Tellurian Inc

Tellurian — Investor Presentation (May 2019)

29 slides from Tellurian's investor presentation, May 1, 2019

  1. Slide 1: 2

    2

  2. Slide 2: Experience matters to deliver value

    Experience matters to deliver value 3 ~50% of Tellurian ~$8 CF/share ~$550 per tonne Is owned by founders, directors, officers and other employees Fully wrapped LSTK EPC contract with Bechtel and final FERC order received Projected annual cash flow to Tellurian through the sale of low-cost LNG on th

  3. Slide 3: Final FERC permit complete

    Received in April 2019 final FERC order granting authorization to construct and operate the Driftwood LNG terminal and pipeline Final FERC permit complete 4 Artist rendition

  4. Slide 4: Bechtel LSTK secures project execution

    Phase 1 Phase 2 Phase 3 Phase 4 Total Bechtel LSTK secures project execution Leading LNG EPC contractor 44 LNG trains delivered to 18 customers in 9 countries ~30% of global LNG liquefaction capacity (>125 mtpa) Tellurian and Bechtel relationship 16 trains(1) delivered with Tellurian’s executive tea

  5. Slide 5: Best team in the business

    Best team in the business 6 Our combination of talents sets us apart from every other developer. Our leadership is underpinned by a team with unmatched experience. 79 50 mtpa, our team is responsible for over 15% of the LNG in production today Our team has delivered cost-leading LNG projects for ove

  6. Slide 6: Sourcing low-cost gas from multiple basins

    Sourcing low-cost gas from multiple basins Note: Pipelines drawn are for illustrative purposes and are not intended to represent actual pipeline routes. 7 PGAP HGAP DCPL Driftwood LNG DWPL Access to low-cost gas from growing Appalachia and Midcontinent basins Developing supply network to access gas

  7. Slide 7: Depressed West Texas gas prices to persist

    Local demand Effective takeaway capacity Exports to Mexico New firm capacity Permian dry gas production(2) Depressed West Texas gas prices to persist Sources: Platts, IHS Markit, Tellurian Research Notes: (1) Reflects average daily Platts Waha cash prices from 3/25/19 through 4/23/19. (2) Dry gas pr

  8. Slide 8: Integrated model to produce low-cost LNG on the water

    Integrated model to produce low-cost LNG on the water Variable and operating costs expected to be $2.50-$3.00/mmBtu FOB ~$20 billion in project finance debt equates to $1.00-$1.50/mmBtu(2) Tellurian retains ~14 mtpa and ~49% of the assets Projected ~$2 billion annual cash flow to Tellurian = $8.00 p

  9. Slide 9: Driftwood Holdings' financing

    Driftwood Holdings’ financing 10 Notes: (1) Based on engineering, procurement, and construction agreements executed with Bechtel. (2) Approximately half of owners’ costs represent contingency; the remaining amounts consist of cost estimates related to staffing prior to commissioning, estimated impac

  10. Slide 10: Value to Tellurian Inc.

    USGC netback ($/mmBtu) Cost of LNG(1) ($/mmBtu) Margin ($/mmBtu) 2 Plants 3 Plants 5 Plants Cash flows(2)(3)(4) $ millions ($ per share) Tellurian capacity 5.0 mtpa 6.6 mtpa 13.6 mtpa $ 6.00 $4.50 $ 1.50 $190 ($0.71) $320 ($1.20) $870 ($3.26) $ 8.00 $4.50 $ 3.50 $710 ($2.66) $1,010 ($3.79) $2,280 ($

  11. Slide 11: Final Investment Decision expected in 2019

    Final Investment Decision expected in 2019 12 Fully-wrapped EPC contract Draft FERC EIS Final FERC EIS Final FERC Order DOE license to export to non-FTA countries Complete capital raise process Partner & equity funding Debt syndication Final Investment Decision First LNG Milestone Target date Novemb

  12. Slide 12: Contact us

    Social media Contact us Amit Marwaha Director, Investor Relations & Finance +1 832 485 2004 amit.marwaha@tellurianinc.com Joi Lecznar SVP, Public Affairs & Communication +1 832 962 4044 joi.lecznar@tellurianinc.com 13 @TellurianLNG

  13. Slide 13: Contact us

    Contact us = Amit Marwaha Social media Director, Investor Relations & Finance +1 832 485 2004 yw @TellurianLNG amit.marwaha@tellurianinc.com GlYoulube = Joi Lecznar SVP, Public Affairs & Communication ‘in| +1 832 962 4044 joi.lecznar@tellurianinc.com

  14. Slide 14: Key investment highlights

    Key investment highlights 15 Received final FERC order in April 2019 Guaranteed lump sum turnkey contract with Bechtel $15.2 billion for 27.6 mtpa capacity (~$550 per tonne) Expect Permian associated gas prices to remain distressed, Waha currently ~$0.50/mmBtu Continued improvements in Haynesville d

  15. Slide 15: Steps towards final investment decision

    Project design Regulatory Negotiate agreements Final contracts Debt/project finance terms Final investment decision Steps towards final investment decision 16 2019 FID • FEED studies • EPC • Equipment selection • Secure permits and certificates • Non-binding agreements, including governance terms •

