Eldorado Gold Corporation · TSX:ELD

Eldorado Gold — Technical Presentation (September 2012)

36 slides from Eldorado Gold's technical presentation, September 2012

  1. Slide 1: Kişladağ Gold Mine

    KIŞLADAĞ GOLD MINE September 2012

  2. Slide 2: Location

    —— LOCATION

  3. Slide 3: Project History

    PROJECT HISTORY KIŞLADAĞ MINE • 1997 Identification of Ore Body • 1998-2002 RC and diamond drilling, engineering and metallurgical studies • 1999 Approval of the site selection permit • 2000-2003 Completion of feasibility study • 2003 Approval of Environmental Positive Certificate (ÇED) and Mine Ope

  4. Slide 4: Geology: Regional Geology of Kışladağ Area

    GEOLOGY Regional Geology of Kışladağ Area

  5. Slide 5: Kışladağ Geology 3D View

    ee GEOLOGY 3D VIEW TUPRAG DIATREME B TUPRAG

  6. Slide 6: 687525E Section

    — 687525E SECTION TUPRAG i eat OPEN PIT LIMITS 0.2-0.5 g/t Au TUPRAG

  7. Slide 7: +1 g/t Au Mineralization in Blasthole and Drill Samples

    +1 g/t Au Mineralization in Blasthole and Drill Samples

  8. Slide 8: Exploration: 2012 Exploration Drilling

    EXPLORATION 2012 EXPLORATION DRILLING

  9. Slide 9: Resources and Reserves

    RESOURCES AND RESERVES As of December 31, 2011 Resources Tonnes Grade Au Contained Ounces Category (X1000) (g/t) (X1000) Measured 121,590 0.88 3,436 Indicated 458,270 0.59 8,619 M+I 579,860 0.65 12,055 Inferred 380,760 0.40 4,921 Reserves Tonnes Grade Au Contained Ounces Category (X1000) (g/t) (X100

  10. Slide 10: Mining

    MINING Open Pit Waste Rock Dump Area

  11. Slide 11: Mine equipment and process

    TOPSOIL STOCKPILE 12 x CAT 785 TRUCK +2 X CAT 785 TRUCK MINE PLANNING Support Equipment 1 x Cat 834H Wheel Dozer 2 x Cat D9T Dozers 2 x Cat M16 Graders 3 x Water Trucks HAULING 1 x Cat 330 Rock Breaker DRILLING BLASTING LOADING 1 x ATLAS COPCO 1 x ANFO TRUCK ROC L6 2 X HITACHI EX3600 2 x ATLAS COPCO

  12. Slide 12: W Sector

    W SECTOR 44 5 ond 7°

  13. Slide 13: Geo-Technical Monitoring

    GEO-TECHNICAL MONITORING TUPRAG And visual inspections... “> TUPRAG

  14. Slide 14: Total Pit Production to August 2012

    Total Pit Production to August 2012

  15. Slide 15: Mining: Waste Rock Dump Area

    MINING Waste Rock Dump Area Diversion channels Water Management WR-1  Channels  Pond and Pump Facilities  Grading Oxide Waste Placement  Oxide Waste Placement  Oxide/Sulphide Waste Pond 1  Oxide Capping Pond2 WR-4 Reclamation  Resloping SP-12 Capping with soils WR-2 Water wellsWR-5 WR-3

  16. Slide 16: Crushing & Stacking

    CRUSHING & STACKING • Phase-I design capacity of 740 tph commenced in June 2006 • Phase II expansion to 1480 tph completed in March 2007 • Phase III expansion to 2000 tph completed in March 2010 • Crushing product target size is 80% - 8 mm

  17. Slide 17: Crushing & Stacking: Major Equipment

    CRUSHING & STACKING Major Equipment • 1 x Metso Superior 5065 gyratory crusher • 1 x Metso MP1000 secondary cone crusher • 5 x Metso MP800 tertiary cone crushers • 1 x Schenck double deck banana screen • 6 x Schenck single deck banana screens • Approximately 5 kms of installed conveyor length includ

  18. Slide 18: Crushing & Stacking

    CRUSHING & STACKING • Crushed product is conveyed overland 2.5 kms to the leach pad and stacked using mobile ‘grasshopper’ conveyors in conjunction with a radial stacker. • The leach pad presently consists of 21 x HDPE lined cells which are 85 meters wide x 600-700 meters long. • Stacking is done in

