Torex Gold Resources Inc. · TSX:TXG

Torex Gold Resources — Investor Presentation (January 2026)

53 slides from Torex Gold Resources's investor presentation, Jan 26, 2026

  1. Slide 1: Corporate Presentation

    TSX | TXG OTCQX | TORXF CORPORATE PRESENTATION January 2026 All amounts expressed in U.S. dollars unless otherwise stated

  2. Slide 2: Safe Harbor Statement

    SAFE HARBOR STATEMENT Non-GAAP financial measures are financial measures with no standard meaning under International Financial Reporting Standards (“IFRS”) as issued by the international accounting standards board and might not be comparable to similar financial measures disclosed by other companie

  3. Slide 3: Torex Overview

    TOREX OVERVIEW GRYPHON & Intermediate Gold & Copper Producer MEDICINE SPRINGS C$7.7B 0.94x 12% 20% market value1 P/NAV1 FCF yield1 ROCE LTM1a Significant Size & Scale 377 koz 410-460 koz GUIGUI payable AuEq produced in 20252 AuEq sales guided in 20263 BATOPILAS Large & Growing Resource Base LOS REYE

  4. Slide 4: Robust Investment Thesis

    ROBUST INVESTMENT THESIS Executing across multiple fronts to drive superior shareholder returns Bolstering returns and delivering Robust investment thesis underpinned shareholder value by strong fundamentals Enhancing and extending production profile at Attractively valued relative to peers flagship

  5. Slide 5: Attractively Valued

    ATTRACTIVELY VALUED1b Trading at a discount to peers across key metrics despite robust fundamentals Refer to endnote 1b. 5

  6. Slide 6: 2026 Guidance

    2026 GUIDANCE Well-positioned to deliver increased production and cash flow year-over-year 2026 Guidance Metal Prices Production (prior to payable deductions) Gold ("Au") oz 320,000 to 365,000 $4,000/oz Silver ("Ag") koz 2,200 to 2,500 $45/oz Copper ("Cu") mlb 60 to 65 $4.90/lb Gold equivalent ("AuE

  7. Slide 7: Five-Year Production Outlook

    FIVE-YEAR PRODUCTION OUTLOOK Consistent gold equivalent production expected through at least 2030 2026 Guidance 2027 to 2030 Outlook Metal Prices Production (prior to payable deductions) Gold ("Au") oz 320,000 to 365,000 300,000 to 345,000 $4,000/oz Silver ("Ag") koz 2,200 to 2,500 2,500 to 2,800 $4

  8. Slide 8: Operations and Projects

    OPERATIONS AND PROJECTS

  9. Slide 9: Morelos Complex

    MORELOS COMPLEX Flagship operation is a significant producer of gold, silver, and copper Highly prospective 29,000 ha property located in prolific Guerrero Gold Belt, ~180 km from Mexico City Integrated operation with a centralized processing plant being fed by multiple underground mines Over 7.4 Mo

  10. Slide 10: Morelos Complex

    MORELOS COMPLEX Multi-mine operation with centralized processing plant producing concentrate and doré Ore Sources Processing Plant Media Luna Underground Flotation & Leach Circuits Expected to be fully ramped up in Q2 2026 Operating at steady state Capacity of 7,500 tpd Capacity of 10,600 tpd (7,052

  11. Slide 11: Morelos – Media Luna North (formerly EPO)

    MORELOS – MEDIA LUNA NORTH (formerly EPO) The next mine in the Media Luna Cluster is on track for first production by Q4 2026 Media Luna North Feasibility complete – mine life expected until at least 2034 Mining capacity of 2,300 tpd Leverages existing infrastructure at Media Luna Capex of $108-113M

  12. Slide 12: Los Reyes

    LOS REYES Expanding footprint in Mexico with high-quality, development stage project in Sinaloa Location 43 km from Cosalá in historic mining region, proximal to major mining operations 6,250+ ha within Los Reyes claim block Infrastructure & Labour Highway from Mazatlán to Cosalá and existing road n

  13. Slide 13: Los Reyes

    LOS REYES Preliminary economic assessment to be completed by mid-2026 Potential Timeline for Project Delivery Mid-2026 2027 2028 2029/2030 2031 PEA PFS Feasibility Study Construction Production On track for delivery Tentative timing, to be confirmed following completion of PFS Expect to fund develop

