Platina Resources Limited · ASX:PGM

Platina Resources — Investor Presentation (January 2019)

39 slides from Platina Resources's investor presentation, Jan 21, 2019

  1. Slide 1: Investor Presentation

    For personal use only January 2019 Investor Presentation Advancing one of the world’s highest-grade scandium projects towards development

  2. Slide 2: Platina at a glance

    Platina at a glance Platina Scandium (100%) New South Wales For personal use only Platina is listed on the Australian Securities  Target – Sc, Co, Ni & Pt Exchange (ASX:PGM)  One of the world’s highest-grade scandium PGM holds a high- deposits quality portfolio of scandium, cobalt, gold  DFS comp

  3. Slide 3: Capital Structure

    Capital Structure For personal use only Share Structure Capitalisation ASX Code PGM Price 18 January 2019 7.0¢ Shares(1) 264.1 million Market cap AUD$18.4 million 52 week low/high 5.2¢ - 17¢ Cash (31 Dec 2018) AUD$2.4 million Top 20 shareholders 54% Debt (31 Dec 2018) Nil Note: Enterprise value AUD$

  4. Slide 4: Board

    Board For personal use only Mr. Brian Moller Corey Nolan Chris Hartley John Anderson Paul Jurman LL.B (Hons) B.Com, MMEE, GAICD B.Sc, PhD,GAICD LL.B, B.Com,GDCL,GAICD B.Com, CPA Non-Executive Chairman Managing Director Non-Executive Director Non-Executive Director Company Secretary/CFO Partner with

  5. Slide 5: Strong Team of Technical Consultants

    Strong Team of Technical Consultants For personal use only John Horton Boyd Willis Roland Wells Gideon Steyl BSc (hons) DipCompSc PGCert BAppSc(AppChem), ARMIT Mining, Civil PhD, MIEAust CPEng RPEQ Env, Geostats MAIG FAusIMM CP FAusIMM, CP Project Director MRACI CChem Principal Geologist Project Man

  6. Slide 6: Platina Investment Highlights

    Platina Investment Highlights For personal use only PSP is an advanced, de- Executing a plan to realise risked project. Definitive value from Skaergaard by Feasibility Study completed completing a Scoping Study Executing a plan to get the Low market capitalisation and PSP into production and attract

  7. Slide 7: Significantly Undervalued Versus Peers

    Significantly Undervalued Versus Peers 350 For personal use only • Market cap lagging multi-product (Ni/Co), high capex projects, despite PSP’s low Market Capitalisation ($A million) 300 capex and attractive economics • Attributes low value to Munni Munni and 250 Skaergaard 200 150 100 50 $18 $56 $5

  8. Slide 8: Platina Scandium Project (PSP)

    Platina Scandium Project (PSP) For personal use only The 2018 DFS has confirmed the technical and financial viability of constructing a simple, low-strip ratio, open-cut mining operation and processing facility producing high-purity scandium oxide

  9. Slide 9: Scandium Opportunity

    Scandium Opportunity • Scandium’s PRIMARY USE today is in For personal use only solid fuel cells (Bloom Energy) • DEMAND GROWTH– driven by the next generation of lightweight Sc-Al alloys • Sc-Al alloys provide SUPERIOR strength and weldability • MARKET GROWTH – constrained by LIMITED western world s

  10. Slide 10: Scandium Opportunity

    Scandium Opportunity For personal use only “ Aluminum alloys present the largest of these potential scandium applications. If only a tiny fraction (0.1 %) of the annual aluminum market absorbed scandium in alloy at a 0.5% level, it would represent 350 tonnes in annual global scandium demand. Many ob

  11. Slide 11: Developing a New Source of High-Grade Scandium

    Developing a New Source of High-Grade Scandium For personal use only • Premier mining address - 350 km west of Sydney, New South Wales • Established mining district with highly skilled workforce • Major gold and copper mining operating in the district • Significant tech metals district – Sc, Co, Ni,

