Archer Materials Limited · ASX:AXE

Archer Materials — Archer Exploration — South Australian Exploration and Mining Conference 2015

20 slides from Archer Materials's conference presentation, Dec 11, 2015

  1. Slide 1: Archer's Eyre Peninsula Graphite Projects

    For personal use only ARCHER EXPLORATION LIMITED Archer’s Eyre Peninsula Graphite Projects South Australian Exploration and Mining Conference 11th December 2015 Gerard Anderson Managing Director 0

  2. Slide 2: Archer Exploration - company overview

    Archer Exploration - company overview FIND ADD VALUE MONETISE For personal use only 100% of 16 tenements in South Australia covering key commodities – graphite, magnesite, manganese, copper and gold 1

  3. Slide 3: Archer Graphite – 3 deposits and 10 prospects

    Archer Graphite – 3 deposits and 10 prospects Tenement holding of 2,154km2 on the Eyre Peninsula hosting Australia’s largest 2012 JORC graphite resource For personal use only Archers Key Graphite Assets Locations of Resources and Exploration Targets Near Cleve-Darke Peak-Kimba, Eyre Peninsula, South

  4. Slide 4: Campoona Graphite – the elements

    1. Campoona Graphite – the elements Mine, processing & water For personal use only Development elements MC Campoona Shaft - covering the conventional open pit mine Pindari MPL Sugarloaf - covering the Sugarloaf processing site and TSF MLP Water - covering the Pindari Borefield and process water line

  5. Slide 5: Community consultation

    Campoona Graphite - community consultation Longstanding community engagement with excellent community support for project For personal use only Focus group meeting in September 2013. Established a Community Consultative Committee (CCC) with community representatives, Archer, invited guests (facilita

  6. Slide 6: Mine

    Campoona Graphite - mine Conventional, largely free dig open pit For personal use only Mining Compact site ≈ 68 Ha Conventional open pit mine largely free dig to 70m bgl Campaign day-shift only mining (notionally spring and autumn) to mine up to 140,000tpa of graphite ore grading 10% Cg Pit depth 10

  7. Slide 7: Mineral processing

    Campoona Graphite – mineral processing Mineral processing facility to be built on Company-owned land at Sugarloaf 12km west of Campoona For personal use only Mineral processing Production of up to 10,500 tpa of very high purity graphite Process steps: - Crushing - Blunging - Rougher Flotation - Conc

  8. Slide 8: Infrastructure

    Campoona Graphite - infrastructure Power, water, transport and shipping For personal use only Process water High yielding fractured rock aquifer at Pindari located 10 kms north of Sugarloaf Saline water ≈ 22,500 ppm TDS - no other beneficial users Two bores to supply initial requirement of 100ML/yr

  9. Slide 9: Product

    Campoona Graphite - product Archer to produce ≥99% Cg natural graphite concentrate For personal use only Overview of Campoona Metallurgy Testing Highly Crystalline Fine Graphite Concentrate Since October 2012, Archer has undertaken rigorous metallurgical bench-scale testing of representative diamond

  10. Slide 10: Product specifications

    Campoona Graphite – product specifications Campoona graphite suitable for several applications including batteries and very high quality lubricants For personal use only Production of up to 10,500 tpa high purity graphite - option to start smaller and increase output over time Typical specifications

  11. Slide 11: >99.9% graphene

    Campoona Graphite – >99.9% graphene Archer and the University of Adelaide have a two-year research collaboration into graphite and graphene products. For personal use only Graphite Materials Prepared Semi-products Prepared Products Archer Product Examples Graphene Nanosheets Graphene Oxide Sheets Gr

  12. Slide 12: Graphite converts to >99.9% graphene

    Campoona graphite converts to >99.9% graphene High grade Campoona graphite concentrate enables production of pure graphene For personal use only Selected graphene products : graphene conductive film, conductive flexible polymer, graphene composite and electrodes for batteries and supercapacitors The

  13. Slide 13: Project timetable

    Campoona Graphite – Project timetable PEPR must be submitted within 12 months of Mining Lease approval For personal use only Final MLP ready for submission but will be held until off-take agreements signed Current MLP based on production of 10,500tpa of >99% Cg graphite concentrates Several parties

  14. Slide 14: Sugarloaf carbon

    2. Sugarloaf carbon Unique carbon material with soil conditioning properties For personal use only Initial research included extracting graphene from Sugarloaf carbon to coat superphosphate to slow the release rate of the nutrients. This work was very successful however, the outcome was likely to be

  15. Slide 15: Sugarloaf carbon – potential as soil ameliorator

    Sugarloaf carbon Potential as soil ameliorator For personal use only Sugarloaf carbon improves soil wettability and moisture retention which is critical in sandy soils that predominate on Eyre Peninsula Further tests on run-of-mine Sugarloaf carbon are planned to further characterise the soil amelio

  16. Slide 16: Waddikee – Flake graphite

    3. Waddikee – Flake graphite Wilclo South JORC 2012 Inferred Resource of 6.28Mt @ 8.8% Cg over a strike of 1.2 kms. Recent drilling extended the deposit’s strike For personal use only by a further 1.2 kms. Total Wilclo to Wilclo-South strike potential is over 11 kms. Large flake graphite was interse

  17. Slide 17: Waddikee Flake graphite

    Waddikee Flake graphite Wilclo South: ≈50% of graphite recovered as Extra Large, Large, Medium and Fine Flake For personal use only The Wilclo South deposit and Francis prospect produced Extra Large, Large, Medium and Fine Flake graphite at grades of 91-92% Cg from basic Halutain superpanner sorting

  18. Slide 18: Disclaimer

    Disclaimer For personal use only Competent persons statement The exploration results and Exploration Target reported herein, insofar as they relate to mineralisation, are based on information compiled by Mr Wade Bollenhagen, Exploration Manager of Archer Exploration Limited. Mr Bollenhagen is a Memb

  19. Slide 19: Contact details

    www.archerexploration.com.au For personal use only Contact details Archer Exploration Limited Gerard Anderson Managing Director Ph: +61 8 8272 3288 Fax: +61 8 8272 3888 Email: ganderson@archerexploration.com.au Thank you 18

  20. Slide 20: Appendix - Archer Graphite Summary

    Appendix 1 - Archer Graphite Summary Australia’s largest JORC 2012 Graphite Resource For personal use only Executive Summary Large Position in a Location 2,154km2 of tenements near Cleve-Darke Peak-Kimba on Eyre Peninsula, South Australia 1 Premium Graphite Eyre Peninsula is Australia’s premier grap

Archer Exploration — South Australian Exploration and Mining Conference 2015 on 6ix