in the US

    12 Atlanta, GA I-285 E I-285 W Charlotte, NC I-77S Nashville,TN I-24 | I-65 Pipeline 6 PROJECTS Alexandria, VA I-495 SW PRIVATE SECTOR KEY TO NARROW THE FUNDING GAP Population growth in cities & increased congestion leads to new infrastructure project needs US airport traffic expected to grow +43% b

  13. Slide 13: Selective investments in high-growth sectors & geographies

    13 UNIQUE INFRASTRUCTURE ASSETS IN NORTH AMERICA VALUE CREATION IN SELECTED PROJECTS IN OTHER COUNTRIES SOLID CASH FLOW GENERATION & FINANCIAL DISCIPLINE GROWTH IN NEW GREENFIELD PROJECTS IN NORTH AMERICA Why Selective investments in high-growth sectors & geographies Ferrovial’s approach: Leveraging

  14. Slide 14: Highways' growing dividend trend

    14 DIVIDENDS FROM HIGHWAYS PROJECTS € M UNIQUE INFRASTRUCTURE ASSETS IN NORTH AMERICA VALUE CREATION IN SELECTED PROJECTS IN OTHER COUNTRIES SOLID CASH FLOW GENERATION & FINANCIAL DISCIPLINE GROWTH IN NEW GREENFIELD PROJECTS IN NORTH AMERICA Why Highways’ growing dividend trend: a strong foundation

  15. Slide 15: Capital allocation criteria

    15 CAPITAL ALLOCATION CRITERIA Investing for growth while keeping sound shareholder distributions1. The latter would be expected to increase if capital is not deployed. New equity investments - Top priority: MLs projects in the US Committed to BBB rating Execute committed investments in ongoing proj

  16. Slide 16: Looking ahead

    16 Looking ahead UNIQUE INFRASTRUCTURE ASSETS IN NORTH AMERICA VALUE CREATION IN SELECTED PROJECTS IN OTHER COUNTRIES SOLID CASH FLOW GENERATION & FINANCIAL DISCIPLINE GROWTH IN NEW GREENFIELD PROJECTS IN NORTH AMERICA Why UNIQUE POSITION TO CAPTURE GROWTH FROM VALUE-ACCRETIVE PIPELINE GROWTH SUPPOR

  17. Slide 17: Which approach best captures Ferrovial's real value?

    17 WHICH APPROACH BEST CAPTURES FERROVIAL’S REAL VALUE?

  18. Slide 18: How to assess Ferrovial's assets value?

    18 How to assess Ferrovial’s assets value? Valuation Multiples don’t adequately reflect Ferrovial's valuation, as they are limited in capturing… GROWTH POTENTIAL DURATION RISK PROFILE CAPITAL STRUCTURE Some key infra-assets consolidated under equity method are not included in adj. EBITDA…although re

  19. Slide 19: Highways

    19 HIGHWAYS

  20. Slide 20: Complex infrastructure projects with pricing flexibility and long duration

    20 (1) Figures as of Dec. 2025. The number of concessions includes IRB and IRB Trust as one concession each. (2) Analysts’ consensus valuation as of Dec. 2025. (3) Exchange rate USD/EUR: 1.1736 CAD/EUR: 1.609. Complex infrastructure projects with pricing flexibility, long duration and located in hig

  21. Slide 21: 407 ETR Toronto (Canada)

    21 407 ETR Toronto (Canada)

  22. Slide 22: 407 ETR asset overview

    22 Asset overview » 407 ETR is located in Toronto, Canada. It stretches from Burlington (in the West) to Pickering (in the East). » A fast-growing area in Canada’s largest economic hub. » Toronto is the 2nd most congested city in Canada and 9th in North America1. » GTA (Greater Toronto Area) is proj

  23. Slide 23: Customer Insights

    23 Customer Insights1 (1) Source: 2025 Survey conducted by for 407ETR. The survey was conducted among a representative sample of n=53,808 407ETR customers (2) 40% calculated using 2019 data, as the number of trips using 407ETR with no alternative route divided by the total number of trips using 407E

  24. Slide 24: Historical financial figures 407 ETR

    24 Historical financial figures HIGHWAYS | 407 ETR 1,135 1,268 1,390 1,505 909 1,023 1,327 1,495 1,705 2,009 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 TOTAL REVENUE (C$ M) 790 845 920 1,050 563 600 750 950 1,100 1,500 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 DIVIDENDS AT 100% (C$ M)

  25. Slide 25: 407 ETR has flexibility to set toll rates

    25 » Flexible tolling regime designed to provide congestion relief in the corridor. » Rates are structured to keep 407 ETR fast, safe and reliable. » Flexibility to charge different tolls for each segment, direction and time with no cap. » Toll rate changes can be introduced at any time, with a one-

  26. Slide 26: Congestion Payment (Schedule 22)

    26 » The Contract includes payments to the Province if traffic levels remain below contract-set minimum relief traffic thresholds. If two conditions are met: » TOLL RATES: Standard rate (toll rate) > Toll rate threshold » TRAFFIC: Average segment flow rate (Traffic Level) < Traffic Threshold Congest

  27. Slide 27: Dividends & Financial Structure 407 ETR

    27 56% of debt maturing in more than 15 years. Dividends & Financial Structure HIGHWAYS | 407 ETR DEBT SENIOR BONDS SUBORDINATED BONDS JUNIOR BONDS SYNDICATED CREDIT FACILITY Principal (C$M) 10,478 1,150 164 800 Interest rate 4.23% 4.92% 7.13% Drawn: BA+80pbs Undrawn: 16pbs Maturity 2026-2055 2028-2

