Adex Mining Inc. · TSXV:ADE

Adex Mining — Investor Presentation (February 2013)

20 slides from Adex Mining's investor presentation, Feb 21, 2013

  1. Slide 1: Adex Mining Inc.

    Slide 1: Adex Mining Inc.

    Adex Mining Inc. TSX-V: ADE Meeting global demand for specialty metals. w w w. a d e x m i n i n g . c o m

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer Certain statements in this Presentation may constitute “forward-looking” statements which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Corporation, or the industry in which it operates, to be materi

  3. Slide 3: About Us

    Slide 3: About Us

    About Us • Canadian-based mining company. • Excellent location and politically safe environment in province of New Brunswick. • Exclusive ownership of Mount Pleasant Mine property with two distinct projects. Mount Pleasant • Economic studies show potential Mine Property for a combined 15-year mine l

  4. Slide 4: Location: Best Mining Region

    Slide 4: Location: Best Mining Region

    Location: Best Mining Region Adex Mining Inc. TSX-V: ADE 4

  5. Slide 5: Mount Pleasant Projects

    Slide 5: Mount Pleasant Projects

    Mount Pleasant Projects North Zone Fire Tower Zone Mine Site Tailings Pond Adex Mining Inc. TSX-V: ADE 5

  6. Slide 6: Existing Infrastructure

    Slide 6: Existing Infrastructure

    Existing Infrastructure Estimated replacement value of CDN $84M. Adex Mining Inc. TSX-V: ADE 6

  7. Slide 7: Action Plan

    Slide 7: Action Plan

    Action Plan GOAL: Reach production as quickly and efficiently as possible to maximize shareholder value. The company is scheduling to complete the following milestones to aggressively advance restarting production at Fire Tower Zone: • Pre-feasibility study underway. • Completion of feasibility stud

  8. Slide 8: Rich Metal Inventory

    Slide 8: Rich Metal Inventory

    Rich Metal Inventory Adex Mining Inc. TSX-V: ADE 8

  9. Slide 9: About Fire Tower Zone

    Slide 9: About Fire Tower Zone

    About Fire Tower Zone Metals: Tungsten-molybdenum-bismuth. Location: Southeastern area of Mount Pleasant property. Completed: • Previously mined by BHP in 1983-85. • Produced 1M tonnes of tungsten. • Mine, tailings pond and metallurgical buildings remain. • NI 43-101 resource estimate 2008; amended

  10. Slide 10: Fire Tower Zone Financials

    Slide 10: Fire Tower Zone Financials

    Fire Tower Zone Financials Preliminary Assessment Mine life – current plan 12 years Production rate 2,400 t/d Pre-production capital $130M Annual revenue $92M Annual operating cost $49M Annual cash flow $46M Pre-tax NPV @ 8% $164M Pre-tax IRR 27% NI 43-101 Resource Estimate Fire Tower Tonnes WO3 MoS

  11. Slide 11: About North Zone

    Slide 11: About North Zone

    About North Zone Metals: Indium-tin-zinc. Location: Northwestern area of Mount Pleasant property. Completed: • NI 43-101 resource estimate 2009. • Preliminary Economic Assessment January 2010. • Pilot tin and indium–zinc concentrate production testing (SGS). • Developed zinc metal and indium sponge

  12. Slide 12: North Zone Financials & Resources

    Slide 12: North Zone Financials & Resources

    North Zone Financials & Resources Preliminary Assessment Updated NI 43-101 Resource Estimate Mine life – current plan 10 years North Zone Tonnes Sn Zn In % % ppm Production rate 850 t/d Indicated 12,400,000 0.38 0.86 64 Pre-production capital $71M Annual revenue $48M Inferred 2,800,000 0.30 1.13 70

  13. Slide 13: Strong Metal Demand

    Slide 13: Strong Metal Demand

    Strong Metal Demand FIRE TOWER ZONE NORTH ZONE Tungsten Indium • Drill bits, saw blades, ammunition, • TVs, flat-panel displays such as mobile phones, chrome-plating substitute, jewelry, computers (tin-indium oxide) incandescent light bulbs • Next generation of photovoltaic cells • Nose cone of the

  14. Slide 14: Tungsten

    Slide 14: Tungsten

    Tungsten PRODUCTS • The primary intermediate for tungsten is ammonium paratungstate. • Sold in a variety of forms: oxides, tungstate, tungsten carbide, concentrates and ferro-tungsten. PRODUCTION • World tungsten supply is dominated by Chinese production accounting for approximately 83% of the world

  15. Slide 15: Strong Leadership Team

    Slide 15: Strong Leadership Team

    Strong Leadership Team Yan Kim Po - Chairman of the Board and Interim President & CEO • Chairman , Executive Director and co-founder of Great Harvest Maeta Group Holdings Limited. • Responsible for the group's overall strategic planning and the management and development of its businesses. • Directo

  16. Slide 16: About Great Harvest

    Slide 16: About Great Harvest

    About Great Harvest • Deal with Great Harvest Canadian Investment Company Limited (“Great Harvest”) signed in October 2010 to fund development of projects at Mount Pleasant. • Owned and operated by Yan Kim Po, Chairman and Interim President & CEO of Adex, and Linda Lam Kwan, Director of Adex. • High

  17. Slide 17: Property Development History

    Slide 17: Property Development History

    Property Development History Activity Year Commenced/Completed Cost 600’ Adit development for tin. 1960s $10M No production achieved. NORTH ZONE North Zone decline and tin drilling by 1985-90 $50M LAC Minerals. Tin feasibility by Adex. 1992-97 $5M Drilling by Adex. 2007-08 $3M Preliminary assessment

  18. Slide 18: Share Structure

    Slide 18: Share Structure

    Share Structure As of Issued and outstanding shares 177,211,441 February 22, 2013 Fully diluted share structure 184,011,441 Fully diluted market $5,520,343 capitalization Current share price $0.03 52-week range CDN $0.03–$0.11 Working Capital Approx. $2.75 million Debt None Adex Mining Inc. TSX-V: A

  19. Slide 19: Adex Advantages

    Slide 19: Adex Advantages

    Adex Advantages Excellent location Well-timed to take advantage of Established economic recovery infrastructure and growth Predictable yields Stable political at target grade environment Low-risk strategies for staged development and financing Adex Mining Inc. TSX-V: ADE 20

  20. Slide 20: Contact Us

    Slide 20: Contact Us

    Contact Us Corporate Head Office Adex Mining Inc. 67 Yonge Street, Suite 900 Toronto, ON M5E 1J8 Tel: 416-941-9663 www.adexmining.com Investor Relations Primoris Group Inc. 160 Eglinton Ave. E, Suite 602 Toronto, ON M4P 3B5 Toll-free: 1-866-508-2339 Tel: 416-489-0092 investorrelations@adexmining.com

Source: Internet Archive copy of adexmining.com

More decks from Adex Mining Inc.

All 10 Adex Mining decks