Eldorado Gold Corporation · TSX:ELD

Eldorado Gold — Investor Presentation (February 2025)

58 slides from Eldorado Gold's investor presentation, Feb 21, 2025

  1. Slide 1: Investor Presentation

    Investor Presentation February 2025 Millionth ounce gold pour at the Lamaque Complex, Canada

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement Definitions and Photos Capitalized terms used in this presentation but not otherwise defined herein have the meanings ascribed thereto in the Management’s Discussion and Analysis dated February 20, 2025 of Eldorado Gold Corporation for the three and twelve months ended Dece

  3. Slide 3: Non-IFRS Measures

    Non-IFRS Measures Certain non-IFRS financial measures and ratios are included in this presentation, including total cash costs ($/oz sold), all-in sustaining costs ("AISC") ($/oz sold), adjusted net earnings, adjusted net earnings per share, adjusted EBITDA, cash flow from operating activities befor

  4. Slide 4: Diversified Portfolio of Long-Life, High-Quality Assets

    Diversified Portfolio of Long-Life, High-Quality Assets Kassandra Mines, GREECE Diverse Asset Portfolio ⚫ Olympias ⚫ Skouries ⚫ Stratoni • Operations in Türkiye, Greece and Canada ⚫ Olympias, GREECE 2024 Au Production 69,532 oz • 11.9 Moz of P&P gold reserves(2) 2024 AISC/oz sold(1) $1,562 HEAD OFFI

  5. Slide 5: Strong Investment Rationale

    Strong Investment Rationale Eldorado is driving investor returns by focusing on four key areas Pipeline of Strategic Focused Attractive Financial Growth Projects on Sustainability Valuation Position SKOURIES • Implementing our Sustainability • Advancing high-quality Greek • Cash and cash equivalents

  6. Slide 6: Upcoming Value Drivers

    Upcoming Value Drivers Focused on upcoming value drivers CORPORATE • Updated multi-year guidance demonstrates 33% growth on gold production over three-year period, based on 2024 production TÜRKIYE • Kışladağ: Engineering study to evaluate the effects of material type variability on the life of mine

  7. Slide 7: 2025 Guidance and 3-Year Growth Profile

    2025 Guidance and 3-Year Growth Profile Growing production with significant upside from Skouries Au & Cu production 2025 3-YEAR PRODUCTION OUTLOOK(3): GOLD INCREASING 43% FROM 2023 TO 2027 GOLD PRODUCTION: 460,000 – 500,000 oz COPPER PRODUCTION STARTING IN 2026 800 ~43% Growth 80 TOTAL CASH COSTS(1)

  8. Slide 8: Attractive Valuation

    Attractive Valuation Advancing high-quality Greek assets creates re-rating potential Consensus P/NAV Consensus EV/2025E EBITDA(1) Source: FactSet; data as of February 20, 2025 Source: FactSet; data as of February 20, 2025 (1) These are non-IFRS financial measures or ratios. See Slide 2 ‘Non-IFRS Mea

  9. Slide 9: Strong Financial Position

    Strong Financial Position Focus on maintaining solid financial position which provides flexibility to unlock value across our business Liquidity Position(1,2) (as of December 31, 2024) TOTAL LIQUIDITY: $1.1 billion Cash balance + availability on senior secured credit facility(1) 239 CASH & CASH EQUI

  10. Slide 10: Skouries

    Skouries High-grade gold-copper porphyry deposit that is a key driver of Eldorado’s growth story OVERVIEW ADVANCING SKOURIES Location Halkidiki Peninsula, Greece • €680 M financing package (including additional cost overrun facility) secured for the development of Deposit type Gold-copper porphyry S

  11. Slide 11: Skouries Project Update: Capital Cost & Schedule

    Skouries Project Update: Capital Cost & Schedule Commercial production expected mid-2026; Initial 20-year mine life with robust economics Project Capital Variance(3) Accelerated Operational Capital(4) $86 $21 $1,063 CAPITAL COST ESTIMATE: $1.06 B $36 ACCELERATED MINING COST ESTIMATE: $154 M $920 $15