  19. Slide 19: Crushing & Stacking: Process Flowsheet

    CRUSHING & STACKING Process Flowsheet • Direct dumped from Mine into Gyratory Crusher • Crushed through Secondary and Tertiary Crushing Circuit to ~ - 7.5 mm • Transported by Overland Conveyor to Leach Pad • Placed on leach pad by stacker (10 m lifts x 6) • Solution added and gold extracted to ADR P

  20. Slide 20: Leach Pad

    _ LEACH PAD TUPRAG a — TUPRAG

  21. Slide 21: Gold Poured / Year

    GOLD POURED/ YEAR TUPRAG TUPRAG

  22. Slide 22: Kisladag 2012 Production Numbers

    KISLADAG 2012 PRODUCTION NUMBERS YTD YTD PTD August 2012 August 2012 2012 By end of Actual Budget August Tones placed on leach pad 8,618,370 8,424,257 60,197,782 Grade Au gr / ton 1.16 1.04 1.11 Ounce placed on leach pad 321,919 282,461 2,156,340 Recoverable 204,699 180,105 1,463,787 Ounce placed on

  23. Slide 23: Leach Recoveries & Basis

    LEACH RECOVERIES & BASIS • Crushed Oxide Ore Recovery= 80% • Crushed Sulphide Ore Recovery= 62% • ROM Oxide Ore Recovery= 60% • LOM Current Recovery= 65%

  24. Slide 24: ADR Plant & Leach Pad

    ADR PLANT & LEACH PAD s TUPRAG

  25. Slide 25: ADR Plant

    ADR PLANT

  26. Slide 26: Leach Pad Construction

    LEACH PAD CONSTRUCTION TUPRAG

  27. Slide 27: Leach Pad Irrigation

    LEACH PAD IRRIGATION

  28. Slide 28: Cash Cost Distribution (August 2012 YTD Actual)

    CASH COST DISTRIBUTION (August 2012 YTD Actual) Labour, 20% Fuel, 25% Reagents, 20% Electricity, 8% Explosives, 5% Other, 22% (Maintenance, Insurance, Forestry Fee Expenses)

  29. Slide 29: Human Resources & Administration

    Human Resources & Administration as end of August 2012 • Total Headcount : 662 (White Collar:183, Blue Collar: 479) 82% of employees from Uşak Province • Total Headcount (Include Contractor) : 1076 • Average Seniority : 47 Months (3,9 years) • Average Age : 35 • Average Turnover : % 2,4 (2011 Ave.)

  30. Slide 30: Environmental

    ENVIRONMENTAL TUPRAG ¢ Basic environmental monitoring like Noise, HCN, and dust monitoring are carried out on a regular basis both at the mine and in nearby villages. There are currently no issues. « The process is working according to zero discharge princible. ¢ The heap leach area and solution pon

  31. Slide 31: Environmental

    ENVIRONMENTAL . at ¢ The Inspection and Monitoring Committee comes every two weeks to take soil and water samples from the monitoring bores area. ¢ Dokuz Eylul University Geology Engineering Department comes monthly to perform internal water sampling. « Environmental training is continued to be prov

  32. Slide 32: Safety

    SAFETY LTIFR Tuprag (To date): 1,60 LTIFR Contractors (To date): 4,80 H&S Trainings (2012): 7698 Hours 1399 Tuprag Employee 1364 Contractor Employee 2,8 hour/employee Longest LTI-Free (hours) 2,090,753 Longest LTI-Free (days) 566 ONGOING PROJECTS; • Cyanide Code • HSE Software

  33. Slide 33: Community Relations

    COMMUNITY RELATIONS Since its inception, Kişladağ has invested over US$11 million in community development projects. Generally, the investments are focused on health, education, and agricultural improvements. Some past projects include: • Supply of potable water to 13 villages; sewage systems are cu

  34. Slide 34: Wedding Hall Construction of Gumuskol Village

    Wedding Hall Construction of Gumuskol Village

  35. Slide 35: A mobile health clinic bus

    ‘ TUPRAG T.c USAK VALIiL a ie MLIDL

  36. Slide 36: Thanks!

    THANKS!