  16. Slide 16: Global LNG capacity call: ~100-250 mtpa

    Global LNG capacity call: ~100-250 mtpa Sources: Wood Mackenzie, Tellurian Research. Notes: (1) Assumes 85% utilization rate. (2) Assuming sustained 2015-2018 demand growth rate of ~9.3% p.a. post-2019. (3) Conservative estimate of 5.0% p.a. demand growth rate post-2019. 18 Under construction In ope

  17. Slide 17: Total expected to be first equity partner at $500 per tonne

    Total expected to be first equity partner at $500 per tonne 19 Potential partner Proposed off-take Proposed volume Credit rating(1) Driftwood project Equity investor 1.0 mtpa A+/Aa3/AA- Equity investor Under review Baa2 (Moody’s) Tellurian Marketing JKM linked 1.5 mtpa A+/Aa3/AA- JKM linked (Equity

  18. Slide 18: Project advancement

    Project advancement Common stock purchase agreement with Total Heads of Agreement (“HOA”) with Total Tellurian signs agreements with Total Total Delaware, Inc. (“Total”) signs HOA to make $500 million equity investment in Driftwood project and for Total to purchase 1 mtpa of LNG Total to purchase 1.

  19. Slide 19: Commercial momentum to 3-plant FID

    Commercial momentum to 3-plant FID Notes: (1) Represents required equity contribution at $500/tonne. (2) Based on signed Heads of Agreement (HOA). (3) Based on signed Memorandum of Understanding (MOU) with volume to be determined. (4) Based on signed MOU. 21 mtpa mtpa (2) (2) (4) Driftwood Holdings

  20. Slide 20: Driftwood Holdings' operating costs

    Driftwood Holdings’ operating costs Sources: Wood Mackenzie, Tellurian Research. Notes: (1) Based on debt service cost of principal and interest related to ~$20.0 billion of project finance debt. 22 (1) Debt Drilling & completion Operating Gathering, processing & transportation Contingency Liquefact

  21. Slide 21: Returns to Driftwood Holdings' partners

    Returns to Driftwood Holdings’ partners 23 U.S. Gulf Coast netback price ($/mmBtu) $6.00 $8.00 $10.00 $15.00 Driftwood LNG, FOB U.S. Gulf Coast ($/mmBtu) $(3.50) $(3.50) $(3.50) $(3.50) Margin ($/mmBtu) 2.50 4.50 6.50 11.50 Annual partner cash flow(1) ($ millions per tonne) 130 235 340 600 Cash on c

  22. Slide 22: Owning infrastructure mitigates risk

    Owning infrastructure mitigates risk 24 Tolling model SPA model Equity model Customer incurs risk Competition between customers for pipeline access leads to hidden costs and higher cost of LNG on the water Developer incurs risk Developer consolidates pipeline transport, but still a price taker for t

  23. Slide 23: Integrated to manage three risks

    Basin 10,800 Haynesville acres 1.4 Tcf of resource Intend to acquire 15 Tcf Basis ~$7 billion of pipeline projects, providing access to Haynesville, Permian, & Appalachia supply Integrated to manage three risks 25 Construction ~$15 billion liquefaction project in Louisiana

  24. Slide 24: Driftwood LNG terminal

    Driftwood LNG terminal Note: (1) Based on engineering, procurement, and construction agreements executed with Bechtel. 26 Driftwood LNG terminal Land ~1,000 acres near Lake Charles, LA Capacity ~27.6 mtpa Trains Up to 20 trains of ~1.38 mtpa each Chart heat exchangers GE LM6000 PF+ compressors Stora

  25. Slide 25: Construction budget breakdown

    Construction budget breakdown Notes: Based on Driftwood LNG full development. (1) Includes additional contingency by developer and staffing prior to commencement of operations. (2) Provisional sum includes escalation factor for inflation, insurance, foreign exchange, and other costs. 27 24% 24% 24%

  26. Slide 26: Bringing low-cost gas to SW Louisiana

    2 3 4 1 Bringing low-cost gas to SW Louisiana 28 Driftwood Pipeline(1) Capacity (Bcf/d) 4.0 Cost ($ billions) $2.2 Length (miles) 96 Diameter (inches) 48 Compression (HP) 274,000 Status FERC approval complete Haynesville Global Access Pipeline(1) Capacity (Bcf/d) 2.0 Cost ($ billions) $1.4 Length (m

  27. Slide 27: >100 Tcf available resources in Haynesville

    >100 Tcf available resources in Haynesville Sources: IHS Enerdeq; 1Derrick; investor presentations; Tellurian research. Note: (1) Estimated resources based on acreage. 29 Driftwood Holdings plans to fund and purchase 15 Tcf Potential acquisition targets: Range of resources per target (Tcf)(1): Targe

  28. Slide 28: Building momentum to FID in 2019

    February Announce MOU for Driftwood equity investment with Petronet Building momentum to FID in 2019 30 June Raise approximately $115 million in public equity March Bechtel invests $50 million in Tellurian Feb/March Announce open seasons for Haynesville Global Access Pipeline and Permian Global Acce

  29. Slide 29: Building momentum to FID in 2019

    Building momentum to FID in 2019 ® September @ February December ¢* * Management, Merge with Raise friends and Magellan approximately family invest Petroleum, $100 million in $60 million in gaining public equity Tellurian access to public markets 2016 2017 @ |? ry ise Ee December e ¢ January june, N

Tellurian — Investor Presentation (May 2019) on 6ix