Alpha Hpa Limited · ASX:A4N

Alpha Hpa — Augur Resources — Investor Presentation (October 2014)

31 slides from Alpha Hpa's investor presentation, Oct 20, 2014

  1. Slide 1: Emerging Gold, Copper and Nickel Producer

    AUGUR RESOURCES LTD ABN 79 106 879 690 Emerging Gold, Copper and Nickel Producer

  2. Slide 2: Disclaimer

    Disclaimer This presentation contains certain forecasts and forward- Cautionary Note to U.S. Investors looking information, including regarding possible or assumed This presentation may use the term "measured", "indicated" future performance, costs, production levels or rates, prices, and "inferred"

  3. Slide 3: Investment highlights

    Investment highlights ASX listed Indonesian focused explorer with highly prospective Indonesian gold-copper portfolio covering 25,837 hectares over 5 IUPs and an Australian nickel laterite project 1.54 Moz gold equivalent JORC mineral resource estimated for Randu Kuning deposit: 1.01M ounces of gold

  4. Slide 4: Indonesian project locations

    Indonesian project locations www.augur.com.au 4

  5. Slide 5: Wonogiri project

    Wonogiri project Randu Kuning Deposit Highlights Excellent Metallurgical Recoveries • Shallow gold rich porphyry deposit with a JORC • Metallurgical recoveries of up to 89.0% for gold compliant resource estimate of 1.54 million ounce and 94.3% for copper from the gold equivalent1 covering the Randu

  6. Slide 6: Wonogiri project location

    Wonogiri project location www.augur.com.au 6

  7. Slide 7: Wonogiri drilling summary

    Wonogiri drilling summary • Drilling Locations: Randu Kuning, Jangglengan, Gawe, Bukit Piti, Geblak • Drilling focused on coincidental magnetic and anomalous Au/Cu from trenching Drill Data Total Number of Drill Holes 52 Depth Range 150 – 550m Total Metres Drilled 15,371 Azimuth 90 – 270 Dip Inclina

  8. Slide 8: Randu Kuning cross section

    Randu Kuning cross section WDD 2, 4, 6, 8, 16 & 18 • Confirmed porphyry-type deposit with gold+copper sulphide mineralisation extending from surface. Host rocks are microdiorite and intrusion breccia. • Both lower-grade (<1.0 g/t gold) disseminated and higher grade (>1.0 g/t gold) structurally-contr

  9. Slide 9: Significant intercepts

    Significant intercepts Hole From Interval (m) Gold g/t Copper % DHH1 66.0 100 0.96 0.23 WDD001 8.2 73.3 1.14 0.26 WDD004 5.5 56.5 0.88 0.35 WDD005 0.0 129.5 0.82 0.22 WDD006 0.0 140.5 0.78 0.18 WDD008 40.0 222.0 0.95 0.20 WDD009 100.5 107.0 0.73 0.19 WDD010 44.5 135.5 1.28 0.20 WDD015 68.0 182.0 0.7

  10. Slide 10: Metallurgy

    Metallurgy • First pass floatation tests under taken by AMMTEC in Perth on 3 separate sulphide samples (3 different holes) returning excellent recoveries. • Gold recovery averaged 82.7% (range 78.6% to 88.7%) while copper recovery averaged 94.1% (range 92.1% to 96.1%). • Possibility to increase gold

  11. Slide 11: Resource model

    Resource model Randu Kuning Deposit • 90.9 Mt @ 0.53 g/t Au Eq1 1 (See JORC summary on slide 30) • Measured and Indicated 33.7 Mt @ 0.81 g/t Au Eq. Higher Grade Gold Zone >1.0 g/t (Red) • High grade deposit close to surface. • Open pit mining. • Deep high grade zone open laterally and to depth. Rand

  12. Slide 12: Regional exploration targets

    Regional exploration targets Discovery potential for high grade mineralisation within epithermal vein targets, adjacent to Randu Kuning. 3,000 metre drill program commenced May 2014. www.augur.com.au 12

  13. Slide 13: Jangglengan prospect

    Jangglengan prospect • Located about 1.0 kilometre south of Randu Kuning. • Recently drilled scout hole WDD056 returned 3 shallow high grade zones: • 7.0 metres at 0.82 g/t gold and 3.5 g/t silver from 56.0 metres including 2.0 metres of 2.08 g/t gold and 10.2 g/t silver from 56.0 metres; • 3.0 metr

  14. Slide 14: Kepil prospect

    Kepil prospect • Located about 500 metres south west of Randu Kuning. • Recently drilled scout hole WDD058 intersected significant copper mineralisation including 36.0 metres at 0.28% copper from 25.0 metres. • WDD059 intersected a shallow 6.0 metre wide zone of 0.83 g/t gold from 36.0 metres, sever

  15. Slide 15: Positive scoping study results

    Positive scoping study results • Life of project positive net cash flow of US$143M undiscounted, or US$102M when a 5% discount factor is applied (excluding contingency). • Open cut mine delivering approximately 9 years of production at 1.74 to 2.0 Mtpa at 0.61 g/t Au and 0.16% Cu. Low strip ratio of