  12. Slide 12: Skouries: Recent Achievements

    Skouries: Recent Achievements Revised project capital cost of $1.06 B with first production expected in Q1 2026 and commercial production in mid-2026 Q4 2024 HIGHLIGHTS(1) • Current phase 60% complete Detailed engineering and procurement: substantially complete. Focus on finalizing engineering to su

  13. Slide 13: Skouries: Positioned to Deliver

    Skouries: Positioned to Deliver Construction project capital(1) invested since restart of construction to December 31, 2024: $509.6 million 2025: $400 to $450 million capital expected, in addition to $80 to $100 million in accelerated operational capital Q4 2024 HIGHLIGHTS (CONTINUED) • Q4 2024 inve

  14. Slide 14: Skouries: Filtered Tailings Plant & Crusher Building

    Skouries: Filtered Tailings Plant & Crusher Building Filtered Tailings Facility Area: Commencement of structural steel construction in February 2025. Primary Crusher: Continued to advance the foundation construction, with retaining walls and excavations completed. Top: Filter plant facility overview

  15. Slide 15: Skouries: Advancing Construction

    Skouries: Advancing Construction Aerial Site View September 2024 February 2025 14

  16. Slide 16: Skouries: Fully Funded with Strategic Project Financing Partners

    Skouries: Fully Funded with Strategic Project Financing Partners Maximizing shareholder value with well-aligned strategic partnerships Key Features of Term Facility PROJECT IS • Non-recourse to Eldorado; secured by Hellas Gold FULLY FUNDED • Blended interest rate of approximately 6%(1) • 10-year ter

  17. Slide 17: Skouries: Land Reclamation in Parallel with Mining Activity

    Skouries: Land Reclamation in Parallel with Mining Activity Bringing the mine progressively back to as close to its original condition as early as possible TAILINGS MANAGEMENT SUPPORTS PROGRESSIVE RECLAMATION • Tailings are a by-product of the extraction process • At Skouries – we are utilizing dry-

  18. Slide 18: Lamaque Complex

    Lamaque Complex Underground gold mine located in Val-d’Or, Québec. The high-grade orogenic Triangle deposit feeds the current mine life. OVERVIEW EXPLORATION UPSIDE Location Québec, Canada • Ormaque and Triangle deposits remain open at depth Ownership 100% • Large resource base and exploration upsid

  19. Slide 19: Lamaque Complex

    Lamaque Complex Production in 2024 increased 11% over 2023; and demonstrated a 19% increase in H2 2024 vs. H1 2024 driven by enhanced capacity Q4 2024 HIGHLIGHTS • Q4 gold production of 63,742 oz at total cash costs(1) of $615/oz sold • Production in Q4 2024 driven by: Higher throughput rates and hi

  20. Slide 20: Lamaque Complex: Advancing Ormaque

    Lamaque Complex: Advancing Ormaque First round drilling Maintenance bay 19

  21. Slide 21: Kışladağ

    Kışladağ Kışladağ is a low-grade, bulk-tonnage, open pit operation that uses heap leaching for gold recovery OVERVIEW ENHANCING EFFICIENCIES Location Uşak Province, Türkiye • Engineering study underway focused on the geometallurgical understanding of future mining Ownership 100% phases and optimizin

  22. Slide 22: Kışladağ

    Kışladağ Production in 2024 increased 12% over 2023; and demonstrated a 28% increase in H2 2024 vs. H1 2024 driven by enhanced capacity Q4 2024 HIGHLIGHTS • Q4 gold production of 56,483 oz at total cash costs(1) of $978/oz sold • Production in Q4 2024 benefited from: North ADR facility commencing op

  23. Slide 23: Kışladağ: Improving irrigation engineering

    Kışladağ: Improving irrigation engineering Sub-cell collection system Deep ripping system 22

  24. Slide 24: Kışladağ: Completed North-ADR Plant

    Kışladağ: Completed North-ADR Plant North-ADR plant First gold pour in late October 2024 Top: Aerial view of North-ADR plant and infrastructure; Bottom: Interior of North-ADR plant. 23

  25. Slide 25: Efemçukuru

    Efemçukuru High-grade underground operation located in Izmir Province in western Türkiye OVERVIEW MAINTAIN CONSISTENT PRODUCTION Location İzmir Province, Türkiye • Efemçukuru focused on continuous improvement Ownership 100% • Efemçukuru met annual production guidance for 10th consecutive year, since

