Transatlantic Mining Corp. · TSXV:TCO
Transatlantic Mining — Investor Presentation (December 2022)
18 slides from Transatlantic Mining's investor presentation, December 2022

Slide 1: Corporate Presentation
CORPORATE PRESENTATION TSX-V: TCO December 2022 TSX-V: TCO T R A N S AT L A N T I C M I N I N G - AN EMERGING COPPER-GOLD EXPLORER & DEVELOPER

Slide 2: Cautionary Statement
CAUTIONARY STATEMENT TSX-V: TCO Disclaimer – Transatlantic Mining Corp (“TRANSATLANTIC” or “The Company”) has prepared this presentation based on the information available to it. No representation or warranty, expressed or implied, is made as to the fairness, accuracy, completeness or correctness of

Slide 3: Corporate Summary
CORPORATE SUMMARY BOARD Shares on Issue 86.6 M CEO Bernie Sostak Geology, 35 yrs experience Warrants on Issue: Options 14.0 M Chairman Ray Parry Finance, 35 yrs experience Diluted shares 100.6 M Independent Michael Hulmes Share Price (CAD) 2 cents Director Engineering, 35 yrs experience $2.0 M Curre

Slide 4: Mine Project Overview
MINE PROJECT OVERVIEW A precious metal and base metal explorer to mine developer with three high grade gold and copper projects: ➢ Purchased 100% Golden Jubilee Gold Mine ➢ Exclusive option on Miller Gold Mine ➢ Ownership of + 80% of the Monitor Copper-Gold-Silver Project in Idaho (USA) TSX-V: TCO 4

Slide 5: Experienced Management Team & Board
EXPERIENCED MANAGEMENT TEAM & BOARD Board and Management Bernie Sostak, Chief Executive Officer (CEO) Commercial Geologist, B.Sc., Diploma Business, MAusIMM, with over 30 years’ experience in the gold mining industry, most recently as General Manager of Business Development and Technical Services fo

Slide 6: Corporate Summary
CORPORATE SUMMARY 1. Mine Ready Gold Projects – Historically mined 2. Systematic Target exploration for Mineral Resource base upgrade to and beyond 500 Koz Au 3. Mine Operational Team experienced in starting and developing operating mines 4. Ability to focus on near term high grade gold and high gra

Slide 7: Miller Mine Gold Project
MILLER MINE GOLD PROJECT Key Attributes Value Drivers Processing To add Can utilise toll treating➢and/or amenable to gravity recovery at site Private Land/US Lease Farm-in in to ownership on multiple private patented lease claims Extralateral rights on Private Land Mineralisation Technically tested

Slide 8: Miller Mine – Long Section
MILLER MINE – LONG SECTION Sample # 1 TSX-V: TCO 8 T R A N S AT L A N T I C M I N I N G - AN EMERGING COPPER-GOLD EXPLORER & DEVELOPER

Slide 9: Miller Mine – Gold Mine – Lease to Purchase
MILLER MINE – GOLD MINE –LEASE TO PURCHASE Miller Mine ➢ Exclusive Option lease to 100 % purchase** ➢ “Sample on Vein” Lower Adit Level with gold and grade over 100m of strike and open at 9.57g/t Au and 34.7g/t Ag (1.2m) *Sample 1 : 15.5 g/t Au 26 g/t Ag ➢ Mined historic recovered grade at 7.9oz Au

Slide 10: Golden Jubilee Mine
GOLDEN JUBILEE MINE Key Attributes Value Drivers Processing Utilise toll treating and/or amenable gravity recovery at site US Lease 100% Ownership of the mine Mineralisation Technically tested with high grade Gold mined and drilling NI 43-101* (2013) collated with fissure vein on limestone contact M

Slide 11: Golden Jubilee Mine – Gold Mine 100%
GOLDEN JUBILEE MINE – GOLD MINE 100% Golden Jubilee Mine ➢ Purchased 100 % of Mineral Claims ** ➢ Previous owner mined and processed an exploration level for 10,000 tons at 9.0g/t Au through nearby toll treating facility *Golden Jubilee 2014 Mine Development ➢ 37 drillholes in shallow drill database

Slide 12: Monitor Copper Gold Project
MONITOR COPPER GOLD PROJECT ➢ Already earned-in for 80% of Monitor Project JV in Coeur D’Alene (Silver Valley), Idaho ➢ Comprises 20 unpatented claims and 402 acres. Includes four old mines: Monitor, Richmond, St. Lawrence and Copper Age ➢ Two mineralized structures, Monitor and Richmond Veins; Moni

Slide 13: Project Monitor Copper-Gold Project
PROJECT MONITOR COPPER-GOLD PROJECT Key Attributes Value Drivers ➢ To add Processing Facility Can toll treat in the future and/or direct ship Private Land/US Lease Own over 80% of Monitor St Lawrence 25 year lease with 25 year option on private land Mineralisation Technically tested drilling and ope

Slide 14: Monitor Copper Gold Project
MONITOR COPPER GOLD PROJECT Monitor average copper grade mined prior to 1920 was ~15% Cu with highest reported grade of 30.5% Cu ➢ + Associated metals accompanying Cu: Au 7.2 g/t, Ag 22.5 g/t Richmond average copper grade produced was 7.5% Cu prior to 1920 ➢ + Associated metals accompanying Cu: Au 3

Slide 15: Monitor Project - Exploration Upside
MONITOR PROJECT - EXPLORATION UPSIDE BIG ELK PROSPECT ➢ Sulphide deposit at surface, including a high-grade, Cu sample of 30.8% within 1 metre of sub surface ➢ Known veins with extensions from adits recently accessed ➢ High grade Cu along 800+ m strike on two veins - Monitor and Richmond as major li

Slide 16: Schedule: Cashflow
SCHEDULE : 2021 Purchase Golden Jubilee Commence Permit -Drilling March-April-Completed Q4 -Completed 2022 2022 2022/23 2023+ Drilling NI 43-101 Pre Mine production Cashflow Geophysics Updates estimates TSX-V: TCO 16 T R A N S AT L A N T I C M I N I N G - AN EMERGING COPPER-GOLD EXPLORER & DEVELOPER

Slide 17: Why Transatlantic? Converting Projects into Mines
WHY TRANSATLANTIC? CONVERTING PROJECTS INTO MINES Veins assessed and have high grade gold with historic mined grade of 7.9 oz /ton Au. Open Miller Mine - Gold Project access to commence bulk sample with + 90 % gravity gold recovery Last mine developed and processed in 2014 for 10,000 tonnes at 9 g/t

Slide 18: Contact
Contact Bernie Sostak (CEO) +1 (604) 630-7296 +61(0) 439 904 044 bsostak@transatlanticminingcorp.com TSX-V: TCO 18 T R A N S AT L A N T I C M I N I N G - AN EMERGING COPPER-GOLD EXPLORER & DEVELOPER
Source: Internet Archive copy of transatlanticminingcorp.com
More decks from Transatlantic Mining Corp.
Investor Presentation (July 2026)26 slides · July 2026
Investor Presentation (January 2026)22 slides · January 2026
Investor Presentation (September 2025)20 slides · September 2025
Investor Presentation (February 2025)17 slides · February 2025
Fact Sheet (January 2025)2 slides · January 2025
Investor Presentation (January 2025)17 slides · January 2025