  28. Slide 28: Expansion requirements

    28 Expansion requirements: Schedule 22, Article 4 » An Expandable Segment is defined as a segment that has not reached its Ultimate Number of Core Lanes and the Lane Flow Rate exceeding 1,700 vehicles during a Peak Hour for more than 125 Hours in a calendar year » The designated Expandable Segment e

  29. Slide 29: Information (SEDAR filings)

    29 Information » SEDAR is an electronic filing system that allows listed companies to report their securities-related information to Canada’s securities regulation authorities. » SEDAR is the Canadian equivalent of the SEC's EDGAR, the U.S. electronic system for filing securities information. » More

  30. Slide 30: US Express Lanes

    US Express Lanes 30

  31. Slide 31: Asset description (I) US Managed Lanes

    31 » A solution to congestion on existing urban corridors through active management of newly added capacity through dynamic pricing » Every driver has the option to pay for a faster, safer and more reliable trip » Dynamic pricing guarantees minimum level of service » Free Flow, fully electronic toll

  32. Slide 32: Asset description (II) US Managed Lanes

    32 Asset description (II) HIGHWAYS | US MANAGED LANES (1) Pre-Mandatory Capacity Improvement. The project consists of the addition of 1 lane in GPL in each direction on the segment 1 and 1 lane of MLs in each direction on the Segment 2. Please, see more detail on slide 46. Location Dallas Fort-Worth

  33. Slide 33: Asset description (III) US Managed Lanes

    33 Asset description (III) HIGHWAYS | US MANAGED LANES Dynamic tolling Price adapts in real time with potential toll rate changes every 5 minutes Price adapts in real time with potential toll rate changes every 3 minutes Price adapts in real time with potential toll rate changes every 5 minutes Toll

  34. Slide 34: NTE | LBJ | NTE 35W Dallas Fort-Worth

    NTE | LBJ | NTE 35W Dallas Fort-Worth

  35. Slide 35: Overview NTE, LBJ & NTE 35W

    35 » DFW is a metroplex with a widespread population and multiple employment centers » The area ranked 1st in the US for absolute population growth1 » Estimated population growth in the North and West expected to stress the already congested network Overview HIGHWAYS | NTE, LBJ & NTE 35W SIGNIFICANT

  36. Slide 36: Customer Insights

    36 Customer Insights1 (1) The figures represent the average across the three assets: NTE, LBJ and NTE35W. Except for daily trips, which represent the sum of the average daily trips across the three assets. (2) Source: 2025 Annual Survey, conducted by Innovative Research Group (INNOVATIVE) for LBJ/NT

  37. Slide 37: Historical Financial Figures NTE

    37 Historical Financial Figures HIGHWAYS | NTE MCI construction started 2023 116 153 125 187 243 289 299 323 2018 2019 2020 2021 2022 2023 2024 2025 TOTAL REVENUE ($M) 98 129 106 164 213 255 264 278 84.1% 84.6%84.9% 87.4% 87.9% 88.3% 88.1% 86.0% 2018 2019 2020 2021 2022 2023 2024 2025 ADJUSTED EBITD

  38. Slide 38: Historical Financial Figures LBJ

    38 Historical Financial Figures HIGHWAYS | LBJ 126 153 104 133 159 193 225 244 2018 2019 2020 2021 2022 2023 2024 2025 TOTAL REVENUE ($M) 103 127 72 102 128 158 185 202 82.0% 83.3% 69.1% 77.0% 80.1% 81.9% 82.3% 82.7% 2018 2019 2020 2021 2022 2023 2024 2025 ADJUSTED EBITDA ($M) 229 360 60 74 107 123

  39. Slide 39: Historical Financial Figures NTE 35W

    39 Historical Financial Figures HIGHWAYS | NTE 35W 3C construction started 2023 37 90 98 142 168 234 320 368 2018 2019 2020 2021 2022 2023 2024 2025 TOTAL REVENUE ($M) 27 54 82 119 139 195 266 294 74.2% 60.1% 83.4% 83.9% 82.6% 83.1% 83.1%80.1% 50% 70% 90% 25 125 225 2018 2019 2020 2021 2022 2023 202

  40. Slide 40: Pricing framework

    40 $1.156/mi 1 TAG (PRE-PAID): If vehicle is equipped with an electronic tag, driver will pay the price on the sign and no additional fees. HOV Discount: pre-declared HOV’s are entitled to a 50% discount during peak hours. Reimbursed to the concession by the local authority. EXEMPT VEHICLES: Police,

  41. Slide 41: Revenue Structure

    41 Toll revenue (approx. 99% of total revenue): » NTTA (North Texas Tollway Authority) bills customers and performs collection services on behalf of the Concession Company with collection risks fully borne by NTTA. TxDot pays within 2-3 business days after the transaction files are received from the

  42. Slide 42: Contractual payments to TxDOT

    42 » TxDOT’s right to a portion of any Refinancing Gain, and to a potential gain from an Initial Financing. » Calculation Methodology: Net Present Value (NPV) of the variance between the dividends of the pre- refinancing structure and that of the new financial structure at the refinancing date. In t

  43. Slide 43: Dividends & Financial Structure NTE

    43 0 20 40 60 80 100 20 26 20 27 20 28 20 29 20 30 20 31 20 32 20 33 20 34 20 35 20 36 20 37 20 38 20 39 20 40 20 41 20 42 20 43 20 44 20 45 20 46 20 47 20 48 20 49 20 50 20 51 20 52 20 53 20 54 20 55 20 56 20 57 20 58 PABs 2019 Taxable Bonds 2019 PABs 2023 Dividends & Financial Structure DEBT MATUR

