Critica Limited · ASX:CRI
Critica — Venture Minerals — Technology & Low Emission Minerals Presentation (November 2018)
31 slides from Critica's conference presentation, Nov 13, 2018
Slide 1: Venture Minerals Limited
Venture Minerals Limited Technology & Low Emission Minerals Presentation 13 – 14 November 2018
Slide 2: Disclaimer and Competent Persons Statement
Disclaimer and Competent Persons Statement FORWARD LOOKING STATEMENT ▪ This presentation may contain certain forward looking statements and projections regarding: - estimated, resources and reserves; - planned production and operating costs profiles; - planned capital requirements; and - planned str
Slide 3: Highlights
Highlights • Underground Scoping Study underway on the High-Grade Tin- Tungsten Resource at the Mount Lindsay Project, Tasmania; • VMS (Volcanogenic Massive Sulfide) system confirmed by maiden drill program testing for Copper-Lead-Zinc at the Thor Prospect, Western Australia; • Acquired strategic la
Slide 4: Corporate Snapshot
Corporate Snapshot Summary Major Shareholders ASX Code: VMS Republic Investment Management 15.7% Shares on issue: 520.6m Elphinstone Holdings Pty Ltd 7.9% Options: 13.7m Molton Holdings Limited 5.1% Market Capitalisation: A$12.0m Directors & Management 5.0% Enterprise Value: A$10.2m Ingalls & Snyder
Slide 5: Directors and Key Management
Directors and Key Management A dedicated management team with a wealth of experience and credited with a number of discoveries both in Australia and internationally Mel Ashton Hamish Halliday Andrew Radonjic Dr Stuart Owen Non-Executive Chairman Non-Executive Director Managing Director Exploration M
Slide 6: Project Locations
Project Locations Golden Grove Caesar Project North Project Ni- Cu Cu-Zn-Au North West Tasmanian Projects Mt Lindsay Tin-Tungsten, Riley & Livingstone DSO Hematite South West Project Thor Cu-Pb-Zn Prospect & Odin Li & Ni-Cu Prospects Pingaring Project Ni - Co Venture Minerals | Technology & Low Emis
Slide 7: Is Tin the forgotten EV Metal?
Is Tin the forgotten EV Metal? Venture Minerals | Technology & Low Emission Minerals Presentation | 13-14 November 2018 7
Slide 8: Market drivers of future tin demand
Market drivers of future tin demand Computing and robotics Energy Generation & Tin focus: Solder used in mobile Infrastructure phones, computers, tablets Tin focus: Solar cells, thermoelectric materials and electronic technologies Industry developments: Industry developments: • Measurable impacts of
Slide 9: Current primary uses of Tin
Current primary uses of Tin Nearly 50% of While solder The two most Tin use in lead- tin consumed is drives the significant uses acid batteries in lead-free current market, of tin for EV doubled between solder by the significant impact is in 2010 to 2016 consumer growth is in electronics and and is
Slide 10: Tin Market Outlook
Tin Market Outlook • Tin today at over US$19,000/t or A$26,600/t but has missed the dramatic rises of its EV metal peers in lithium, cobalt & graphite; • Visible Tin Stocks near lows. Source: International Tin Association Venture Minerals | Technology & Low Emission Minerals Presentation | 13-14 Nov
Slide 11: World Tin Production
World Tin Production • Supply issues with most of the world’s largest tin producers actually producing less; • Most world tin production still coming from higher risk jurisdictions. Venture Minerals | Technology & Low Emission Minerals Presentation | 13-14 November 2018 11
Slide 12: Location of Mount Lindsay Tin-Tungsten Deposit
Location of Mount Lindsay Tin-Tungsten Deposit Venture Minerals | Technology & Low Emission Minerals Presentation | 13-14 November 2018 12
Slide 13: EV Metal Demand, time to re-assess Mount Lindsay
EV Metal Demand, time to re-assess Mount Lindsay • EV demand drives re-assessment of the high grade tin and tungsten resource base at Mount Lindsay. • Uniquely positioned with Mount Lindsay being one of the largest undeveloped tin projects in the world, containing in excess of 80,000 tonnes of tin m
Slide 14: Resource Statement – Mount Lindsay Tin-Tungsten Project
Resource Statement – Mount Lindsay Tin-Tungsten Project (as previously announced 17 October 2012) Reporting to two significant figures. Figures have been rounded and hence may not add up exactly to the given totals. Full details of the Note: estimate are in the ASX release for the Quarterly Report o
Slide 15: Mount Lindsay Tin-Tungsten Project Highlights
Mount Lindsay Tin-Tungsten Project Highlights • Approximately 83,000m of diamond core drilling used to define JORC compliant resources with +60% in the Measured & Indicated categories; • Feasibility Study completed with comprehensive metallurgical test-work, with further post feasibility test-work d
Slide 16: High Grade Tin-Tungsten Targets