  26. Slide 26: Efemçukuru

    Efemçukuru 10th Consecutive year of achieving production guidance Q4 2024 HIGHLIGHTS • Q4 gold production of 19,451 oz at total cash costs(1) of $1,376/oz sold • Costs during the quarter and the year impacted by: Rising costs of labour and increased royalties due to average higher gold prices • FY 2

  27. Slide 27: Olympias

    Olympias Carbonate replacement style deposit with high gold grades and an orebody that will allow for mining rates up to 1 million tonnes per year OVERVIEW FOCUS ON GROWTH Location Halkidiki Peninsula, Greece • Continue to deliver Olympias productivity Ownership 100% improvements and expand processi

  28. Slide 28: Olympias

    Olympias Production in 2024 increased 4% over 2023, driven by higher average grade Q4 2024 HIGHLIGHTS • Q4 gold production of 15,992 oz at total cash costs(1) of $1,463/oz sold • Production in Q4 2024 impacted by: Lower throughput and gold grades, as well as plant equipment downtime during the quart

  29. Slide 29: Environmental Rehabilitation at Olympias

    Environmental Rehabilitation at Olympias Eldorado restored over 32 acres of an area that was used by a previous operator to improperly dispose of tailings containing arsenopyrite. Before restoration work (2012) After restoration work (2021) RESTORATION OF OLD OLYMPIAS ARSENOPYRITE CONCENTRATE STORAG

  30. Slide 30: Perama Hill

    Perama Hill Low-cost epithermal gold-silver project with transformative growth potential OVERVIEW SUPPORTS THE GROWTH PIPELINE Location Thrace, Greece • Next mine expected to be developed after Skouries Ownership 100% • Exploration potential in the Thrace region Mine type Open pit supports opportuni

  31. Slide 31: Perama Hill

    Perama Hill Upcoming catalysts • Social & Environmental Due Diligence – Ongoing (2025) • Project optimization and studies are ongoing to prepare permitting documentation Future developments • EIA submission • EIA Approval & Presidential Decree (PD) issued • Submission of full Social & Environmental

  32. Slide 32: Climate Change Strategy – Our GHG Emissions Mitigation Target

    Climate Change Strategy – Our GHG Emissions Mitigation Target Mitigate GHG emissions by an amount equal to 30% of our 2020 baseline by 2030, on a “business-as-usual” basis(1) Journey to Our GHG Emissions Mitigation Target Achievement Pathway Decarbonization • Leverages Eldorado’s low emissions inten

  33. Slide 33: ESG Recognized as a Key Priority

    ESG Recognized as a Key Priority Eldorado ESG performance as a mid-cap miner includes recognition of strong sustainability management practices ESG Rating Performance Recognition for Responsible Mining • MAC-TSM Level AAA on Tailings Management at all operating tailings facilities: Lamaque ELD Score

  34. Slide 34: Appendix

    x a Z uu Oo. a. <

  35. Slide 35: Eldorado Gold Executive Management Team

    Eldorado Gold Executive Management Team Experienced Operators Supported by a Committed and Proven Leadership Team Executive Leadership George Burns Paul Ferneyhough Frank Herbert Simon Hille Louw Smith President & CEO EVP & CFO EVP, GC, and Chief EVP, Technical Services EVP, Development, Compliance

  36. Slide 36: Eldorado Share Price Performance

    Eldorado Share Price Performance Relative Share Price Performance Capital Structure Common Shares 204,946,024 outstanding(1) Share purchase options(1,2) 2,555,163 Performance share units(1) 974,302 Closing share price(3) $16.67 (NYSE: EGO) Market Capitalization(3) $3.0 B 52-week Share Price $9.72 -

  37. Slide 37: Operations Update

    Operations Update Strong operational performance: delivered 7% annual production growth over 2023 and 24% increase over Q3 2024 GOLD PRICE DRIVING MARGIN EXPANSION AND STRONG 24% Record CASH FLOW. in production Gold production at Generated ~$342.0 million of free cash flow(1) from operations, exclud