  44. Slide 44: Dividends & Financial Structure LBJ

    44 0 20 40 60 80 100 20 26 20 27 20 28 20 29 20 30 20 31 20 32 20 33 20 34 20 35 20 36 20 37 20 38 20 39 20 40 20 41 20 42 20 43 20 44 20 45 20 46 20 47 20 48 20 49 20 50 20 51 20 52 20 53 20 54 20 55 20 56 20 57 20 58 PABs 2020 PABs 2021 Taxable Bonds 2020 TIFIA CAPEX FACILITY Dividends & Financial

  45. Slide 45: Dividends & Financial Structure NTE 35W

    45 0 50 100 150 200 250 20 26 20 27 20 28 20 29 20 30 20 31 20 32 20 33 20 34 20 35 20 36 20 37 20 38 20 39 20 40 20 41 20 42 20 43 20 44 20 45 20 46 20 47 20 48 20 49 20 50 20 51 20 52 20 53 20 54 20 55 20 56 20 57 20 58 TIFIA PABs 2019 Barclays debt 2023 PABs 2023 Barclays debt 2025 Dividends & Fi

  46. Slide 46: NTE - Mandatory Capacity Improvements

    46 » Contractual obligation to design and build the Mandatory Capacity Improvements once certain revenue thresholds are met. » The project consists of the addition of 1 GPL per direction on segment 1 and 1 ML per direction on Segment 2. » Given the asset’s positive performance, the obligation to exe

  47. Slide 47: NTE 35W 3A 3B 3C and braided ramps

    47 » Project Description: The Concession will be responsible to design, build, operate and maintain an additional General Purpose Lane (GPL) per direction of segments 3A3B. TxDOT will fully fund the investment and, it will compensate for any revenue loss derived from the construction works or/and th

  48. Slide 48: Information (EMMA reporting)

    48 WEB PAGE • NTE: https://emma.msrb.org/IssueView/Details/P1423055 • LBJ: https://emma.msrb.org/IssueView/Details/P1404295 • NTE 35W: https://emma.msrb.org/IssueView/Details/P2425964 Reported information » Audited Financial Statements. » Unaudited Quarterly Financial Statements. » Budget: includes

  49. Slide 49: I-66 Northern Virginia

    I-66 Northern Virginia

  50. Slide 50: Overview I-66

    50 » I-66 is the main east-west interstate highway in Northern Virginia connecting Washington DC and Arlington with the Northern Virginia suburbs. » Design & Construction of 2 Express Lanes and modification of the existing design to accommodate 3 general purpose lanes in each direction. » Directiona

  51. Slide 51: Customer Insights I-66

    51 Customer Insights1 HIGHWAYS | I-66 (1) 2025 Annual Survey, conducted by Innovative Research Group (INNOVATIVE) for I66 and Cintra. The survey was conducted among a representative sample of n=604 North Virginia area residents with data collection happening between October 17th and November 4th, 20

  52. Slide 52: Historical financial figures I-66

    52 Historical financial figures HIGHWAYS | I-66 167 247 303 2023 2024 2025 TOTAL REVENUE ($M) 129 196 246 76.9% 79.5% 81.4% 1 1 1 1 1 2023 2024 2025 ADJUSTED EBITDA ($M) 172 165 2024 2025 DIVIDENDS AT 100% ($M) 29 32 35 2023 2024 2025 TRANSACTIONS (M) 5.5 7.4 8.4 2023 2024 2025 TOLL REVENUE PER TRAN

  53. Slide 53: Pricing framework

    53 The 66 Express Lanes offer a dynamic pricing system that adjusts toll rates based on real-time traffic conditions and demand. This dynamic system is designed to prevent congestion, keep traffic flowing in the express lanes at minimum speeds of 55 mph. When demand increases, tolls adjust upward, b

  54. Slide 54: Revenue structure

    54 Toll revenue (approx. 96% of total revenue): » Transponder/tag customers: I-66 collects 100% of revenue from VDOT. » Video customers (vehicles without a transponder): I-66 EMP directly bills and performs collection services, and bears the risk related to collecting revenue from video trips. Other

  55. Slide 55: Contractual payments to the Department of Transportation

    55 Contractual payments to the Department of Transportation » Requirement under the Concession Agreement. » Compares the Net Present Value of actual cumulative revenues from the opening date, with specific “NPV Bands” defined at Financial Close. » Whenever the Net Present Value of actual cumulative

  56. Slide 56: Dividends & Financial Structure I-66

    56 0 20 40 60 80 100 20 26 20 27 20 28 20 29 20 30 20 31 20 32 20 33 20 34 20 35 20 36 20 37 20 38 20 39 20 40 20 41 20 42 20 43 20 44 20 45 20 46 20 47 20 48 20 49 20 50 20 51 20 52 20 53 20 54 20 55 20 56 20 57 PABs 2017 TIFIA (including capitalized interest) Virginia Small Business Financing Auth

  57. Slide 57: Information

    57 WEB PAGE https://emma.msrb.org/IssueView/Details/ES381888Information » The information to be reported is collected in the 15c2- 12 "Municipal securities disclosure" regulation of the Exchange Act. » In the case of the I66 concession, it is found in the “Continuing Discloser agreement“. » More inf

  58. Slide 58: I-77 Charlotte | North Carolina

    I-77 Charlotte | North Carolina

  59. Slide 59: Overview I-77

    59 Davidson Uptown Charlotte I-77 Lake Norman Mooresville Overview HIGHWAYS | I-77 Expected % Population growth from 2015 to 2045 1 N o C h a n g e 0 % t o 1 0 0 % 1 0 1 % t o 2 0 0 % G r e a t e r t h a n 2 0 0 % C R T P O P l a n n i n g A r e a A key growth enabler for Charlotte region » I-77 is

