  1. Slide 1: Mines update

    Mines update CMD 21 November 2013 Jan Moström President Boliden Mines

  2. Slide 2: Mines – Financial development

    Mines – Financial development  EBIT 372 (858) MSEK MSEK R4Q, ‒ 376 MSEK in Q2 2013 Quarterly EBIT MSEK 1 600 4 800  EBIT decline in past quarters Rolling Q EBIT 4 400 driven by: 4 000 ‒ Metal price decline 1 200 3 600 ‒ Strong Swedish krona 3 200 ‒ Lower grades 2 800  Costs 800 2 400 ‒ Much lower

  3. Slide 3: Boliden Mines 2013

    Boliden Mines 2013  Operational excellence ‒ EHS ‒ NBW  Exploration ‒ Near mine  Aitik ‒ Aitik 36 Mton and further expansions  Boliden area ‒ Consolidation of expansions  Garpenberg ‒ Finalizing expansion project  Tara ‒ Challenging cash cost position ‒ Cost reduction program Boliden CMD 2013

  4. Slide 4: Boliden Mines, looking forward

    Boliden Mines, looking forward  Operational excellence ‒ EHS ‒ NBW  Exploration ‒ Increased brownfield focus  Technology ‒ Develop processes for challenging mineralizations ‒ Mine automation  Environment ‒ Develop techniques to minimize environmental impact Boliden CMD 2013 4 2013-11-21

  5. Slide 5: Aitik – as is

    Aitik – as is Boliden CMD 2013 5 2013-11-21

  6. Slide 6: Aitik 36

    Aitik 36  Time ‒ On plan ‒ 36 Mton latest 2014  Capacity ‒ Tested above 36 Mton  Cost ‒ Higher than planned ‒ Competitive position maintained Boliden CMD 2013 6 2013-11-21

  7. Slide 7: Production 2011 – 2013

    Production 2011 – 2013 (through September) 40 000 35 000 30 000 25 000 KTONNES 20 000 15 000 10 000 5 000 0 2011 2012 2013 Mill d volume Milled l R12 T Target t Boliden CMD 2013 7 2013-11-21

  8. Slide 8: Aitik – decreased sensitivity for winter conditions

    Aitik – decreased sensitivity for winter conditions  Crushers: ‒ Re-design – re-building  Conveyors: ‒ Re-design – re-building ‒ Improved p q qualities, belts  Intermediate storage ‒ Re-design – re-building ‒ Chutes ‒ Boilers – heaters  Ore storage ‒ Re-design – re-building ‒ Chutes ‒ Boilers –

  9. Slide 9: Aitik – operating cost/milled ton

    Aitik – operating cost/milled ton 12 000 100 90 10 000 80 70 8 000 60 6 000 50 40 4 000 30 20 2 000 10 0 0 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2010 2011 2012 2013 Mill d production Milled d ti C t per tonne Cost t excl.l Depr. D C t per tonne Cost t Boliden CMD 2013 9 2013-11-21

  10. Slide 10: Copper

    Copper Boliden CMD 2013 10 2013-11-21

  11. Slide 11: Copper

    Copper Normal C1 Normal C1+Underhållsinvesteringar cents/lb metall cents/lb metall 500 500 500 500 450 450 450 450 400 400 400 400 350 350 350 350 300 300 300 300 250 250 250 250 200 200 200 200 150 150 150 150 100 100 100 100 50 50 50 50 0 0 0 0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 201

  12. Slide 12: Aitik – Going forward

    Aitik – Going forward Boliden CMD 2013 12 2013-11-21

  13. Slide 13: Extended study, Tailings pond

    Extended study, Tailings pond Boliden CMD 2013 13 2013-11-21

  14. Slide 14: Aitik Going Forward

    Aitik Going Forward  Infrastructure ‒ In pit crushing, performance and cost ‒ TMF (Tailing Management Facilities) ‒ Reclamation, sequences and techniques ‒ Increased enenvironmental ironmental cost (Cape (Capex & opex) ope )  Production ‒ Mining sequences and design of mine ‒ Reclamation of presen

  15. Slide 15: Aitik 45 - characteristics

    Aitik 45 - characteristics  Increased volume to 45 mt/year ‒ Lower grades ‒ Increased ore reserves ‒ Low strip ratio ‒ Lower cost/ton milled ore ‒ Longer life of mine  Capex for expansion 2014-2016 ‒ Infrastructure ‒ Environment  Capex after 2020 ‒ New tailings dam, substantial  Decision 2014 Bo

  16. Slide 16: Boliden area

    Boliden area Boliden CMD 2013 16 2013-11-21

  17. Slide 17: Boliden area going forward

    Boliden area going forward  Boliden Concentrator ‒ Multi metal – multi process concentrator ‒ Continuous improvement on metallurgical performance  Kankberg Mine ‒ Increased reserve and resource ‒ Mi i method Mining th d ‒ Productivity  Renström mine ‒ Production volume  K i ti b Kristineberg Mi

  18. Slide 18: Garpenberg Summary

    Garpenberg Summary  Expansion project on time and cost  Commissioning Expansion project ‒ First half year 2014  Commissioning: mine ‒ Production target 2,0 Mtonnes ‒ Ore on stock ‒ Crushers – ore passes  Full production ‒ Shaft – hoisting critical ‒ 2,5 Mtonnes 2015 ‒ Capital development on trac

  19. Slide 19: Garpenberg – Ore production and grade mix

    Garpenberg – Ore production and grade mix 3000 2500 2000 3.8 % 1500 Resource Reserve 1000 5.1 % 500 0 Boliden CMD 2013 19 2013-11-21

  20. Slide 20: Tara

    Tara Boliden CMD 2013 20 2013-11-21

  21. Slide 21: Action plan

    Action plan  Increased productivity and Stefan Romedahl new General Manager in efficiency T Tara since i 1S September t b 2013 ‒ Continuous mining ‒ Continuous mucking ‒ Waste mucking ‒ Reduce, reuse and recycle ‒ More flexible use of contractors in craft areas  Cost savings from personnel cost ‒

  22. Slide 22: Zinc

    Zinc Boliden CMD 2013 22 2013-11-21

  23. Slide 23: Zinc

    Zinc Normal C1 Normal C1+Underhållsinvesteringar cents/lb metall cents/lb metall 250 250 250 250 200 200 200 200 150 150 150 150 100 100 100 100 50 50 50 50 0 0 0 0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2012 2013 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

  24. Slide 24: Laver

    Laver  Extended conceptual study  Technology base line ‒ Aitik 36  Environment impact assessment ‒ Decrease impact on landscape and environment ‒ Develop BAT for reclamation  Progress 2013 ‒ Continued drilling ‒ T t mining, Test i i 3 500 ttonnes off mineralization i li ti ‒ Focus on general des

  25. Slide 25: Laver

    Laver Laver MÖTE Ö MED STYRGRUPP BUDGET Next step: Application for mining concession Boliden CMD 2013 25 2013-11-21

  26. Slide 26: Disclaimer

    Disclaimer  This presentation has been prepared by Boliden for information purposes only. Nothing in this material shall be construed as an offer or solicitation to buy y or sell any y securityy or p product,, or to engage in or refrain from engaging in any transaction.  This presentation has been

  27. Slide 27: Boliden CMD 2013

    Boliden CMD 2013 27 2013-11-21