Ramelius Resources Limited · ASX:RMS
Ramelius Resources — Shareholder Meeting (November 2004)
12 slides from Ramelius Resources's shareholder meeting presentation, Nov 26, 2004
Slide 1: Hilditch project geology: EM anomalies and nickel gossans
2m @ 0.70% Ni, 0.18% Cu 2m @ 1.20% Ni, 0.53% Cu 2m @ 0.67% Ni, 0.08% Cu 2m @ 0.41% Ni, 0.07% Cu Ni gossan EM Conductor (modeled) EM Anomaly RAB drill line RC drill line This slide of the project geology shows firstly, the EM survey anomalies and modelled conductors with the subsequent geochemical dr
Slide 2: Hilditch Project Nickel
HILDITCH PROJECT NICKEL Electro-Magnetic (EM) conductors in the south west of the area. Resolved the geology of this area to identify targets favourable for nickel sulphide deposits. Priority target is line 6,536,000N where Ultramafic units may converge at the modelled position of the EM conductor.
Slide 3: Drill testing of northern gossans
2m @ 0.70% Ni, 0.18% Cu 2m @ 1.20% Ni, 0.53% Cu 2m @ 0.67% Ni, 0.08% Cu 2m @ 0.41% Ni, 0.07% Cu Ni gossan EM Conductor (modeled) EM Anomaly RAB drill line RC drill line The recent drill testing of the northern group of gossans was quite encouraging, identifying two zones of nickel mineralisation, as
Slide 4: Proposed drilling beneath intersections
03 02 01 It is proposed to drill beneath these intersections and also drill the additional untested gossans shortly. 1
Slide 5: Nickel Ironstone Geochemistry
NICKEL IRONSTONE GEOCHEMISTRY Iron Copper Nickel Zinc Platinum Ultramafic (ferruginous) low low medium low low Laterite on Ultramafic high medium high low low Sediment at outcrop high high high high low NICKEL GOSSAN high high high low high HILDITCH % PPM PPM PPM PPB 800 to 2000 to GOSSANS 25 to 55
Slide 6: Current Projects
CURRENT PROJECTS GOLD RESOURCES - BLACK CAT CuZn WATTLE DAM Au (7800PROSPECT) DRILL TARGETS - WATTLE DAM (x3) NORTH WIDGIE (x4) Au HILDITCH ADVANCED EXPLN. - WATTLE DAM NORTH WIDGIE PARKER RANGE GREENFIELDS - LOGANS FIND IDA FAULT Au NICKEL Au Au DRILL TARGET HILDITCH (x2) Ni Au AU ADVANCED EXPLN. P
Slide 7: Black Cat: Gold
BLACK CAT: GOLD Black Cat South Resource 255,000 tonnes @ 2.7 g/t gold ( inferred and indicated) Black Cat North Resource 35,000 tonnes at 2.7 g/t gold (inferred and indicated) Global Resource 290,000 tonnes @ 2.7 g/t gold At the Black Cat, we have delineated a global resource of 290,000 tonnes at 2
Slide 8: Current Projects
CURRENT PROJECTS GOLD RESOURCES - BLACK CAT CuZn WATTLE DAM Au (7800PROSPECT) DRILL TARGETS - WATTLE DAM (x3) NORTH WIDGIE (x4) Au HILDITCH ADVANCED EXPLN. - WATTLE DAM NORTH WIDGIE PARKER RANGE GREENFIELDS - LOGANS FIND IDA FAULT Au NICKEL Au Au DRILL TARGET HILDITCH (x2) Ni Au AU ADVANCED EXPLN. P
Slide 9: Ingebong Hills Project Areas
INGEBONG HILLS PROJECT AREAS COMPRISING THREE PROJECT AREAS IN THE EARAHEEDY BASIN W.A. Ingebong Hills – In-fill soil sampling over delineated Copper/Zinc anomalies Blue Hills – A Greenfield gold project Rhodes- Stream sediment/soil & lag sampling We have just completed in-fill soil sampling over pr
Slide 10: Royalty Interests
ROYALTY INTERESTS •SANDSTONE –Troy Resources N.L. Gold •SIBERIA – Siberia Mining Corporation Ltd. Gold & Nickel Laterite •EUCALYPTUS – GME Resources Ltd. Nickel Laterite •EDJUDINA – Sons of Gwalia Ltd. Gold •BULONG – Yilgarn Gold Ltd. Gold •SPARGOS REWARD- Breakaway Resources Ltd. Gold The Company h
Slide 11: Activity Statement for the Period July 03 to October 04
ACTIVITY STATEMENT FOR THE PERIOD JULY 03 TO OCTOBER 04 RC DRILLING 145 HOLES FOR 9055 METRES AIRCORE DRILLING 47 HOLES FOR 2201 METRES RAB DRILLING 56 HOLES FOR 1156 METRES AUGER SAMPLING 1880 HOLES TEM SURVEY 22.5 LINE KILOMETRES FOR 242 STATIONS ASSAYS >15,000 ASSAYS GOSSAN/ROCK/SOIL/LAG/STREAM S
Slide 12: Outlook
OUTLOOK WATTLE DAM (GOLD) 7800N PROSPECT INITIAL OPTIMISATION STUDY POSITIVE FEASABILITY & TOLL TREATMENT NEGOTIATIONS CONTINUING 8500N PROSPECT 7000N PROSPECT } SCOPING DRILL PROGRAM ON POTENTIAL RESOURCES ADJACENT TO 7800N PROSPECT BLACK CAT (GOLD) POSSIBLE JOINT DEVELOPMENT HILDITCH (NICKEL) DRIL
Ramelius Resources — Shareholder Meeting (November 2004) on 6ix