  60. Slide 60: Customer Insights I-77

    60 Customer Insights1 HIGHWAYS | I-77 (1) 2025 Annual Survey, conducted by Innovative Research Group (INNOVATIVE) for I77 and Cintra. The survey was conducted among a representative sample of n=610 Charlotte area residents with data collection happening between October 17th and November 4th, 2025. $

  61. Slide 61: Historical financial figures I-77

    61 Historical financial figures HIGHWAYS | I-77 18 36 61 91 107 130 2020 2021 2022 2023 2024 2025 TOTAL REVENUE ($M) 4 20 38 66 69 81 24.9% 54.9% 62.9% 72.0% 65.1% 62.2% 1.00 10.00 100.00 0 0 0 1 1 2020 2021 2022 2023 2024 2025 ADJUSTED EBITDA ($M) 307 52 2024 2025 DIVIDENDS AT 100% ($M) 20 28 35 41

  62. Slide 62: Pricing framework

    62 (1) Even though trucks were not part of the original concession agreement, a final amendment for the Extended Vehicles was agreed in September 2024 with NCDOT (North Carolina Department of Transportation) to allow them to use the ML´s Pricing framework HIGHWAYS | I-77 Dynamic pricing system that

  63. Slide 63: Revenue structure

    63 Revenue structure Toll revenue (approx. 99% of total revenue): » NCDOT bills customers and performs collection services on behalf of the Concession Company. Collection risk is fully borne by NCDOT, which pays within 5 business days after the transaction files are received from the Concession Comp

  64. Slide 64: Contractual payments to the Department of Transportation

    64 » DOT’s right to a portion of any Refinancing Gain, including a gain from an Initial Financing. » Calculation Methodology: Net Present Value (NPV) of the variance between the dividends of the pre-refinancing structure and that of the new financial structure at the refinancing date. In the event o

  65. Slide 65: Dividends & Financial Structure I-77

    65 0 10 20 30 40 50 60 70 80 90 20 26 20 27 20 28 20 29 20 30 20 31 20 32 20 33 20 34 20 35 20 36 20 37 20 38 20 39 20 40 20 41 20 42 20 43 20 44 20 45 20 46 20 47 20 48 20 49 20 50 20 51 20 52 20 53 20 54 PABs 2015 USPP 2024 North Carolina Department of Transportation (msrb.org) HIGHWAYS | I-77 Div

  66. Slide 66: Information

    66 WEB PAGE https://emma.msrb.org/IssueView/Details/ER368770 Information » The information to be reported is collected in the 15c2-12 "Municipal securities disclosure" regulation of the Exchange Act. » In the case of the I77 concession, it is found in the “Continuing Discloser agreement“. » More inf

  67. Slide 67: IRB Infrastructure Developers LTD (India)

    IRB Infrastructure Developers LTD (India)

  68. Slide 68: IRB investment rationale

    68 IRB investment rationale HIGHWAYS | IRB INFRASTRUCTURE DEVELOPERS, LTD • Value creation in selected investments outside North America where Ferrovial can find high long-term growth prospects • Population growth expected to lead the largest middle class in the world • One of the biggest highway co

  69. Slide 69: Company Overview IRB

    69 Company Overview HIGHWAYS | IRB INFRASTRUCTURE DEVELOPERS, LTD BOT: Build-Operate-Transfer - HAM: Hybrid Annuity Model - TOT: Toll, Operate and Transfer Information provided by IRB Corporate Presentation – IRB Infrastructure Developers Ltd. » Cintra acquired a 23.99% stake of IRB Private InVIT (6

  70. Slide 70: Asset description IRB

    70 » Focus on developing BOT projects, which offer high return potential. Experienced EPC player with a strong track record of developing roads. » Assets are located in states with high gross state domestic product and healthy traffic growth potential. Strong correlation between traffic growth and I

  71. Slide 71: Asset description IRB shareholders and investments

    71 Asset description HIGHWAYS | IRB INFRASTRUCTURE DEVELOPERS, LTD Shareholders: 30.42% Promoter entities - 19.86% Cintra – 16.94% GIC – 32.78% Others InvIT Investments Public InvIT (16%) Project Type Mumbai Pune TOT TOT Ahmedabad Vadodara BOT BOT Pathankot-Mandi NH 154 HAM Chittoor-Thachur NH 716B

  72. Slide 72: Wholly Owned Concessions (100%)

    72 Asset description - Wholly Owned Concessions (100%) HIGHWAYS | IRB INFRASTRUCTURE DEVELOPERS, LTD IRB has a healthy mix of TOT, BOT, and HAM projects Project State Project cost (INR B) Lane KM Type Status Concession End Date Mumbai Pune Maharashtra 89 1,014 TOT Tolling Apr 2030 Ahmedabad Vadodara

  73. Slide 73: Private InvIT (51%)

    73 Asset description - Private InvIT (51%) HIGHWAYS | IRB INFRASTRUCTURE DEVELOPERS, LTD Private InvIT - Capital Structure 51% 25% 24% Private InvIT MMK 10 BOTs 3 TOTs Recent awards 2 TOTs Project State Project cost (INR bn) Lane KM Status Type Concession End Date1 Goa Kundapur Karnataka 37 758 Toll