  14. Slide 14: Financial Performance

    . q 7 joo BBS: ~ , FINANCIAL PERFORMANCE

  15. Slide 15: Capital Allocation

    CAPITAL ALLOCATION Inaugural return of capital policy declared with return to positive free cash flow Mine Life & Margins Growth Enhance and extend production profile Advance and de-risk Los Reyes at Morelos through drilling Demonstrate potential of early-stage Drive efficiencies while prioritizing

  16. Slide 16: Free Cash Flow Generation

    FREE CASH FLOW GENERATION Significant increase in free cash flow with completion of Media Luna in Q2 2025 $450M of free cash flow forecast at midpoint of 2026 guidance3,5 ($4,000/oz Au, $45/oz Ag, $4.90/lb Cu) Total capital expenditures of $285M to $305M guided in 20265 ($100M to $105M required to b

  17. Slide 17: Return of Capital

    RETURN OF CAPITAL Total capital of $44M returned under Phase I program during 2025 Sustainable Dividend Opportunistic Share Buybacks Quarterly dividend of C$0.15/sh 825,769 shares purchased at C$57/sh (inaugural payment in Q4 2025) (additional shares acquired in 2026) 17

  18. Slide 18: Balance Sheet & Liquidity

    BALANCE SHEET & LIQUIDITY Balance sheet set to strengthen further with robust free cash flow Excluding leases, exited Q3 with net debt of $48M Available liquidity5 of $289M at the end of Q3 Net debt of $148M including leases Liquidity expected to materially improve with return $107M of cash to posit

  19. Slide 19: Exploration & Drilling

    EXPLORATION & DRILLING

  20. Slide 20: Exploration & Drilling a Key Driver of Value Creation

    EXPLORATION & DRILLING A KEY DRIVER OF VALUE CREATION Record investment of $77M planned in 2026 to conduct 148,500 m of drilling 2026 Budget 2026 Drilling Metres 2026 Allocation Increased budget reflects expanded portfolio of projects following Prime Mining and Reyna Silver acquisitions Budget for M

  21. Slide 21: Morelos Property

    MORELOS PROPERTY Drilling focused on enhancing production profile and extending mine lives $43M budgeted in 2026 (113,500 m of drilling) ELG Underground (36,000 m) Replacing reserves and growing resources Targeting discovery of new mineralized trends Media Luna Cluster (62,500 m) Expanding and upgra

  22. Slide 22: Los Reyes Project

    LOS REYES PROJECT Focus in 2026 is on resuming drilling and delivering an inaugural PEA $18M budgeted in 2026 (20,000 m) Illustrative Open Pit and Underground Optionality Oblique View, Looking Northeast, Grid Spacing = 500m Open Resumption of drilling predicated on improved regional security Open Gu

  23. Slide 23: Early-Stage Exploration Projects

    EARLY-STAGE EXPLORATION PROJECTS Focus will primarily be on drill testing key targets at Gryphon and Batopilas Gryphon & Medicine Springs (Nevada, USA) Batopilas & Guigui (Chihuahua, MX) $12M of expenditures planned in 2026 $4M of expenditures earmarked in 2026 Gryphon (7,500 m) Batopilas (5,000 m)

  24. Slide 24: Corporate Profile

    eo Torex Gold RESOURCES INC. CORPORATE PROFILE

  25. Slide 25: Committed to Responsible Mining

    COMMITTED TO RESPONSIBLE MINING Delivering value to shareholders while making a positive difference in society Excellent environmental performance Strong governance & diversity focus ZERO ICMC Board Executive Team reportable environmental achieved full certification All Independent Directors inciden

  26. Slide 26: Corporate Summary

    CORPORATE SUMMARY Share Price Performance1 Shareholder Data2 6.00 Other 5.50 Resource (Active) 5.00 (Active) 10% (Indexed to January 1, 2022) Price Performance - USD 4.50 28% 4.00 Resource 3.50 (Passive) 3.00 10% 2.50 Undisclosed/ Other 2.00 Retail (Passive) 1.50 41% 1.00 11% 0.50 TXG GDXJ Index Top

  27. Slide 27: Management Team

    MANAGEMENT TEAM Years of Name Experience Experience Joined Torex in 2018 as COO JODY KUZENKO LLB, ICD.D 25+ Appointed CEO in 2020 President and Chief Executive Officer Previously served as Director of Business Strategy at Vale ANDREW SNOWDEN CPA, CA Joined Torex in 2021 20+ Chief Financial Officer P

