Adex Mining Inc. · TSXV:ADE
Adex Mining — Investor Presentation (February 2013)
20 slides from Adex Mining's investor presentation, Feb 21, 2013

Slide 1: Adex Mining Inc.
Adex Mining Inc. TSX-V: ADE Meeting global demand for specialty metals. w w w. a d e x m i n i n g . c o m

Slide 2: Disclaimer
Disclaimer Certain statements in this Presentation may constitute “forward-looking” statements which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Corporation, or the industry in which it operates, to be materi

Slide 3: About Us
About Us • Canadian-based mining company. • Excellent location and politically safe environment in province of New Brunswick. • Exclusive ownership of Mount Pleasant Mine property with two distinct projects. Mount Pleasant • Economic studies show potential Mine Property for a combined 15-year mine l

Slide 4: Location: Best Mining Region
Location: Best Mining Region Adex Mining Inc. TSX-V: ADE 4

Slide 5: Mount Pleasant Projects
Mount Pleasant Projects North Zone Fire Tower Zone Mine Site Tailings Pond Adex Mining Inc. TSX-V: ADE 5

Slide 6: Existing Infrastructure
Existing Infrastructure Estimated replacement value of CDN $84M. Adex Mining Inc. TSX-V: ADE 6

Slide 7: Action Plan
Action Plan GOAL: Reach production as quickly and efficiently as possible to maximize shareholder value. The company is scheduling to complete the following milestones to aggressively advance restarting production at Fire Tower Zone: • Pre-feasibility study underway. • Completion of feasibility stud

Slide 8: Rich Metal Inventory
Rich Metal Inventory Adex Mining Inc. TSX-V: ADE 8

Slide 9: About Fire Tower Zone
About Fire Tower Zone Metals: Tungsten-molybdenum-bismuth. Location: Southeastern area of Mount Pleasant property. Completed: • Previously mined by BHP in 1983-85. • Produced 1M tonnes of tungsten. • Mine, tailings pond and metallurgical buildings remain. • NI 43-101 resource estimate 2008; amended

Slide 10: Fire Tower Zone Financials
Fire Tower Zone Financials Preliminary Assessment Mine life – current plan 12 years Production rate 2,400 t/d Pre-production capital $130M Annual revenue $92M Annual operating cost $49M Annual cash flow $46M Pre-tax NPV @ 8% $164M Pre-tax IRR 27% NI 43-101 Resource Estimate Fire Tower Tonnes WO3 MoS

Slide 11: About North Zone
About North Zone Metals: Indium-tin-zinc. Location: Northwestern area of Mount Pleasant property. Completed: • NI 43-101 resource estimate 2009. • Preliminary Economic Assessment January 2010. • Pilot tin and indium–zinc concentrate production testing (SGS). • Developed zinc metal and indium sponge

Slide 12: North Zone Financials & Resources
North Zone Financials & Resources Preliminary Assessment Updated NI 43-101 Resource Estimate Mine life – current plan 10 years North Zone Tonnes Sn Zn In % % ppm Production rate 850 t/d Indicated 12,400,000 0.38 0.86 64 Pre-production capital $71M Annual revenue $48M Inferred 2,800,000 0.30 1.13 70

Slide 13: Strong Metal Demand
Strong Metal Demand FIRE TOWER ZONE NORTH ZONE Tungsten Indium • Drill bits, saw blades, ammunition, • TVs, flat-panel displays such as mobile phones, chrome-plating substitute, jewelry, computers (tin-indium oxide) incandescent light bulbs • Next generation of photovoltaic cells • Nose cone of the

Slide 14: Tungsten
Tungsten PRODUCTS • The primary intermediate for tungsten is ammonium paratungstate. • Sold in a variety of forms: oxides, tungstate, tungsten carbide, concentrates and ferro-tungsten. PRODUCTION • World tungsten supply is dominated by Chinese production accounting for approximately 83% of the world

Slide 15: Strong Leadership Team
Strong Leadership Team Yan Kim Po - Chairman of the Board and Interim President & CEO • Chairman , Executive Director and co-founder of Great Harvest Maeta Group Holdings Limited. • Responsible for the group's overall strategic planning and the management and development of its businesses. • Directo

Slide 16: About Great Harvest
About Great Harvest • Deal with Great Harvest Canadian Investment Company Limited (“Great Harvest”) signed in October 2010 to fund development of projects at Mount Pleasant. • Owned and operated by Yan Kim Po, Chairman and Interim President & CEO of Adex, and Linda Lam Kwan, Director of Adex. • High

Slide 17: Property Development History
Property Development History Activity Year Commenced/Completed Cost 600’ Adit development for tin. 1960s $10M No production achieved. NORTH ZONE North Zone decline and tin drilling by 1985-90 $50M LAC Minerals. Tin feasibility by Adex. 1992-97 $5M Drilling by Adex. 2007-08 $3M Preliminary assessment

Slide 18: Share Structure
Share Structure As of Issued and outstanding shares 177,211,441 February 22, 2013 Fully diluted share structure 184,011,441 Fully diluted market $5,520,343 capitalization Current share price $0.03 52-week range CDN $0.03–$0.11 Working Capital Approx. $2.75 million Debt None Adex Mining Inc. TSX-V: A

Slide 19: Adex Advantages
Adex Advantages Excellent location Well-timed to take advantage of Established economic recovery infrastructure and growth Predictable yields Stable political at target grade environment Low-risk strategies for staged development and financing Adex Mining Inc. TSX-V: ADE 20

Slide 20: Contact Us
Contact Us Corporate Head Office Adex Mining Inc. 67 Yonge Street, Suite 900 Toronto, ON M5E 1J8 Tel: 416-941-9663 www.adexmining.com Investor Relations Primoris Group Inc. 160 Eglinton Ave. E, Suite 602 Toronto, ON M4P 3B5 Toll-free: 1-866-508-2339 Tel: 416-489-0092 investorrelations@adexmining.com
Source: Internet Archive copy of adexmining.com
More decks from Adex Mining Inc.
Investor Presentation (June 2025)15 slides · Jun 11, 2025
Investor Presentation (September 2014)20 slides · Sep 11, 2014
Investor Presentation (April 2014)20 slides · Apr 21, 2014
Investor Presentation (December 2011)15 slides · December 2011
Fact Sheet (October 2010)2 slides · Oct 25, 2010
Investor Presentation (October 2010)39 slides · October 2010