  74. Slide 74: Public InvIT (16%)

    74 Asset description – Public InvIT (16%) HIGHWAYS | IRB INFRASTRUCTURE DEVELOPERS, LTD Project State Project cost (INR bn) Lane KM Status Type Concession End Date1 Talegaon - Amravati Maharashtra 8.9 267 Tolling BOT Jun 2037 Amritsar Pathankot Punjab 14.5 410 Tolling BOT Jan 2038 Jaipur Deoli Rajas

  75. Slide 75: Other Assets

    Other Assets 75

  76. Slide 76: Highways Other Assets Summary

    76 Summary HIGHWAYS | OTHER ASSETS €284M (1) TOTAL INVESTED EQUITY IN OTHER ASSETS Location Ferrovial Share Shareholders Dividends and capital returns (M€) Invested equity (M€) Committed equity (M€) Concession term Opening date Remaining life Type of asset Kms (highway length) Autema Spain 76.28% Ac

  77. Slide 77: Airports

    Airports

  78. Slide 78: Ferrovial is one of the world's leading private airport investors

    78 • Concentrate on North America and other regions where Ferrovial operates • Invest in relationships via bilateral transactions and select open-bid opportunities • Identify growth opportunities that leverage Ferrovial’s strengths • Employ a risk-adjusted strategy for returns • Emphasize terminal-r

  79. Slide 79: Contents

    79 Contents 1 New Terminal One - JFK 2 Dalaman Airport

  80. Slide 80: New Terminal One - JFK

    80 1 New Terminal One - JFK

  81. Slide 81: Overview (I) New Terminal One

    81 Location New York (USA) Ferrovial Share – Equity Accounted 49% Other Shareholders 2% Carlyle 30% JLC 19% ULLICO Concession Term Until 2060 Leasehold area (Existing T1/Projected NTO) 37.5 acres / 133.72 acres (1) Terminal area (Existing T1/Projected NTO) 700k sqft / 2.6m sqft (2) Concession area,

  82. Slide 82: Overview (II)

    82AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK Overview (II) (1) 22 Widebody gates and 1 Narrowbody gate (2) This figure includes: CAPEX $5.7B, Financing cost $1.5B and Rent, Opex and fees $1.8B . Phase A expected to open in 2026 Concession Term 2060 Total Uses2 (Phase A) $9.0B Gates 231 (14 WB Phase A;

  83. Slide 83: Overview (III) Our Roles

    83 Overview (III) AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK 49% Lead Investor Operational Support Management Service Agreement (MSA) Airports Construction Construction Oversight Project Management Office (PMO) Our Roles 83

  84. Slide 84: Overview (IV) Key Dates and Gates

    84 Expected Key Dates of the NTO Project Planned Number of Wide Body Gates (vs. Previous situation) Area currently occupied by Terminals 1 and former Terminals 2 and 3 (1) Phase B1 and Phase B2 need to go through design, construction, and Port Authority (PANYNJ) and other governmental approvals and

  85. Slide 85: NTO is the only terminal expected to grow significantly

    85 NTO is the only terminal expected to grow significantly in the coming years1,2 (1) Source: Own elaboration from PA EA February 2021, public information and Google Earth; hardstands not included (2) Terminal 7: Expected to be demolished to make way for the second phase of construction of new Termi

  86. Slide 86: Construction. Phase A

    86 Construction. Phase A AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK Single guaranteed maximum price locked in for the Phase A design and construction scope Terminal 1 will remain in operation during construction of Phase A After Phase A opening, T1 closes and will be demolished Tishman: highly experie

  87. Slide 87: Phase A. 2025 Milestones Achieved

    8787AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK Phase A. 2025 Milestones Achieved (1) As of December 2025 Lounge construction underway Commercial units' procurement well advanced Commercial units handed over to operator for fit- out works Data centers energized 82% Construction Progress 1

  88. Slide 88: Investment grade rating and Phase B1 notice to proceed

    88 The Lessee is required to use commercially reasonable efforts to obtain an IG rating, not earlier than nine months and not later than six months prior to the anticipated scheduled Phase A DBO, considering also a reduced Phase B1 which would postpone two gates to Phase B2 (pursuant to the Two-Gate

  89. Slide 89: Airline agreements

    89 Airline agreements AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK Committed airlines LOI signed Non-US long-haul airlines As of Ferrovial’s Fact Book release (May 2026), Ferrovial has agreements with 30 airlines, which consist of 21 executed agreements and 9 Letters of Intent (LOIs). (*) The infographi

  90. Slide 90: Cost per enplanement

    90 Cost per enplanement AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK Benchmark of other competing terminals COST PER ENPLANEMENT BENCHMARK (PUBLIC DATA) 1 (1) Data from third party source: Steer Report (2025). Note: Ferrovial does not confirm or endorse such report and takes no responsibility for it. Th

  91. Slide 91: Revenue

    91 Revenue AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK Aero Revenues Non-aero Revenues (15%) (85%) Common Use Facility Charges (75%) Other aero (10%) Concessions (12%) Advertising (2%) Other (1%)Aero Revenue Breakdown BASED ON THE AMOUNT OF SPACE RENTED OUT BY AIRLINES ON AN EXCLUSIVE BASIS Non-aero Re

  92. Slide 92: OPEX

    92 OPEX AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK Operations baggage, PRM2 & general ramp operations (such us snow removal) Security building security, checkpoint security and PANYNJ police charges IT includes systems (ex. flight information display), telephone usage, web services, etc Other includes

  93. Slide 93: OPEX / Revenue sharing mechanisms

    93AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK OPEX / Revenue sharing mechanisms » NTO aeronautical revenues are not shared with the PANYNJ except for 10% of gross terminal rental revenue for exclusive-use spaces, such as airline offices and lounges Aero Revenue: Exclusive Use Space Rent » There is 50%

