Slide 1: Wachovia LNG Conference
ENERGY PARTNERS, L.P. Wachovia LNG Conference November 13, 2007
Slide 2: Forward Looking Statements
Forward Looking Statements This presentation contains forward looking statements, including these, within the meaning of Section 27A of the Securities Act of 1933, as amended and Section 21E of the Exchange Act of 1934, as amended. Forward looking statements are not guarantees of performance. They i
Slide 3: Overview
Overview Who is KMP? Infrastructure Opportunities in North America KMP Response ENERGY PARTNERS, L.P. 3
Slide 4: Who is KMP?
Who is KMP? Largest independent transporter of petroleum products in the U.S. transport more than 2 million barrels per day (Bbl/d) 2nd largest transporter of natural gas in U.S. approximately 24,000 miles of interstate / intrastate pipeline 2nd largest natural gas storage operator in U.S. approxima
Slide 5: KMP System Map
KMP System Map Trans PRODUCTS PIPELINES Mountain PRODUCTS PIPELINES TERMINALS 2 Cochin TRANSMIX FACILITIES NATURAL GAS PIPELINES NATURAL GAS STORAGE 2 NATURAL GAS Pacific PROCESSING ROCKIES EXPRESS PIPELINE IN-SERVICE ROCKIES EXPRESS PIPELINE 2 KM LOUISIANA PIPELINE Trailblazer 3 MIDCONTINENT EXPRES
Slide 6: Newbuild Natural Gas Pipelines
Newbuild Natural Gas Pipelines Wyoming Nebraska Indiana Ohio Illinois Colorado Kansas Missouri Oklahoma ROCKIES EXPRESS PIPELINE IN-SERVICE Mississippi ROCKIES EXPRESS PIPELINE Alabama MIDCONTINENT EXPRESS PIPELINE Texas Louisiana Texas KM LOUISIANA PIPELINE KM HEADQUARTERS Rockies Midcontinent KM E
Slide 7: Shifting Natural Gas Supply Sources
Shifting Natural Gas Supply Sources Natural Gas Supply % Production Volumes (Bcf/d) 2006 2010 Change Change Rockies Natural Gas (a) 8.2 10.6 2.4 29% Barnett Shale Natural Gas (b) 1.5 5.5 4.0 267% Gulf Coast LNG Imports (a) 0.4 2.7 2.3 575% Rockies production expected to increase 29% 2006-2010 (a) Ba
Slide 8: North American Energy Trends
North American Energy Trends Expanding Canadian Oilsands Production Growing Rockies Natural Gas Production Increased Supply of LNG on Gulf Coast Increased Use of Heavy Crude Growing Coal Imports ENERGY PARTNERS, L.P. 8
Slide 9: LNG: Increased Supply on Gulf Coast
LNG Increased Supply on Gulf Coast ENERGY PARTNERS, L.P. 9
Slide 10: Kinder Morgan Louisiana Pipeline LLC
Kinder Morgan Louisiana Pipeline LLC
Slide 11: Kinder Morgan Louisiana Pipeline LLC
Kinder Morgan Louisiana Pipeline LLC System Map Project Overview Project Progress Project Attributes Delivery Interconnects & Capacities Prospects Summary ENERGY PARTNERS, L.P. 11
Slide 12: Kinder Morgan Louisiana Pipeline LLC
Kinder Morgan Louisiana Pipeline LLC ENERGY PARTNERS, L.P. 12
Slide 13: Kinder Morgan Louisiana Pipeline LLC Sabine Area-Leg Schematic
Kinder Morgan Louisiana Pipeline LLC Sabine Area-Leg 2 Schematic Leased Capacity NGPL Delivery Point on NGPL NGPL 30” NGPL 30” NGPL 30” NGPL 30” Leg 1 Leg 2 NGPL 16” NGPL 24” Tie-In Facilities Leg 2 Receipt Point Leg 1 Receipt Point Southwest Loop Johnson’s Bayou Sabine Pass Delivery Point LNG Termi
Slide 14: Kinder Morgan Louisiana Pipeline LLC Project Overview
Kinder Morgan Louisiana Pipeline LLC Project Overview Total capital cost is approximately $517 million Two legs, both starting at Cheniere’s Sabine Pass LNG Terminal Leg 1: 132 miles of 42-inch pipe continuing to the northeast and ending at Columbia Gulf Transmission Company’s mainline, north of Ray
Slide 15: Kinder Morgan Louisiana Pipeline LLC Project Progress
Kinder Morgan Louisiana Pipeline LLC Project Progress The Commission issued an order granting KMLP certificate authorization on June 22, 2007 KMLP accepted the certificate on July 10, 2007 Filed Implementation Plan with FERC August 17, 2007 14 delivery interconnects and all key agreements executed P
Slide 16: Project Attributes
Project Attributes KMLP is a high pressure system Leg 1 Receipt Pressure is 1,440 psi Leg 2 Receipt Pressure is 1,100 psi The initial project has no compression and will rely on pressure from the LNG terminal Tie-in facilities will allow gas to flow bi-directionally between Legs 1 and 2 Line Heating
Slide 17: Project Attributes (con't)
Project Attributes (con’t) Initial Project Capacity is Sold Out Executed Precedent Agreement with Chevron USA MDQ: 1, 697,500 Dth/d Negotiated Rate: Fixed for term of contract Term: 20 years Executed Precedent Agreement with TOTAL Gas & Power North America, Inc MDQ: 1,697,500 Dth/d Negotiated Rate:
Slide 18: Delivery Interconnects & Capacities
Delivery Interconnects & Capacities Meter Capacity Interconnecting Pipeline (Mcf per day) ANR (South of the ANR Eunice Station) 200,000 Bridgeline Holding L.P. (Leg 2) 200,000 Columbia Gulf Transmission 1,500,000 Florida Gas Transmission Company 300,000 KMLP - NGPL (Leg 2) 1,500,000 Pine Prairie Sto
Slide 19: Prospects
Prospects Storage KMLP will have a bi-directional Interconnect with Pine Prairie Storage of 600,000 Mcf/d. Pipeline route has access to other potential gas storage connections and potential storage development. Egan Liberty Black Bayou Hackberry ENERGY PARTNERS, L.P. 19
Slide 20: Prospects (con't)
Prospects (con’t) LNG Terminals KMLP system could access existing and newly developing LNG terminals. Golden Pass LNG Lake Charles LNG Cameron LNG Additional LNG connections could provide optionality for LNG suppliers and market flexibility for Shippers. ENERGY PARTNERS, L.P. 20
Slide 21: Prospects (con't)
Prospects (con’t) Expansion / Extension Capabilities KMLP has evaluated expansion options without compression for incremental capacity between 300 MMcf/d to 1.5 Bcf/d from the Sabine Pass, Lake Charles LNG and Cameron LNG terminals to the various east coast pipelines. Such expansion options could al
Slide 22: Summary
Summary LNG Supplies are a long term component of the US gas supply portfolio The gas storage in southwestern Louisiana continues to be expanded and new storage projects are being developed KMLP represents a new generation of pipeline projects that is situated to link LNG supplies to the interstate
Slide 23: Kinder Morgan Energy Partners, L.P.
ENERGY PARTNERS, L.P. KINDER/MORGAN