High Grade Tin-Tungsten Targets Venture Minerals | Technology & Low Emission Minerals Presentation | 13-14 November 2018 *Source: MLX Corporate Presentation 2 March 2018 16
Slide 17: Mount Lindsay Going Forward
Mount Lindsay Going Forward • Underground Scoping Study is underway looking at mining the Higher Grade portions of the Main and No.2 Skarns being respectively the MacDonald and Radford Shoots; • Underground access to be located further down the side of Mount Lindsay. All waste material to be replace
Slide 18: Project Locations
Project Locations Golden Grove Caesar Project North Project Ni- Cu Cu-Zn-Au North West Tasmanian Projects Mt Lindsay Tin-Tungsten, Riley & Livingstone DSO Hematite South West Project Thor Cu-Pb-Zn Prospect & Odin Li & Ni-Cu Prospects Pingaring Project Ni – Co Venture Minerals | Technology & Low Emis
Slide 19: South West Project – Location Map
South West Project – Location Map • Venture holds a 281 km² land holding within the Greenbushes Mineral District host to the world’s largest hard rock lithium mine (produces ~40% of the worlds-lithium); • Several VMS (Volcanogenic Massive Sulfide) targets identified including the Thor Prospect; • Su
Slide 20: Thor Prospect – Geochemical Target & Historic Drill Core
Thor Prospect – Geochemical Target & Historic Drill Core • Large geochemical VMS New Thor style target identified prospect hosting from surface sampling; large VMS Style Historic drill core Target containing VMS • Massive sulfides identified Style Massive in historic drill core near sulfides Thor Ta
Slide 21: Thor Prospect – Thor & Kingsley Bi laterite soil contours
Thor Prospect – Thor & Kingsley Bi laterite soil contours on VTEM flown in 2005 New Thor prospect hosting large VMS Historic Kingsley Style Target prospect hosting VMS Style Massive sulfides Venture Minerals | Technology & Low Emission Minerals Presentation | 13-14 November 2018 21
Slide 22: Massive Sulfide in Core from Maiden Drilling at the Thor Prospect
Massive Sulfide in Core from Maiden Drilling at the Thor Prospect Venture Minerals | Technology & Low Emission Minerals Presentation | 13-14 November 2018 22
Slide 23: Thor VMS Target with drilling on aeromagnetic image
Thor VMS Target with drilling on aeromagnetic image Venture Minerals | Technology & Low Emission Minerals Presentation | 13-14 November 2018 23
Slide 24: New Major EM Survey completed at Thor in September 2018
New Major EM Survey completed at Thor in September 2018 Venture Minerals | Technology & Low Emission Minerals Presentation | 13-14 November 2018 24
Slide 25: Final EM survey results confirm Priority Targets
Final EM survey results confirm Priority Targets for immediate drill testing Thor Priority VMS Drill Targets Historic Kingsley VMS Prospect Venture Minerals | Technology & Low Emission Minerals Presentation | 13-14 November 2018 25
Slide 26: Project Locations
Project Locations Golden Grove Caesar Project North Project Ni- Cu Cu-Zn-Au North West Tasmanian Projects Mt Lindsay Tin-Tungsten, Riley & Livingstone DSO Hematite South West Project Thor Cu-Pb-Zn Prospect & Odin Li & Ni-Cu Prospects Pingaring Project Ni - Co Venture Minerals | Technology & Low Emis
Slide 27: New Acquisition - Golden Grove North
New Acquisition - Golden Grove North ▪ 374 km2 located less than 10 kilometres from the Golden Grove Camp (Mine); ▪ 25 strike kilometres of a largely untested, prospective sequence for 25km of Prospective VMS style mineralisation; VMS Style Sequence Endowment (Resources and Production) ▪ Historic sh
Slide 28: Project Locations
Project Locations Golden Grove Caesar Project North Project Ni- Cu Cu-Zn-Au North West Tasmanian Projects Mt Lindsay Tin-Tungsten, Riley & Livingstone DSO Hematite South West Project Thor Cu-Pb-Zn Prospect & Odin Li & Ni-Cu Prospects Pingaring Project Ni - Co Venture Minerals | Technology & Low Emis
Slide 29: Pingaring Project – Geological Setting
Pingaring Project – Geological Setting • 4 km along strike and immediately to the south-east of the Quicksilver Nickel-Cobalt Discovery; • 465 km² of tenement applications within an emerging new Nickel- Cobalt province in Western Australia; • Geophysical data and surface geochemistry used to interpr
Slide 30: Conclusions
Conclusions ▪ Venture is leveraged to multiple commodities over numerous projects; ▪ Mount Lindsay Tin-Tungsten Project provides exposure to EV metals and near term production; ▪ Maiden drill program at Thor Prospect intersected massive sulfides confirming the Copper-Lead-Zinc target is a 20km long
Slide 31: Thank You Any Questions?
Thank You Any Questions? Come see me at Booth #29. www.ventureminerals.com.au Venture Minerals | Technology & Low Emission Minerals Presentation | 13-14 November 2018
Venture Minerals — Technology & Low Emission Minerals Presentation (November 2018) on 6ix