  38. Slide 38: 2025 Production & Cost Guidance

    2025 Production & Cost Guidance Kışladağ, Türkiye Lamaque Complex, Canada 2025 GOLD PRODUCTION BY MINE(3) Type Open pit Type Underground Gold Production 160 – 170 Koz Gold Production 170 – 180 Koz 14% Total Cash Costs(1,2) $1,020 – $1,120 Total Cash Costs(1,2) $790 – $890 AISC(1,2) $1,200 – $1,300 A

  39. Slide 39: 3-Year Operating Outlook

    3-Year Operating Outlook Gold production (midpoint) increasing 33% over 3 years driven by growth projects Gold Production (000’ oz) 2024A(1) 2025E 2026E(2) 2027E Lamaque Complex 197(1) 170 – 180 180 – 190 175 – 185 Kışladağ 174 160 – 170 135 – 145 165 – 175 Efemçukuru 80 70 – 80 75 – 85 70 – 80 Olym

  40. Slide 40: Hedge Portfolio

    Hedge Portfolio Managing gold and copper downside price exposure over the next 3 years Skouries Project Finance Related Hedges Gold Hedges - Zero Cost Collar • Limited forward sales for delivery on June 30, 2026, as follows: • Mitigate volatility risk of the gold price during a period of elevated in

  41. Slide 41: Sustainability Framework and SIMS

    Sustainability Framework and SIMS SIMS minimum performance standards operationalize our Framework’s four key commitments to ESG-related topics Healthy Environments Now Safe, Inclusive and Responsibly Produced & The Future Engaged & Prosperous Innovative Operations Products Communities • Implementing

  42. Slide 42: Inclusive Diversity

    Inclusive Diversity Committed to fostering safe and inclusive workplaces that value diversity, personal growth and innovation​ Global Initiatives Operating Sites • Updated Equity, Diversity & Inclusion Strategy created with input GREECE from the global employee workforce • 2024 Sustainability Bronze

  43. Slide 43: World Gold Council: Gold 247

    World Gold Council: Gold 247 What is Gold 247 Gold Why Now? The World Gold Council’s strategic vision for 247TM Gold has a systemic role in the world’s transforming the global gold market and economy – as an investment, a reserve elevating gold into the mainstream of asset, a source of employment an

  44. Slide 44: Why Gold & Where do we see Gold Price Moving

    Why Gold & Where do we see Gold Price Moving Now is the time for generalists. Long-Term Store of Value: ▪ Gold has been used as a store of value for thousands of years. Relative Performance over 20-years (2004 – 2024) 700% ▪ During geopolitical turmoil or financial crises, investors often flock to g

  45. Slide 45: 2025 Full Year Gold Outlook

    2025 Full Year Gold Outlook: central banks and ETF investors likely to drive demand with economic uncertainty supporting gold’s role as a risk hedge Gold Demand Hit New Record in 2024 Central Banks – Buyers for 15 Consecutive Years Quarterly gold demand in volume, tonnes, and value, US$bn(1) Annual

  46. Slide 46: Financial Results

    Financial Results ($ millions unless otherwise noted) Q4 2024 2024 2023 2022 2021 Operating Metrics Realized Gold Price ($/oz) 2,625 2,405 1,944 1,787 1,781 Gold produced (oz) 155,668 520,293 485,139 453,916 475,850 Total cash costs(1) ($/oz sold) 944 940 850 878 715 All-in sustaining costs(1) ($/oz

  47. Slide 47: Historical Operating Results – Lamaque Complex

    Historical Operating Results – Lamaque Complex FY 2024(2) FY 2023 Q4 2024(2) Q3 2024 Q2 2024 Q1 2024 Q4 2023 Operating Data Tonnes milled 943,509 838,419 256,628 232,165 220,157 234,559 248,246 Head grade (g/t Au) 6.74 6.76 8.05 6.03 6.95 5.81 7.36 Average recovery rate 96.1% 97.1% 95.8% 95.8% 96.3%

  48. Slide 48: Historical Operating Results – Kışladağ

    Historical Operating Results – Kışladağ FY 2024 FY 2023 Q4 2024 Q3 2024 Q2 2024 Q1 2024 Q4 2023 Operating Data Tonnes placed on pad 13,123,978 13,220,164 3,434,938 3,511,662 3,415,604 2,761,774 3,434,911 Head grade (g/t Au) 0.81 0.78 0.70 0.86 0.92 0.77 0.78 Gold ounces produced 174,080 154,849 56,4

