Titan Minerals Ltd · ASX:TTM

Titan Minerals — Investor Presentation (May 2021)

17 slides from Titan Minerals's investor presentation, May 2021

  1. Slide 1: Developing the Dynasty Gold Project in Ecuador's southern Andean copper-gold belt

    Developing the Dynasty Gold Project in Ecuador’s southern Andean copper-gold belt Investor Presentation May 2021

  2. Slide 2: Disclaimer and Forward-Looking Statements

    DISCLAIMER AND FORWARD-LOOKING STATEMENTS NOTES TO MINERAL RESOURCES NOT AN OFFER OF SECURITIES The Mineral Resource Estimates for the Dynasty Gold Project and Jerusalem Project are not reported in accordance with the JORC Code This presentation has been prepared by Titan Minerals Limited (“Titan” o

  3. Slide 3: Potential World Class Assets

    Potential World Class Assets Dynasty – Flagship Asset ▪ Foreign Current Resource: 2.1Moz (14.4Mt @ 4.5 g/t Au)(1) ▪ Previous small-scale mining operation ▪ High-grade mineralisation from surface Copper Duke ▪ Multi-phase, outcropping, gold rich porphyry copper system ▪ Has potential to be a Tier 1 A

  4. Slide 4: Corporate Overview

    Corporate Overview Key Executives & Management Technical Team Michael Hardy Non-Exec Chairman Laurence Marsland Siniša Glišić, Exploration Manager ▪ Mechanical engineer with 30 years experience in ▪ Master’s degree of Science in Geology from the mining project evaluation and development University o

  5. Slide 5: Investment Highlights

    Investment Highlights Developing World Dynasty – Pathway 2021 Highly Regarded Experienced Class Assets to Production Work Plan Jurisdiction Operational Team ▪ Dynasty – ▪ Fully funded to ▪ 12,000m drilling at ▪ Ecuador has attracted ▪ Management with +2Moz gold @ 4.5g/t(1) complete current drill Dyn

  6. Slide 6: Mining in Ecuador

    Mining in Ecuador Supportive Established New Mining Elimination Reduction of No gold Favourably Underexplored Mining mining Policy in June of the royalty rates export located at the vs. Peru or Ministry & laws 2019 windfall tax to 3-8% restrictions “hinge” of the Colombia Government Andes Investment

  7. Slide 7: Road Map

    Road Map Dynasty – Drilling Continuing Dynasty Geophysics Dynasty Resource Update Metallurgical Studies Dynasty – Delineation Drilling •12,000m drilling programme, •Field Validation of •JORC compliant resource •Commence preliminary •In-fill and extension drilling on In Progress Geophysical Interpret

  8. Slide 8: Dynasty Gold Project

    Dynasty Gold Project ▪ Foreign Resource: 2.1Moz (14.4Mt @ 4.5 g/t Au)(1) ▪ 139km2, 100% holding ▪ Permitted for drilling, with substantial growth potential ▪ 9km long by 1km, mineralised structural corridor with outcropping vein swarm with high-grade gold ▪ Close to Infrastructure ➢Pan American Hwy

  9. Slide 9: Dynasty Gold Project

    Dynasty Gold Project Veining mapped on topographical highs ▪ Mineralisation open along strike and at depth ▪ 5km gap in drilling on 9km high-grade surface anomaly ▪ Rock chip samples demonstrate extensive mineralisation ▪ Numerous un-drilled vein targets returning high- grade at surface ➢ 1.1m @ 20.

  10. Slide 10: Trial Mining

    Dynasty Gold Project Cerro Verde Prospect – Bulk tonnage potential ▪ Assay results demonstrate high-grade gold Cerro Verde mineralisation outside of existing resource ▪ Cerro Verde – open along strike and at depth ▪ High density veining supports potential for bulk tonnage mining over some areas ▪ 3

  11. Slide 11: Dynasty Gold Project – Bulk tonnage potential

    Dynasty Gold Project – Bulk tonnage potential Current Foreign Resource: 2.1Moz (14.4Mt @ 4.5 g/t Au) ▪ Gold mineralisation confirmed over 300m of vertical extent ▪ Cerro Verde shows high-density veining and mineralisation halos around some known veins ▪ Initially 3 modelled veins targeted in mining

  12. Slide 12: Dynasty Gold Project – Emerging large-scale gold system

    Dynasty Gold Project – Emerging large-scale gold system ▪ Resampled drill holes at Cerro Verde indicate deeper and broader gold halos than previously modelled ▪ Mineralised intercepts 3 to 5 times wider than previously modelled ▪ Grade increasing with depth ▪ Broader intercepts, across previously mo

  13. Slide 13: Copper Duke Project – Tier 1 Potential

    Copper Duke Project – Tier 1 Potential ▪ 18km east of Dynasty ▪ 130km2, 100% holding ▪ Multi-phase outcropping porphyry targets, including: ➢Porphyry copper-gold mineralisation ➢Epithermal gold bearing quartz-magnetite vein systems ▪ Open-ended surface geochem anomalism in soil and rock sampling wit

  14. Slide 14: Copper Duke Project – Geophysics

    Copper Duke Project – Geophysics ▪ Magnetic anomalies correspond with high-grade gold and copper geochemistry associated with porphyry style mineralisation observed at surface ▪ Airborne Survey confirmed and extended a corridor hosting multiple clusters of intrusive centres ▪ Clusters of intrusion r

  15. Slide 15: Linderos Project – High-grade gold discovery

    Linderos Project – High-grade gold discovery ▪ 143km2, 100% owned ▪ Located 20km southwest of flagship Dynasty Los Linderos ▪ High sulphidation gold system on the margin of copper porphyry related anomalism at surface ▪ 2017 trenching campaign, better intercepts include: ➢21.0m @ 18.5g/t Au ➢20.0m @

  16. Slide 16: Jerusalem Gold Project

    Jerusalem Gold Project High-grade gold and silver asset ▪ 100% owned 2.25km2 concession ▪ High-grade vein mineralisation from surface ▪ Historical diamond drillhole dataset of 47 diamond holes totalling 13,383m ▪ Total Foreign Resource: 1.28Moz gold @ 14.5g/t and 8.6Moz silver at 98g/t(1) ➢ Measured

  17. Slide 17: Laurence Marsland

    Laurence Marsland Managing Director +61 8 6555 2950 info@titanminerals.com.au titanminerals.com.au

Titan Minerals — Investor Presentation (May 2021) on 6ix