Nordic Mining Asa · OSL:NOM

Nordic Mining Asa — Q1 2022 Earnings Presentation

26 slides from Nordic Mining Asa's earnings presentation, May 10, 2022

  1. Slide 1: Q1 2022 Interim Presentation

    Large deposit with unique location Fully permitted project Minerals for a sustainable future Early construction works started EN Expand Oslo: NOM Significant value increase in lithium Q1 2022 Interim Presentation May 10, 2022

  2. Slide 2: Disclaimer

    Disclaimer This document has been used by Nordic Mining during an oral presentation. Therefore, this document is incomplete without the oral explanations, comments and supporting instruments that were submitted during the referred presentation. To the extent permitted by law, no representation or wa

  3. Slide 3: Agenda

    Agenda 1. Introduction 2. Engebø Rutile and Garnet 3. Keliber – Lithium 4. Financial update 5. Q & A 3

  4. Slide 4: Sustainable production of high-end industrial minerals and metals

    Sustainable production of high-end industrial minerals and metals Rutile (Titanium dioxide) • Environmentally friendly pigment • Air cleaning surface materials • Aircrafts and aerospace • Health applications Garnet Engebø Rutile (TiO2) and Garnet • Health and environmentally (100%) friendly cutting

  5. Slide 5: Q1 2022 Highlights and YTD 2022

    Q1 2022 Highlights and YTD 2022 ➢ Operational license for Engebø finally granted ➢ Permits for groundworks at Engebø resolved by Sunnfjord municipality ➢ Landowner properties acquired for process area at Engebø ➢ Early construction work commenced at Engebø ➢ Keliber’s DFS update - project post-tax N

  6. Slide 6: Strengthening of group management

    Strengthening of group management Mr. Maurice Kok engaged as Commercial Director Mr. Kok will have overall responsibilities for sales and marketing and will participate in the Groups activities within Business Development. Mr. Kok is a Dutch citizen and resides in Norway. Mr. Kok has broad and inter

  7. Slide 7: Agenda

    Agenda 1. Introduction 2. Engebø Rutile and Garnet 3. Keliber – Lithium 4. Financial update 5. Q & A 7

  8. Slide 8: Health and Safety

    Health and Safety HSE status Key Performance Year to Q1 Target * indicator date ▪ Fencing to secure the working area was completed in April Lost time injuries ▪ Main construction work started after fencing on April 21st (1/1 million working 0 0 <2,5 hours) ▪ Mandatory HSE training completed for curr

  9. Slide 9: Operational license finally resolved by Ministry of Trade, Industry and Fisheries

    Operational license finally resolved by Ministry of Trade, Industry and Fisheries • On May 5, the ministry resolved that the operating license for Engebø is maintained as granted with full rights to the Engebø deposit, confirming the resolution from the Directorate of Mining (“DirMin”). The decision

  10. Slide 10: A focused ESG policy – aiming for A-level rating

    A focused ESG policy – aiming for A-level rating • Our ESG Policy is based on the United Nations sustainability goals • We aim for A-level rating for our operations according to the Towards Sustainable Mining Initiative Environmentally responsible Positive impact on communities A safe and healthy wo

  11. Slide 11: Engebø has superior climate footprint

    Engebø has superior climate footprint Titanium producers analysis Total Scope 1 and 2 Emissions vs Emission Intensity Climate goals 4 500 000 3.5 • To produce top-rated products on Global Warming Potential 4 000 000 Total scope 1 and 2 emissions (tCO2e) 2020 3.0 GHG emission intensity (tCO2e per ton

  12. Slide 12: Goal of net gain for biodiversity

    Goal of net gain for biodiversity New methods for continuous tracking of biodiversity • As a response to The UN Convention on biodiversity ’The Post-2020 Global Biodiversity Framework’, the Engebø project has a goal of net gain for biodiversity over the Life of Mine • A Biodiversity Action Plan is b

  13. Slide 13: The Engebø project is positively anchored locally

    The Engebø project is positively anchored locally • On February 1st, 2022 the Sunnfjord Municipality Board resolved to approve the building permit for Engebø Rutile and Garnet. The Resolution was made with 35 of 42 members voting in favor. • Nordic Mining entered into EPC contracts with the fourth l