  12. Slide 12: 2018 Definitive Feasibility Study Highlights

    2018 Definitive Feasibility Study Highlights For personal use only Simple, low-cost, open-cut mining operation Conventional process plant producing 99.99% scandium oxide Staged production strategy – 20t/yr growing to 40t/yr as market demand increases. Potential to enhance value with by-product credi

  13. Slide 13: DFS Financial Results

    DFS Financial Results For personal use only Start-up capex of Post-Tax NPV (8% real) AU$234m AU$68 million Post-Tax IRR 29% Capital Payback 5.3 years and Ave Annual Revenue AU$77m Stage 2 expansion Ave Annual EBITDA AU$47m capex of Price Forecast US$1,550/kg AU$16 million

  14. Slide 14: Ore Reserves & Resources

    Ore Reserves & Resources JORC Ore Reserve (400 ppm Sc cut-off) For personal use only • Laterite hosted orebody Dry Sc Co Ni Sc2O3 Co Ni rich in scandium and Mt ppm % % t* t t cobalt Proven 3.05 575 0.10 0.13 2,696 2,945 4,054 • One of the highest-grade Probable 0.97 550 0.07 0.08 816 654 767 scandiu

  15. Slide 15: Simple Geology Delivers Low Mining Costs

    Simple Geology Delivers Low Mining Costs For personal use only Deposit Geology Scandium Grade Profile

  16. Slide 16: Proven Processing Methodology

    Proven Processing Methodology • PSP is a laterite ore deposit – 2/3rds of world nickel production For personal use only comes from similar laterites • Conventional High-Pressure Acid Leach (HPAL) process route • Very low in acid consuming elements • 5.4wt bulk sample pilot tested – 99.99% Sc2O3 prod

  17. Slide 17: Platina Scandium Project Process Flow Sheet

    Platina Scandium Project Process Flow Sheet For personal use only * Stage 2 Options * Stage 2 capex

  18. Slide 18: Excellent Access to Infrastructure at Process Site

    Excellent Access to Infrastructure at Process Site • Established industrial site For personal use only chosen for processing facilities • Ore to be trucked 70 km from Red Heart mine to Condobolin processing site • Access to power, water, roads, buildings and labour • Simple permitting – no Mining Le

  19. Slide 19: Process Plant Site Layout

    Process Plant Site Layout For personal use only

  20. Slide 20: Multi, High-Value Product Development Options

    Multi, High-Value Product Development Options For personal use only Scandium Oxide Phase II Expansion to 40t / year Sc2O3 Sc-Al Master Alloys Cobalt JORC Resource (0.08% Co cut-off) Sc Co Pt Ni Nickel and Cobalt Mt ppm % g/t % Measured 4.0 380 0.14 0.49 0.29 Indicated 6.2 350 0.12 0.26 0.20 Inferred

  21. Slide 21: Value Adding Through Master Alloy Manufacturing

    Value Adding Through Master Alloy Manufacturing Traditional Melting Process For personal use only Scandium Oxide Electrolysis furnace furnace Alumina Aluminium metal Master alloy – AlSc (2%) Metalysis Process Scandium Oxide furnace End use alloy Alumina Oxide Metalysis process AlSc master alloy (ten

  22. Slide 22: Sustainability and Community Benefits

    Sustainability and Community Benefits Community For personal use only Environment Tailings neutralised and LOCAL community engagement, consultation placed back in the mine and support Plant utilises existing industrial site JOB creation and infrastructure investment Small project footprint Innovatio

  23. Slide 23: PSP Next Steps

    For personal use only PSP Next Steps

  24. Slide 24: Munni Munni and Skaergaard Projects

    For personal use only Munni Munni and Skaergaard Projects

  25. Slide 25: Munni Munni Joint Venture

    Munni Munni Joint Venture – PGM 30% & Artemis Resources 70% For personal use only Large Au/PGM deposit with conglomerate gold potential • Located in the midst of the Pilbara Fortescue sediments gold rush • 20km from Purdy’s Reward gold discovery • 2,218m of previously drilled Fortescue sediments ide