  49. Slide 49: Historical Operating Results – Efemçukuru

    Historical Operating Results – Efemçukuru FY 2024 FY 2023 Q4 2024 Q3 2024 Q2 2024 Q1 2024 Q4 2023 Operating Data Tonnes milled 541,782 547,089 138,837 131,374 134,540 137,032 137,987 Head grade (g/t Au) 5.39 5.64 5.32 5.37 5.92 4.96 5.81 Average recovery rate (to concentrate) 91.9% 93.0% 91.4% 92.5%

  50. Slide 50: Historical Operating Results – Olympias

    Historical Operating Results – Olympias FY 2024 FY 2023 Q4 2024 Q3 2024 Q2 2024 Q1 2024 Q4 2023 Operating Data Tonnes milled 446,732 454,122 109,186 124,374 94,575 118,597 114,895 Head grade (g/t Au) 8.54 8.23 8.05 9.16 8.11 8.67 8.70 Gold average recovery rate (to concentrate) 82.3% 83.8% 81.1% 82.

  51. Slide 51: Mineral Reserves (Gold, Silver) as of September 30, 2024

    Mineral Reserves (Gold, Silver) as of September 30, 2024 Project Proven Mineral Reserves Probable Mineral Reserves Total Proven and Probable Tonnes Au Contained Au Tonnes Au Contained Au Tonnes Au Contained Au Gold (x1000) g/t ounces (x1000) (x1000) g/t ounces (x1000) (x1000) g/t ounces (x1000) Efem

  52. Slide 52: Mineral Reserves (Copper, Lead, Zinc) as of September 30, 2024

    Mineral Reserves (Copper, Lead, Zinc) as of September 30, 2024 Project Proven Mineral Reserves Probable Mineral Reserves Total Proven and Probable Tonnes Cu Contained Cu Tonnes Cu Contained Cu Tonnes Cu Contained Cu Copper (x1000) % tonnes (x1000) (x1000) % tonnes (x1000) (x1000) % tonnes (x1000) Sk

  53. Slide 53: Mineral Resources (Gold, Silver) as of September 30, 2024

    Mineral Resources (Gold, Silver) as of September 30, 2024(1) Project Measured Resources Indicated Resources Total Measured and Indicated Inferred Resources Tonnes Au Contained Au Tonnes Au Contained Au Tonnes Au Contained Au Tonnes Au Contained Au Gold (x1000) g/t ounces (x1000) (x1000) g/t ounces (

  54. Slide 54: Mineral Resources (Copper, Lead, Zinc) as of September 30, 2024

    Mineral Resources (Copper, Lead, Zinc) as of September 30, 2024 Project Measured Resources Indicated Resources Total Measured and Indicated Inferred Resources Contained Contained Contained Contained Tonnes Cu Cu tonnes Tonnes Cu Cu tonnes Tonnes Cu Cu tonnes Tonnes Cu Cu tonnes Copper (x1000) % (x10

  55. Slide 55: Notes on Mineral Resources and Reserves

    Notes on Mineral Resources and Reserves General Mineral Reserves and Mineral Resources are as of September 30, 2024 The Mineral Reserves and Mineral Resources were classified using logic consistent with the CIM Definition Standards for Mineral Resources & Mineral Reserves (2014) incorporated, by ref

  56. Slide 56: Notes on Mineral Reserves (cont'd)

    Notes on Mineral Reserves (cont’d) Mineral Reserve Notes Eldorado reports Mineral Reserves in accordance with CIM Definition Standards. Mineral Reserves for the operating sites (Efemcukuru, Kisladag, Olympias, and within the Lamaque Complex – Ormaque and Triangle) were determined using a long-term g

  57. Slide 57: Notes on Mineral Resources

    Notes on Mineral Resources Mineral Resource Notes: Eldorado reports Mineral Resources in accordance with CIM Definition Standards. All Mineral Resources are assessed for reasonable prospects for eventual economic extraction (RPEEE). The Resource cut-off grades or values (e.g. gold equivalent) are de

  58. Slide 58: Thank You

    Thank You TSX: ELD NYSE: EGO eldoradogold.com

Eldorado Gold — Investor Presentation (February 2025) on 6ix