  14. Slide 14: Early construction work on process area started in April

    Early construction work on process area started in April • On April 20th NM finalized its process of acquiring landowner properties necessary for commencing construction work at the designated process plant area. • The early construction works started at site on April 21st. Progress of the early wor

  15. Slide 15: Globalization being reversed; EU and US call for increased domestic production

    Globalization being reversed; EU and US call for increased domestic production • The western world is increasingly dependent on foreign mineral sources that are essential for modern technologies, national security and prosperity. The war in Ukraine has led to an even stronger focus on production and

  16. Slide 16: Q1 remained firm for Ti feedstocks and TiO2 pigment production

    Q1 remained firm for Ti feedstocks and TiO2 pigment production TiO2 pigment • Kronos reported a 23% sales increase in Q1 2022 vs Q1 2021 • Tronox’ TiO2 revenues for Q1 increased by 11% compared to Q1 2021 • TiO2 inventory levels remain low and below seasonal norms. Rutile • Strong demand from all se

  17. Slide 17: Progressing financing discussions – target financial close before end H1 2022

    Progressing financing discussions – target financial close before end H1 2022 • NM is progressing assessment of several financing structures, with discussion on possible participation in project financing from selected strategic investors in final stages • Remaining project financing package is expe

  18. Slide 18: Agenda

    Agenda 1. Introduction 2. Engebø Rutile and Garnet 3. Keliber – Lithium 4. Financial update 5. Q & A 18

  19. Slide 19: Keliber project value increases by 220% to EUR 1.2 billion in updated DFS

    Keliber project value increases by 220% to EUR 1.2 billion in updated DFS ▪ Keliber is planned as the first fully integrated lithium producer in Europe with direct access to key European battery markets Project financials UDFS (DFS 2019) Post-tax NPV @8.0% EUR 1.23bn (EUR 384m) Post-tax IRR 31% (24%

  20. Slide 20: Positioned to be first supplier of battery grade lithium in Europe

    Positioned to be first supplier of battery grade lithium in Europe BASF TESLA • Europe is at the global j a p Operational 2020 TBC forefront in the EV CATL k KELIBER revolution, with Norway as b a spearhead 24 GWh 60 GWh 2026 LiOH plant, 2024 SAMSUNG SDI GS YUASA l 3 GWh plant operational r c 3 GWh

  21. Slide 21: Agenda

    Agenda 1. Introduction 2. Engebø Rutile and Garnet 3. Keliber – Lithium 4. Financial update 5. Q & A 21

  22. Slide 22: Fully funded up to remaining project financing targeted before end H1 2022

    Fully funded up to remaining project financing targeted before end H1 2022 The Group’s balance sheet remains solid: o NOK 32 million in cash - NOK 112.5 million on Escrow account for early construction works - Net cash outflow from operating activities of NOK 14 million, reflecting the ongoing work

  23. Slide 23: Agenda

    Agenda 1. Introduction 2. Engebø Rutile and Garnet 3. Keliber – Lithium 4. Financial update 5. Q & A 23

  24. Slide 24: Q & A

    Q&A ➢ Operational license for Engebø finally granted ➢ Permits for groundworks at Engebø resolved by Sunnfjord municipality ➢ Landowner properties acquired for process area at Engebø ➢ Early construction work commenced at Engebø ➢ Keliber’s DFS update states project post-tax NPV of EUR 1.2 billion

  25. Slide 25: Appendix #1 Consolidated income statement

    Appendix #1 Consolidated income statement Q1-2022 Q1-2021 2021 Unaudited Unaudited Amounts in NOK million Audited - 0.2 Other income 0.2 (4.4) (4.2) Payroll and related costs (16.2) (0.0) (0.0) Depreciation and amortization (0.1) (13.3) (11.8) Other operating expenses (44.5) (17.7) (15.9) Operating

  26. Slide 26: Appendix #2 Consolidated statement of financial position

    Appendix #2 Consolidated statement of financial position 31.03.2022 31.12.2021 Amounts in NOK million Unaudited Audited ASSETS Evaluation and exploration assets 28.9 28.8 Property, plant and equipment 0.2 0.2 Right-of-use assets 0.2 0.2 Financial investments 396.5 190.5 Total non-current assets 425.

Nordic Mining — Q1 2022 Earnings Presentation on 6ix