Arcelormittal South Africa Limited · JSE:ACL
Arcelormittal South Africa — ESG Presentation (December 2014)
8 slides from Arcelormittal South Africa's sustainability presentation, December 2014
Slide 1: Environmental Management Vanderbijlpark Works
ENVIRONMENTAL MANAGEMENT Vanderbijlpark Works Rehabilitation of historical source areas and future mitigation projects December 2014 1 1
Slide 2: Site map of waste disposal areas, dams and maturation ponds
a ‘too _JGREENBELT FQwaste disposal site area [pam 14 /)Dams 10 >] Maturation ponds Sebokeng 21:45 000 4 \\fanderbijlpark 3 \\\ Mliegveia
Slide 3: Air Quality: Emission reductions from point sources
Air Quality Emission reductions from point sources 3
Slide 4: Emission reductions
Air Quality Emission reductions Projects implemented regarding emission reduction of 82% • 2005 to 2006: The reduction from 2005 was as a result of the stoppage of dosing with Spent Pickling Liquor (SPL) at the Sinter Plant in 2006. • 2006 to 2007: Increase in total emissions due to introduction of
Slide 5: Focus areas: Fugitive Emissions
Air Quality Focus areas Fugitive Emissions • Raw material handling – Tippler stations – investigate enclosure of areas and improve extraction system – Sinter mixing bed – investigating to spray cover layer onto bed – Conveyer systems – minimise upset condition to prevent spillages – Waste handling –
Slide 6: General focus points continue
General focus points continue Waste Management • Reduction of disposal cost to Holfontein – 2012 – 12465 tons – 2013 – 6632 tons (R 7 582 900 saving) – 2014 – 5451 tons (R 1 653 400 saving) • Other waste minimisation projects – BOF/DR waste streams to be converted into concrete for road application
Slide 7: Environmental impact areas – associated timeframes with Risk Assessment Report 2003
4. Environmental impact areas – associated timeframes with Risk Assessment Report 2003 Management area Time Current status quo Target date (depending on schedule funds approval) Perimeter & surrounding areas 2005 Some cleanups Ongoing √ Existing disposal site 2018 80% completed Final phase 2017 and
Slide 8: Environmental impact areas – associated timeframes with Risk Assessment Report 2003 cont.
4. Environmental impact areas – associated timeframes with Risk Assessment Report 2003 cont. Management area Time Current status quo Target date (depending on schedule funds approval) Sludge dams 2018 CETP dam 2 – completed 2013 CETP dam 1 – 20% completed Scheduled for 2015 √ S/W slag area 2016 Busy
ArcelorMittal South Africa — ESG Presentation (December 2014) on 6ix