  94. Slide 94: Other payments to the PANYNJ

    94 Other payments to the PANYNJ AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK Payments to the Port Authority (other than the revenue share) Rent type Annual amount $173.5k per acre in 2022 Annually at the greater of 4% or 50% CPI $28.3m2Ground Rent Escalation Yearly payments* $3.2m Fixed amount $3.2mFirs

  95. Slide 95: Phase A Financial Structure

    95 (1) As of December 31, 2025; (2) Source: Steer Report (2025); (3) Includes $0.2B of interest from Construction Cash Fund; (4) During Construction; (5) All-in cost, including swap breakage proceeds 0 500 1000 1500 2022 2023 2024 2025 2026 Equity contributions%FER 100% Phase A Financial Structure A

  96. Slide 96: Debt Service Ratios – Coverage, Investment Grade

    96 Debt Service Ratios – Coverage, Investment Grade AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK (1) Total Obligations Coverage Ratio The Lessee must set rates under the Airline Use Agreement to achieve a Projected TOCR1 of 1.25:1.00 for each TOCR Calculation Period starting January 1 of each Fiscal Yea

  97. Slide 97: Cash flow waterfall

    97 Cash flow AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK NTO post-completion cashflow waterfall Aero and non-aero revenue Ramp-up account release Income from cash balances and eligible investments Cash inflows Cash outflows OPEX: PANYNJ Revenue Share (deferrable) OPEX: O&M expenses, including MSA (defe

  98. Slide 98: Ferrovial financial obligations related to NTO

    98 Ferrovial financial obligations related to NTO AIRPORTS | NEW TERMINAL ONE (NTO) AT JFK Earn-out Ferrovial agreed with the Carlyle Group on the payment of earn-out consideration should Carlyle divest its outstanding indirect 2% interest in NTO. This earn-out payment would be triggered either if C

  99. Slide 99: Public Information

    99 Information » EMMA, United States official source for municipal securities data and documents. It is provided by the Municipal Securities Rulemaking Board » More information is available at the NTO Series 2025 Bonds o Municipal Securities Rulemaking Board::Emma EMMA – Electronic Municipal Market

  100. Slide 100: Dalaman Airport

    100 2 Dalaman Airport

  101. Slide 101: Dalaman Airport Asset Overview

    101 It is a stable asset for the Airports’ portfolio due to its limited exposure to Turkish GDP and FX One of the most attractive tourist regions in Turkey Location Dalaman (Türkiye) Ferrovial Share – Globally consolidated 60% Other Shareholders 40% YDA Group Concession Term Until 2042 Number of Ter

  102. Slide 102: Demand Profile

    102 1.6 0.8 1.4 1.5 1.8 1.9 2.0 3.3 0.8 0.9 3 3.5 3.7 3.6 2019 2020 2021 2022 2023 2024 2025 Domestic International During 2025: • 5.6M passengers passed through the airport, consolidating 2024 figures • International traffic represented close to 65% of the total traffic in 2025 Traffic profile (m p

  103. Slide 103: Revenue and Financial Profile

    103AIRPORTS | DALAMAN AIRPORT Revenue and Financial Profile (€ M) 2024 2025 Revenue 82 85 Adjusted EBITDA 64 66 Adjusted EBIT 42 43 Aero Revenue Non-Aero Revenue CORRESPOND TO THE CONCESSIONS AND/OR RENTS RECEIVED FROM THE DUTY-FREE, RETAIL, SERVICES, ADVERTISING, AND FOOD AND BEVERAGE UNITS REVENUE

  104. Slide 104: Public Information

    104 Public Information Information » DHMI, General Directorate of State Airports Authority responsible for the management of Turkish airports and the regulation and control of Turkish airspace DHMI WEB PAGE: https://www.dhmi.gov.tr/Sayfalar/EN/DefaultEN.aspx Reported Information » Integrated Annual

  105. Slide 105: Construction

    CONSTRUCTION

  106. Slide 106: Construction overview and 2025 figures

    106 Key to the development of greenfield projects. Focus on markets with a commitment to infrastructure development CONSTRUCTION f. constructionbudimex webber CONSTRUCTION Capabilities built on footprint, balanced size & risk management Average long-term target : 3.5% Adjusted EBIT margin1 €7.7bn Re

  107. Slide 107: Construction | Budimex

    107CONSTRUCTION I BUDIMEX » Ferrovial took an initial stake in Budimex in 20001 » Shareholders: 50.1% Ferrovial, 30.4% Free-float, 8.4% Nationale Nederlanden OFE, 8.0% Allianz OFE and 3.1% PZU OFE » The largest company construction industry in Poland » Provides services in the infrastructure sector,

  108. Slide 108: Ferrovial Construction | Webber

    108 Ferrovial Construction CONSTRUCTION I F. CONSTRUCTION I WEBBER » Born in 1999 from the merger of the construction businesses of Ferrovial and Agroman (renamed Ferrovial Construction in 2020) » International leader in the Construction Industry » Experts in highly complex projects and added value

  109. Slide 109: Construction order book breakdown

    109 69% 11% 11% 9% Civil work Building Industrial Others (1) Non-IFRS financial measure. For the definition and reconciliation of the most directly comparable IFRS measure, refer to Alternative Performance Measures of the Ferrovial 2025 Integrated Annual Report (2) In 2024, Ferrovial conducted a par

  110. Slide 110: Energy

    ENERGY

  111. Slide 111: Energy 2025 figures

    111 PHOTOVOLTAIC SOLAR ENERGY 812 MW under construction or in operation TRANSMISSION LINES 994 Km under construction or in operation ENERGY 2025 FIGURES Focus on renewable energy generation, storage, and transmission. Value creation through selective investments and fast rotation of assets €270M Rev