  28. Slide 28: Board of Directors

    BOARD OF DIRECTORS Years of Name Experience Experience RICK HOWES P.Eng. Board member since 2020 40+ Chair of the Board Seasoned senior mining executive with over 40 years of experience in the mining industry Director and CEO since 2020 JODY KUZENKO LLB, ICD.D 25+ Joined Torex in 2018 as COO Preside

  29. Slide 29: Mineral Reserves & Resources

    MINERAL RESERVES & RESOURCES

  30. Slide 30: Mineral Reserves

    MINERAL RESERVES Morelos Complex – December 31, 2024 Tonnes Au Ag Cu Au Ag Cu AuEq AuEq (kt) (gpt) (gpt) (%) (koz) (koz) (Mlb) (gpt) (koz) Media Luna Underground Proven 2,834 3.14 31.0 1.01 286 2,826 63 5.18 471 Probable 21,347 2.42 24.7 0.86 1,661 16,962 404 4.14 2,840 Proven & Probable 24,180 2.50

  31. Slide 31: Notes to Mineral Reserves

    NOTES TO MINERAL RESERVES Morelos Complex – December 31, 2024 Notes to accompany the mineral reserve table Notes to accompany the Media Luna North Underground (formerly EPO) mineral reserves 1. Mineral reserves were developed in accordance with CIM (2014) guidelines. 1. Mineral reserves for Media Lu

  32. Slide 32: Mineral Resources

    MINERAL RESOURCES Morelos Complex – December 31, 2024 Tonnes Au Ag Cu Au Ag Cu AuEq AuEq (kt) (gpt) (gpt) (%) (koz) (koz) (Mlb) (gpt) (koz) Media Luna Underground Measured 2,994 3.95 40.0 1.30 380 3,855 86 6.55 630 Indicated 26,120 2.83 30.2 1.05 2,374 25,385 603 4.90 4,114 Measured & Indicated 29,1

  33. Slide 33: Notes to Mineral Resources

    NOTES TO MINERAL RESOURCES Morelos Complex – December 31, 2024 Notes to accompany the mineral resource table Notes to accompany ELG Underground mineral resources 1. Mineral resources were prepared in accordance with the CIM Definition Standards (May 2014). 1. Mineral resources for ELG Underground ar

  34. Slide 34: Mineral Resources – Los Reyes

    MINERAL RESOURCES4a Los Reyes – October 15, 2024 Tonnes Gold Grade Silver Grade Gold Contained Silver Contained (kt) (gpt) (gpt) (koz) (Moz) Open Pit - Mill Indicated 24.7 1.13 35.7 899 28.3 Inferred 7.2 0.89 42.8 207 9.9 Underground - Mill Indicated 4.1 3.02 152.4 402 20.2 Inferred 4.1 2.10 78.6 27

  35. Slide 35: Notes to Mineral Resources

    NOTES TO MINERAL RESOURCES Los Reyes – October 15, 2024 1. Open Pit Resource estimates are based on economically constrained open pits generated using the Hochbaum Pseudoflow algorithm in Datamine’s Studio NPVS and the following optimization parameters (all dollar values are in US dollars): • $1,950

  36. Slide 36: Appendix – Operational & Financial

    APPENDIX – OPERATIONAL & FINANCIAL

  37. Slide 37: Sensitivity of AuEq Production and Costs

    SENSITIVITY OF AUEQ PRODUCTION AND COSTS Gold price strength impacting AuEq production and pressuring costs 2025 AuEq production2 negatively impacted by performance of Au relative to Cu when comparing performance relative to guidance metal prices Au +37% ($3,432/oz vs $2,500/oz for guidance) Ag +43%

  38. Slide 38: Currency and Commodity Hedges

    CURRENCY AND COMMODITY HEDGES Protection in place against foreign exchange volatility on operating costs All amounts in U.S. dollars 2026 2027 FY FY MXN/USD Forwards Amount (USD) M$ $12.0 $12.0 Average Price (MXN) MXN/USD 18.67 18.67 MXN/USD Collars Amount (USD) M$ $12.0 $9.0 Average Floor (MXN) MXN

  39. Slide 39: Operating Cash Flow Seasonality

    OPERATING CASH FLOW SEASONALITY Operating cash flow tends to be weakest in H1 given timing of tax, royalty and PTU payments Final payments related to royalties, profit sharing, and taxes are subject to movements in the Mexican peso relative to the U.S. dollar Cash flow from operations prior to chang

  40. Slide 40: Operating Cash Flow Seasonality

    OPERATING CASH FLOW SEASONALITY Timing Differences – Royalties & Profit Sharing Royalty – Mexican Geological Survey Profit Sharing – Employees 2.5% of gross revenue Mandated by Government of Mexico Accrued quarterly and paid the following quarter Accrued quarterly and paid annually in Q2 of the Reco

