Citigold Corporation Limited · ASX:CTO

Citigold — Non-Deal Roadshow (June 2005)

14 slides from Citigold's roadshow presentation, Jun 17, 2005

  1. Slide 1: Citigold Corporation Announcement: Broker Presentation

    Citigold Corporation ANNOUNCEMENT 17 June 2005 Broker Presentation For the information of the market, attached is a copy of the broker presentation that will be used during the Australian ‘roadshow’ being conducted by Mr Chris Towsey, Chief Operating Officer, Australia. The purpose of the presentati

  2. Slide 2: Sleeping Giant Awakens: The Company

    Sleeping Giant Awakens The Company 10 Moz • ASX Code ‘CTO’, listed since 1993 2nd Largest All Australian • Paid share capital $73.5m • Shares on issue - 458.5 m Gold Resource • Options, majority @ 15c, mature Dec 06, 13m ($1.9m) • Convert Notes (40c) mature March 2007, pay 12%, 4.2m Australia Roadsh

  3. Slide 3: The Company and The Asset: Location

    The Company The Asset Growth period approaching Charters Towers City – 10,000 people & infrastructure Two of the three ingredients to build a large and profitable gold mine business are in place and the third is close to completion – ; Own 10 Moz high grade gold deposit ; Professional management in

  4. Slide 4: 10 Million Ounce Inferred Mineral Resource

    The Asset The Asset 10 million ounce drilled Inferred Mineral Resource Areas bounding the 10 million ounces Drill Collar Locations 7784000 AREA TONNES GRADE OUNCES 7782000 g/t Au Brilliant Sunburst 7780000 Central Area CENTRAL 10 million 14 g/t 4 million CV 2 AMG Northing Towers Hill 7778000 Ruby So

  5. Slide 5: Historical Mining Matches New Data; Ore Sorting

    The Asset The Asset 40 years mining of 6.6 million ozs matches new data Dilution removed by ore sorting • At the historical mining cut- cut-off of 9 m.g/t Au, the average of Citigold’ Citigold’s Feed screened 272 significant drill intersections is 27 m.g/t Au, the same as the in- in- and washed situ

  6. Slide 6: Drilled Structures and Historic Mines

    The Asset The Asset Drilled structures – View of drill traces Sunburst area Yellow – 180 km of drives & produced 6.6 m/oz of gold Sunburst and Queen Citigold’s Decline ay Portal ilw Ra 4 kilometres 17 19 The Asset The Asset Future drilling expected to increase the gold resource Historic mines re-ope

  7. Slide 7: Proven Operating Costs and Trial Mining

    The Asset The Asset Proven operating costs & Citigold owned equipment Trial mining gold from ‘new’ high-grade gold reefs Washington Open Pit and Underground • 21 23 The Asset The Asset Surface infrastructure established and owned Areas mined by Citigold – 80 metres underground • • 22 24 11 12

  8. Slide 8: Gold Extraction Plant and Mine Schedule

    The Asset The Asset High grade gold reefs proven Gold extraction plant CIL owned and operated 9 Reef location proven by drilling to • 1,300 metres depth 9 Continuity of reef and grade proven by historical and current mining 9 Trial mining was a 38,000 oz bulk sample 9 Grades determined from drill gr

  9. Slide 9: Funding for Development; Warrior Construction

    Development Plan Development Plan Funding for development of the gold mines Warrior gold mine – Construction started • Warrior funded to date from normal annual share issues, approx. A$2 million invested. • Planned annual cash surplus of $7 million from Warrior. • Sunburst funded by $35 million capi

  10. Slide 10: Warrior Gold Resource Drilling and Sections

    Development Plan Development Plan Warrior gold resource – drilling Cross Section Warrior gold resource Cross section Looking West Blue < 1g/t Green 1-4 g/t Yellow 4-10 g/t Red >10 g/t Warrior long section showing Resource blocks, looking South 33 35 Development Plan Development Plan Warrior mine dec

  11. Slide 11: Planned Mining Method and Sunburst Mine

    Development Plan Development Plan Schematic of planned mining method Sunburst gold resource – No 2 mine Mining method Longhole open stoping 37 39 Development Plan Development Plan Sunburst Gold Mine – Mine 2 Sunburst mine high grade ore at 450 metres depth N 38 40 19 20

  12. Slide 12: Operating Cash Costs and Project Risks

    Development Plan Management Operating cash costs to international standards Project risks are carefully removed or controlled • Gold price A$561(US$434.75 @ 0.7751 as at 21 April 2005) • NO political & social risk – Australia ranks No 1 (lowest risk). • NO land risk – Mining Leases granted and exten

  13. Slide 13: Share Value Upside; JORC Statement

    Share Value Upside JORC Statement Assets foundation is on gold and future cash flow The following statements apply in respect of the Market capitalisation potential upside may be information in this report that relates to Exploration $50/oz of gold as a high grade and profitable Results, Mineral Res

  14. Slide 14: Contact Details

    Contact Details • Chris Towsey – Chief Operating Officer ctowsey@citigold.com • Garry Foord – General Manager Engineering gfoord@citigold.com • Corporate office – 19 Lang Pde, Pde, Milton (Brisbane) Queensland • Telephone 07 3870 8000 • Facsimile 07 3870 8111 • Web site www.citigold.com 49 50 25

Citigold — Non-Deal Roadshow (June 2005) on 6ix