  112. Slide 112: Financial Profile

    112 3 FINANCIAL PROFILE Debt structure Cash Flow details Historical financial data

  113. Slide 113: Debt structure

    113 RECOURSE DEBT Financial structure: Investment grade at corporate level & non-recourse debt at infrastructure project level CORPORATE: STRONG BALANCE SHEET PROVIDES RESILIENCE AND OPTIONALITY GLOBAL CONSOLIDATION NON-RECOURSE DEBT EQUITY ACCOUNTED INFRASTRUCTURE PROJECT COMPANIES €5.1B Liquidity4

  114. Slide 114: Corporate debt profile and maturities

    114 ECP 1.8% Bonds 77.8% Sustainability Linked Bond 17.8% Loans 2.5% Fixed Rate 99.2% Variable Rate 0.8% NAME ISIN NUMBER CURRENCY OUTSTANDING AMOUNT (mn) INTEREST RATE ISSUANCE DATE MATURITY DATE 2025 Bond ES0205032024 EUR 500 1.375% 29-Mar-2017 31-Mar-2025 2026 Bond ES0205032032 EUR 780 1.382% 14-

  115. Slide 115: Credit rating agencies' metrics

    115 RATING OUTLOOK BBB STABLE RATING OUTLOOK BBB STABLE NET DEBT EX−INFRASTRUCTURE PROJECTS1 (Adjusted EBITDA ex−infrastructure projects2 + dividends from projects3) NET DEBT/ADJ. EBITDA Rating Agencies measure their debt ratios looking at the ex-infrastructure projects debt Rating Agencies’ Adj. EB

  116. Slide 116: Ex-infrastructure cash flows

    116 245 134 16 167 297 97 208 390 291 597 395 396 160 166 388 293 83 -3 1 85 290 277 296 494 340 469 388 704 895 880 134 237 191 183 29 3 10 6 8 30 -69 -46 -90 -65 -126 -124 -60 -152 -146 -207 995 999 572 945 928 738 656 946 1,048 1,385 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Construction

  117. Slide 117: Dividends from projects

    117 290 277 296 494 340 469 388 704 895 880 134 237 191 183 29 3 10 6 8 30 4 5 6 5 3 12 34 1 49 33 131 47 89 43 5 31 60 30 4 54 477 553 623 729 458 550 475 741 947 968 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Highways Airports Construction Services Energy 96 153 144 145 16 38 84 39 17 7 21

  118. Slide 118: Cash flows from investing activities

    118 -951 -323 -282 -235 -266 -1,101 -850 -226 -1,421 -1,840 340 253 230 484 501 1,621 429 43 2,582 1,158 -611 -70 -52 249 235 520 -421 -184 1,161 -682 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 INVESTMENTS DIVESTMENTS Highways & Airports Investments show equity contribution to the infrastruct

  119. Slide 119: Revenue by division and geography

    119 79.5% 14.3% 1.2% 3.5% 1.6% Construction Highways Airports Energy Other 36.2% 19.6%3.9% 23.1% 17.2% USA Spain Canada Poland Other 10,759 12,208 5,737 6,054 6,341 6,778 7,551 8,514 9,147 9,627 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Construction Services Highways Airports Energy Others 2

  120. Slide 120: Adjusted EBITDA by division and geography

    120 944 932 484 121 409 596 728 991 1,342 1,457 8.8% 7.6% 8.4% 2.0% 6.5% 8.8% 9.6% 11.6% 14.7% 15.1% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Construction Services Highways Airports Energy Others SERVICES CLASSIFIED AS DISCONTINUED ACTIVITY IN 2018 € M Adjusted EBITDA & Adj. EBITDA mg1 FINA

  121. Slide 121: Stock Information

    121 4STOCK INFORMATION Share Price Performance Dividends Declared

  122. Slide 122: Ferrovial shares at a glance

    122 SHAREHOLDER STRUCTURE2 ISIN: NL0015001FS8 Tickers: FER SM, FER NA, FER US Indexes: IBEX 35, Nasdaq-100 Issued Shares3: 733,755,372 Markets: Spain since May 6, 1999, Euronext Amsterdam since June 16, 2023, and Nasdaq since May 9, 2024. Ferrovial shares at a glance STOCK INFORMATION | SHARE PRICE

  123. Slide 123: Dividend per share and dividends declared

    123 544 520 520 520 377 463 578 520 575 626 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 0.719 0.719 0.721 0.719 0.512 0.502 0.692 0.715 0.798 0.872 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Since 2014, Ferrovial has distributed dividends on a scrip dividend scheme, providing flexibilit

  124. Slide 124: Sustainability & Corporate Governance

    124 5 SUSTAINABILITY & CORPORATE GOVERNANCE

  125. Slide 125: Sustainability Strategy

    125 Sustainability Strategy SUSTAINABILITY Improving efficiency and helping to lower operational costs Anticipating regulatory trends Contributing to attracting and retaining top talent Helping communities flourish by delivering essential infrastructure Engaging local communities in project developm

  126. Slide 126: Driving Positive Impact Through Environment, People and Governance

    126 SUSTAINABILITY Driving Positive Impact Through Environment, People and Governance

  127. Slide 127: Environment, society and responsible business

    127 Ferrovial strives to minimize its environmental footprint by using resources efficiently, lowering carbon emissions, reducing water use, and limiting waste through operational excellence. We evaluate severe climate risks to enhance the resilience of our assets in the long-term. Ferrovial sees ne