  41. Slide 41: Operating Cash Flow Seasonality

    OPERATING CASH FLOW SEASONALITY Timing Differences – Mining Royalty & Corporate Income Tax Mining Tax – Government of Mexico Corporate Income Tax – Government of Mexico 8.5% of mine level EBITDA 5 plus allowable 30% of taxable income in Mexico deductions Accrued quarterly and paid monthly via instal

  42. Slide 42: Concentrate Logistics

    CONCENTRATE LOGISTICS Sales and logistics process for copper concentrate Material Flow Production Trucking Warehouse Loading Departure Port Shipping Destination Port Smelter (Manzanillo) (Manzanillo) (varies) 2-day transit 1-2 month transit Accumulate 5-10kt parcel at to destination port warehouse b

  43. Slide 43: Appendix – Exploration & Drilling

    APPENDIX – EXPLORATION & DRILLING

  44. Slide 44: Growing Reserves & Resources

    GROWING RESERVES & RESOURCES Significant resource upside given majority of Morelos remains unexplored Leveraging Torex Exploration System to systematically advance targets from initial selection stage through to reserve definition System has been effectively deployed at Morelos and is now being expo

  45. Slide 45: Morelos – Significant Exploration Upside Exists

    MORELOS – SIGNIFICANT EXPLORATION UPSIDE EXISTS Structural corridor is key to unlocking the exploration potential of Morelos Magnetic imaging shows strong potential for additional resource upside at Morelos The north-south structural corridor is considered the main ore control of mineralization The

  46. Slide 46: Morelos – ELG Underground

    MORELOS – ELG UNDERGROUND Building on a proven track record of mine life extensions Drilling success at ELG Underground is a key driver of maintaining output at current levels Recent drilling discovered two new second order structures Parallel to the El Limón Sur and Sub-Sill trends Potentially acte

  47. Slide 47: Morelos – ELG Underground

    MORELOS – ELG UNDERGROUND New second order structures identified parallel to main trends8 Two new second order structures discovered Discovery has extended known mineralization laterally and vertically within El Limón Sur and Sub-Sill trends Highlights underlying mineralized potential of the deposit

  48. Slide 48: Morelos – Media Luna Cluster

    MORELOS – MEDIA LUNA CLUSTER Identifying potential new sources of feed on the south side of Morelos Property Media Luna & Media Luna North Focused on replacing mined reserves while expanding mineral resources Media Luna West Drilling has defined a mineralized footprint of 400 x 300 m Inaugural Infer

  49. Slide 49: Morelos – Media Luna North (formerly EPO)

    MORELOS – MEDIA LUNA NORTH (formerly EPO) Strong potential to expand resources to the north with year-end update9 Drilling continues to yield excellent results, including: 55.18 gpt AuEq over 20.1 m in ML24- 1049DA & 4.55 gpt AuEq over 15.0 m in ML24-1041D Indicates strong potential to expand resour

  50. Slide 50: Morelos – Media Luna West

    MORELOS – MEDIA LUNA WEST Working towards an initial Inferred Resource in 20268 Drilling at Media Luna West shows high-grade intercepts over different structural blocks at distinct elevations Most notably, ML25-1095D returned 17.79 gpt AuEq over 12.9 m & ML25-1088D returned 12.25 gpt AuEq over 11.0

  51. Slide 51: Morelos – Media Luna East

    MORELOS – MEDIA LUNA EAST Initial drill testing program returned excellent results8 Initial drill testing program at Media Luna East returned high-grade intercepts over different structural blocks Most notably, MLE-003 returned 28.12 gpt AuEq over 18.3 m and 18.28 gpt AuEq over 12.0 m Mineralization

  52. Slide 52: Endnotes

    ENDNOTES 1. Estimates provided by S&P Capital IQ as of January 26, 2025. a. Return on capital employed (“ROCE”) calculated as EBIT / (total assets - total current liabilities). b. Peer average multiples based on consensus estimates for Alamos Gold, Allied Gold, Aris Mining, Artemis Gold, Aura Minera

  53. Slide 53: Contact

    TSX | TXG OTCQX | TORXF www.torexgold.com Dan Rollins, CFA Senior Vice President, Corporate Development and Investor Relations Email: dan.rollins@torexgold.com | Direct: 1-647-260-1503

Torex Gold Resources — Investor Presentation (January 2026) on 6ix