  26. Slide 26: Skaergaard

    SKAERGAARD One of the world’s largest undeveloped gold and For personal use only palladium resources • Located on the east coast of Greenland • Mineralisation outcrops at surface and extends to at least 1.1 km vertical depth • 35,000m of diamond drilling & A$16m spent • JORC Resource of 203Mt @ 0.88

  27. Slide 27: M&A Strategy

    M&A Strategy Create a portfolio of carefully-chosen projects at various stages - thereby balancing the risk - based on For personal use only the following criteria: Project targeting objectives – identify Focus on investment returns – undervalued turnaround seeking high IRR and bottom opportunities:

  28. Slide 28: Share Price Catalysts

    Share Price Catalysts For personal use only Developments in value-adding Offtake agreements for the Platina Scandium Project   scandium oxide into master alloys Lodgment of the Platina Advancing the Scandium Project Mining License Application   Skaergaard and Munni Munni projects Project finance

  29. Slide 29: Appendix – Scandium

    For personal use only Appendix – Scandium 101

  30. Slide 30: Scandium

    Scandium 101 • Scandium is a soft, silvery For personal use only Scandium is a white metal niche industrial • Often found as a trace metal that can element in deposits of rare alloy to produce earths, titanium, uranium, super light, strong iron and nickel materials which • Primary deposits of can gr

  31. Slide 31: Scandium Sources & Supply

    Scandium Sources & Supply – 15-20t/yr* For personal use only Russia 10% Bauxite Residues Philippines 20% Uranium China 70% Waste TiO2 Pigments Ni/Co *CM Group & PGM 2019 Estimate Laterites

  32. Slide 32: Scandium Supply – Australia is a Game Changer

    Scandium Supply – Australia is a Game Changer Australia (NSW) laterites By-Product Supply For personal use only  High-grade primary resources  Sensitive to primary product demand  First world country  Low-grade and quality resources  World class infrastructure  Non-OECD nations = COMPETITIVE P

  33. Slide 33: Scandium Uses

    Scandium Uses Solid Oxide Fuel Cells For personal use only Aluminium Alloys Lighting

  34. Slide 34: Benefits of Scandium in Aluminium Alloys

    Benefits of Scandium in Aluminium Alloys For personal use only Small additions of Sc2O3 into various aluminium alloys significantly improves its performance, driving significant cost savings for the manufacturer ATTRIBUTE BENEFIT Refines grain structure Increases strength Reduces amount of material

  35. Slide 35: Scandium – Light Alloys to Drive Future Demand

    Scandium – Light Alloys to Drive Future Demand Scandium effect on Yield Strength (Mpa) for various For personal use only aluminium alloys Automotive Architectural Marine Heat Exchangers Aircraft Power Transmission Source: Hydro Aluminium

  36. Slide 36: Scandium Supply-Demand Balance Forecast

    Scandium Supply-Demand Balance Forecast Case study: Airbus Group’s Light Rider For personal use only • EV opportunities not limited to standard passenger vehicles • The Light Rider utilises scandium alloys to reduce weight and improve efficiency • Light personnel transportation, such as bikes & scoo

  37. Slide 37: Scandium Pricing

    Scandium Pricing For personal use only • There is no exchange traded market for scandium • Prices are historically set by long term offtake contracts • According to the USGS, historical scandium oxide prices have ranged from USD$2,000-$4,000/kg • Platina has used a forward price of USD$1,550/kg for

  38. Slide 38: Disclaimer

    Disclaimer Cautionary and Forward-Looking Statements COMPETENT PERSON STATEMENT For personal use only This presentation contains “forward-looking information” which may include, but is not limited The information in this presentation is based on, and fairly represents information and to, statements

  39. Slide 39: Contact

    For personal use only Contact Telephone: +61 7 5580 9094 Email: admin@platinaresources.com.au Level 2, Suite 9, 389 Oxford Street Mt Hawthorn WA 6016 AUSTRALIA www.platinaresources.com.au

Platina Resources — Investor Presentation (January 2019) on 6ix