  128. Slide 128: Highly ranked in sustainability ratings

    128 FERROVIAL HIGHLY RANKED IN SUSTAINABLITY RATINGS Sustainability ratings in 2025 Scored: 83/100 (+2 compared to 2024) Included for the 22nd consecutive year Member of the Euronext ESG Rating: A (Scale AAA to CCC)º 16th year in a row in the A List of CDP Climate Change 3rd time in the CDP Water ac

  129. Slide 129: Sustainability targets

    129 Sustainability targets SUSTAINABILITY PERFORMANCE INDICATORS 2025 RESULTS 2024 RESULTS TARGET HORIZON 1. GHG emissions: Scope 1&2 absolute emissions (tCO2)1 -45.6% -35.7% -42% (vs. 2020) 2030 2. GHG emissions: Scope 3 absolute emissions (tCO2)2 -17.5% -19.8% -25% (vs. 2020) 2030 3. Renewable ele

  130. Slide 130: Climate strategy goals

    130 CLIMATE STRATEGY GOALS 100% renewable electricity consumption annually from 2025 onwards Deep Decarbonization Pathways (DDP) , which establishes the emission-reduction levers Emissions reduction targets according to the Science Based Targets initiative (SBTi) for both near-term (2030) and long-t

  131. Slide 131: SBTi-validated targets aligned with 1.5ºC

    131 SBTi-validated targets aligned with 1.5ºC SUSTAINABILITY | ENVIRONMENT (1) Scope 3 category including purchased and transport of goods and services; waste generated in operations and fuel and energy. Scope 1 & 2 in absolute terms -42% by 2030 (vs 2020) -45.6% (2025 TARGET: -21%) -25% by 2030 (vs

  132. Slide 132: Ferrovial's 2025 greenhouse gas emissions

    132 SCOPE 1 Direct emissions from Ferrovial’s owned & controlled resources SCOPE 2 Indirect emissions from the generation of purchased energy SCOPE 3 Indirect emissions that occur in the value chain, incl. upstream & downstream emissions 2,200,156 tCO2 e Scope 1 & 2 & 3 in absolute terms 12.86% 0.05

  133. Slide 133: Water footprint indices

    133 Ferrovial developed a methodology based on internationally recognized standards for the calculation of the water footprint, which enables water management to be carried out at geographical level. This methodology considers the source of water withdrawal, assigning different weights depending on

  134. Slide 134: Health and safety high potential events

    134 Any event with the potential to have caused a fatal or catastrophic accident but which ultimately did not and serves as an opportunity for learning. These events are reported and analyzed by the Management Committee and an executive incident review (EIR) of such events is carried out. As a resul

  135. Slide 135: Developing people to solve future challenges

    135 6,562 11,799 4,248 >50 years old 30-50 years old <30 years old 135 BY COUNTRY NUMBER OF EMPLOYEES Developing people to solve future challenges BY AGE SUSTAINABILITY | PEOPLE 19% 52% 29% 628 Chile 6,297 Spain 1,338 Others 6,988 Poland 4,948 USA 1,148 UK 1,262 Canada 24,799 25,501 22,609 2023 2024

  136. Slide 136: Board of Directors

    136 RAFAEL DEL PINO Chairman Executive Director IGNACIO MADRIDEJOS CEO Executive Director MARÍA DEL PINO Non- Executive Director ÓSCAR FANJUL Vice Chairman Independent Non- Executive Director JOSÉ FERNANDO SÁNCHEZ-JUNCO Independent Non- Executive Director PHILIP BOWMAN Independent Non- Executive Dir

  137. Slide 137: Experienced Board of Directors

    137 Experienced Board of Directors enriching Ferrovial’s strategic decision-making CORPORATE GOVERNANCE | BOARD OF DIRECTORS PROFESSIONAL BACKGROUND INTERNATIONAL EXPERIENCE FUNCTIONAL AREAS INDUSTRY EXPERIENCE

  138. Slide 138: Executive Committee

    138 Executive Committee Pursuant to the Board Rules, the Executive Committee may resolve all matters that the Board can resolve, subject to applicable law and the Articles of Association or as explicitly provided otherwise in the Board Rules. All members must be Directors. In 2025, the Executive Com

  139. Slide 139: Annual variable remuneration

    139 ANNUAL VARIABLE REMUNERATION CHAIRMAN QUALITATIVE TARGETS & SUSTAINABILITY (20%) • Operations of Board & Executive Committee (20%) • Strategic Plan (20%) • ESG measures (60%) • Strategic Plan (39%) • ESG measures (61%) QUANTITATIVE TARGETS (80%) CEO 55% NET INCOME 45% CASH FLOW 2025 FIXED REMUNE

  140. Slide 140: Non-financial targets and achievement

    140 30% QUALITATIVE TARGETS & SUSTAINABILITY NON-FINANCIAL TARGETS METRICS Weight 2025 Degree of achievement QUALITATIVE Operation of the Board & Executive Committee 20% 50% Strategic Planning 20% 75% SUSTAINABILITY FACTORS Corporate Governance 20% 75% Succession plan 20% 100% Institutional Represen

  141. Slide 141: Disclaimer

    141 This Investor Presentation has been produced by Ferrovial N.V. (the “Company”, “we” or “us” and, together with its subsidiaries, the “Group”) for the sole purpose expressed herein. By accessing this Investor Presentation, you acknowledge that you have read and understood the following statements

  142. Slide 142: Investor Relations

    142 Investor Relations ir@ferrovial.com www.ferrovial.com ferrovial

Ferrovial — Investor Presentation (July 2026) on 6ix