Roxgold Inc

Roxgold — Technical Presentation (November 2013)

19 slides from Roxgold's technical presentation, November 2013

  1. Slide 1: Preliminary Economic Assessment

    TSX-V: ROG Preliminary Economic Assessment www.roxgold.com

  2. Slide 2: Cautionary Statement

    Cautionary Statement TSX.V:ROG This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the estimation of inferred and indicated mineral resources; (ii) the success of explorati

  3. Slide 3: Roxgold Overview

    Roxgold Overview TSX.V:ROG • Over the last 12 months: o Two resource updates for 55 Zone  143% increase in Indicated Resource o 50 drill holes at the 55 Zone o Exciting regional exploration results o Strengthening our management team, most recently:  Natacha Garoute, Chief Financial Officer  Crai

  4. Slide 4: PEA Economic Highlights

    PEA Economic Highlights TSX.V:ROG • Pre-tax IRR of 59.2% with a 1.2 year payback on initial capital • After-tax IRR of 47.7% with a 1.4 year payback on initial capital • Pre-tax NPV5% of $250 million • After-tax NPV5% of $192 million • Pre-Production Capital of $93.8 million Pre – tax $1,100/oz $1,3

  5. Slide 5: PEA Production Metrics

    PEA Production Metrics TSX.V:ROG • Estimated average annual gold production of 98,300 ounces at a mill feed grade of 11.9 g/t for the first five years • Current study mine life of 10 years • Average metallurgical recoveries of 96% gold PEA baseline metrics Years 1-5 Years 6-10 LOM Average mine produ

  6. Slide 6: Cash Costs (oz)

    Cash Costs (oz) TSX.V:ROG • Average total cash costs of $455/oz (including royalties) for the first 5 years of production • Average total cash costs of $530/oz (including royalties) for Life of Mine (“LOM”) • Estimated all-in sustaining costs, including sustaining capital of $681/oz for first 5 year

  7. Slide 7: Mining Method

    Mining Method TSX.V:ROG www.roxgold.com 7

  8. Slide 8: Pre-Production Capital Costs

    Pre-Production Capital Costs TSX.V:ROG Manageable Capex: Pre-Production Contingency Capital Costs ($ million) Owner’s Costs Underground Mine $37.7 Processing Plant $24.2 Underground Mine Infrastructure $14.4 Infrastructure Owner’s Costs $7.1 Contingency $10.4 Total Pre-Production $93.8 Processing Pl

  9. Slide 9: Cash Cost Summary

    Cash Cost Summary TSX.V:ROG Year 1-5 LOM Years 1-5 ($/tonne) Cash Cost Summary ($/tonne) ($/tonne) Refining Mining $89 $94 Processing $27 $27 G&A G&A $26 $26 Refining $4 $3 Cash operating Cost $146 $150 Mining Processing Royalties $19 $16 Total Cash Costs $165 $166 Sustaining Costs (1) $82 $58 All i

  10. Slide 10: Simplified Flow Sheet

    Simplified Flow Sheet TSX.V:ROG • ROM Pad Crushing Circuit Grinding Circuit Gravity Concentration ICC CIL (Intensive Cyanidation Circuit) (Carbon In Leach) Doré Gold Room Tailings www.roxgold.com 10

  11. Slide 11: Opportunities to Optimize

    Opportunities to Optimize TSX.V:ROG Optimization Opportunity Potential Impact Potential for reduction of waste and lateral Geotechnical drilling and testing development Potential extension of the use of backfill to Optimization of mining method maximize mining recoveries and reduce dilution Optimize

  12. Slide 12: 55 Zone Long Section

    55 Zone Long Section TSX.V:ROG www.roxgold.com 12

  13. Slide 13: Beyond the 55 Zone

    Beyond the 55 Zone TSX.V:ROG www.roxgold.com 13

  14. Slide 14: Bagassi South

    Bagassi South TSX.V:ROG • Recent Highlights: • 41.7 gpt gold over 4.4 m in drill hole YRM-KD-BG-15 • 25.0 gpt gold over 3.8 m in drill hole YRM-KD-BG-11 • 16.0 gpt gold over 1.0 m in drill hole YRM-KD-BG-10 • 141.4 gpt over 2.0 m in drill hole YRM-12-RC-154 www.roxgold.com 14

  15. Slide 15: Moving Forward

    Moving Forward TSX.V:ROG Q3 2013 Commencement of Q4 2013 Q2 2014 Feasibility Study Activities ESIA Completion & Feasibility Study Completion - Consultants engaged (SRK & Mintrex) Submission - Critical path activities commenced www.roxgold.com 15

  16. Slide 16: Appendix

    TSX-V: ROG APPENDIX www.roxgold.com

  17. Slide 17: Resource Estimate

    Resource Estimate TSX.V:ROG Resource Estimate Comparison – 2012 vs. 2013 Resource Update Aug., 2013 Resource Update Mar., 2013 Maiden Estimate Aug., 2012 Grade Grade Grade Cut -off Resource Metal Resource Metal Resource Metal (capped) (capped) (capped) Category Tonnes Au gpt Au Oz Tonnes Au gpt Au O

  18. Slide 18: Mineral Resource Estimate Parameters And Method

    Mineral Resource Estimate Parameters And Method TSX.V:ROG • The block model mineral resources were estimated for the 55 Zone of the Yaramoko Property. The estimate encompasses the main vein and three smaller accessory veins located on the footwall of the main vein. The estimate was completed based o

  19. Slide 19: Mineral Resource Estimate Parameters And Method (cont'd)

    Mineral Resource Estimate Parameters And Method TSX.V:ROG MINERAL RESOURCE ESTIMATE PARAMETERS AND METHOD – Cont’d • Obtaining a valid variogram for a narrow vein, high grade deposit is typically difficult. Due to issues encountered in obtaining a reasonable variogram, inverse distance cube methodol