  16. Slide 16: Scoping study cautionary statements

    Scoping study cautionary statements The Company cautions that production and cash flow estimates presented in the scoping study are indicative only. The following should be considered: • Although the Randu Kuning Measured and Indicated resource categories exceed the scoping study production target,

  17. Slide 17: Pit shells

    Pit shells Optimised pit cross section showing net metal values and pit outline. www.augur.com.au 17

  18. Slide 18: Infrastructure

    Infrastructure Infrastructure in close proximity • Excellent infrastructure at site. • Sealed road to edge of deposit. • Man made water source directly east of the licence area and other water sources within licence area. • Grid power in local area, but capacity yet to be determined. • Potential wor

  19. Slide 19: CSR

    CSR Augur’s CSR is aimed at Sustainable Development and Strengthening of: Health and health related issues Education development Local business and community development The environment Health • Medical check ups for illegal miners. • Assistance to combat infant malnutrition. • Collaboration with Po

  20. Slide 20: CSR

    CSR Business Development • Women entrepreneurship program, teaching local women to capture business opportunities in agriculture, fishery and animal husbandry. • Office equipment for two villages. Community Participation and Development • Provided sponsorship for Traditional Fun Biking campaign. • P

  21. Slide 21: Wonogiri development schedule

    Wonogiri development schedule Year 2014 2015 2016 Month Mar Jun Sep Dec Mar Jun Sep Dec Mar Scoping Study Metallurgy (gravity & oxide) Geotech Drilling Environmental Studies Pre-Feasibility Study Permitting (IUP Operation) Infill Drilling Bankable Feasibility Construction www.augur.com.au 21

  22. Slide 22: Gorontalo projects

    Gorontalo projects Toluludu: 5,029ha • Copper Gold Porphyry, Epithermal Gold and Silver, Skarn Gold and Copper targets. Toluludu Biyonga • Large 1400m x 860m , highly altered potassic zone yet to be drill tested. • Main prospect, Molalahu, located in Limited Production forest. • Multi anomalous rock

  23. Slide 23: Collerina project location

    Collerina project location www.augur.com.au 23

  24. Slide 24: Collerina project

    Collerina project Homeville Deposit • 16.3 million tonnes at 0.93% nickel and 0.05% cobalt (cut off 0.7% nickel). • Total resource estimated to contain 151,000 tonnes of nickel and 8,100 tonnes of cobalt (see JORC summary on slide 31). • Mineralisation is at surface in some areas and has an average

  25. Slide 25: Collerina Project

    Collerina Project Homeville Deposit Long Section Long section of the Homeville nickel-cobalt deposit showing location of mineralisation to surface and drill holes. www.augur.com.au 25

  26. Slide 26: A value proposition

    A value proposition Advanced Projects. Wonogiri gold project with positive scoping study demonstrating potential for profitable open pit mine. Randu Kuning porphyry remains open at depth and in all lateral directions. Significant epithermal potential with 2 recently identified near surface targets.

  27. Slide 27: Corporate (as at October 2014)

    Corporate (as at 9 October 2014) Directors Capital Chairman Norman Seckold Managing Director Justin Werner 315.8 million shares on issue Director Peter Nightingale 1 million employee options Non-Exec Director Grant Kensington Market cap: AUD$7.3 million Share Price – 52 Weeks Major Shareholders PT A

  28. Slide 28: Thankyou

    Thankyou Augur Resources Ltd Level 2, 66 Hunter St, Sydney, NSW 2000, AUSTRALIA Phone: +61 2 9300 3310 ASX code: AUK www.augur.com.au 28

  29. Slide 29: Statement of compliance

    Statement of compliance The information in this report that relates to Mineral Exploration is based on information compiled by Augur staff and contractors and approved by Mr Michael Corey, PGeo., who is a Member of the Association of Professional Geoscientists of Ontario (APGO) in Canada. Michael Co

  30. Slide 30: JORC Summary – Randu Kuning

    JORC Summary – Randu Kuning JORC Tonnes Au Eq Au Cu % Oz AuEq Oz Au Cut off Category (M) g/t g/t Au Eq Measured 8.3 1.45 1.07 0.21 389,000 287,000 1.0 20.4 1.03 0.72 0.17 673,000 473,000 0.5 28.3 0.84 0.56 0.15 765,000 513,000 0.2 Indicated 0.6 1.33 1.02 0.17 27,000 21,000 1.0 3.5 0.81 0.59 0.12 92,

  31. Slide 31: JORC Summary – Homeville

    JORC Summary – Homeville JORC Cutoff Tonnes Ni % Co % Fe % Mg % Category Grade Ni% Millions Indicated 0.5 6.4 0.87 0.06 21 9.6 0.7 4.4 0.99 0.06 20 8.8 1.0 1.8 1.21 0.05 19 7.9 Inferred 0.5 20.7 0.78 0.05 18 9.9 0.7 11.9 0.91 0.05 18 9.4 1.0 3.1 1.16 0.05 17 8.8 TOTAL 0.5 27.2 0.80 0.05 19 9.8 0.7 1

Augur Resources — Investor Presentation (October 2014) on 6ix