G11 Resources Limited · ASX:G11

G11 Resources — Odin Metals — Investor Presentation (February 2019)

12 slides from G11 Resources's investor presentation, February 2019

  1. Slide 1: Sturgeon Lake Zinc-Copper Project

    Sturgeon Lake Zinc-Copper Project February 2019 www.odinmetals.com.au 1

  2. Slide 2: Competent Person and Cautionary Statement

    Competent Person Cautionary Statement This presentation includes information relating to Exploration Results prepared and first disclosed under the JORC Code 2012. Forward Looking Statements This presentation may contain certain forward looking statements and projections regarding estimated resource

  3. Slide 3: Investment Highlights

    Investment Highlights  Odin signs Earn-in Option Agreement with Glencore Canada Corporation  Significant increase in exposure at the advanced Zinc-Copper Sturgeon Lake project area from 22km2 to over 200km2  Sturgeon Lake hosts the prolific Mattabi mineralised trend (20km strike), host to multipl

  4. Slide 4: Company Overview

    Company Overview Capital Structure Board and Management Simon Mottram, CEO Share Price 15 cents  Geologist with over 25 years’ experience predominantly in base and precious metals.  Held both executive and senior management positions with several successful mining companies both in Australia and o

  5. Slide 5: Glencore Earn in Option

    Glencore Earn in Option  Odin has the option to acquire a 50% interest in the Glencore Sturgeon Lake Properties by spending CAD$6.67m on exploration activities over a three-year period o CAD$2m in year 1 o CAD$2m in year 2 and o CAD$2.67m in year 3  Upon satisfaction of expenditure requirements an

  6. Slide 6: Sturgeon Lake Overview

    Sturgeon Lake Overview  Brownfields and advanced exploration opportunity in a prospective belt for volcanogenic massive sulphide (“VMS”) style mineralization  250km NW of Thunder Bay, Ontario  Multiple drill-ready targets, near-term resource potential including the Abitibi Zone along strike of th

  7. Slide 7: Sturgeon Lake Project History

    Sturgeon Lake Project History  The majority of historical production occurring from 1970 through 1991  Total aggregate past production total of 19.8 Mt @ 8.5% Zn, 1.06% Cu, 0.91% Pb, and Metric Ore Grades Deposit Tonnes 120g/t Ag extracted from the largest five Summary (millions) deposits in the d

  8. Slide 8: Key Prospects

    Key Prospects Abitibi Zone  Near term resource potential  Open zone for drill testing along strike of the historic Mattabi Mine  Potentially a down-plunge extension of the high-grade F Zone Deposit.  Several hundred metres of open potential for strike extent and remains open down-dip, with drill

  9. Slide 9: Key Prospects

    Key Prospects Group 51 Area Wide spaced historical drilling with strong down-hole EM anomalies in early stage drilling, not followed up. Space between historical drilling exceeds that required for a Mattabi Deposit size Group 15 Area MegaTEM airborne survey (following previous exploration results by

  10. Slide 10: Exploration Program 2019

    Exploration Program 2019 3 Year Earn in Option for CAD$6.67m Year 1: $2.0M PHASE I: HTEM Regional Airborne Geophysical Survey PHASE II: Diamond drilling on first priority HTEM targets (2,500m) PHASE III: Abitibi Zone Extension and Swamp Lake (3,900 m) Year 2: $2.0M PHASE IV: Diamond Drilling follow-

  11. Slide 11: Proposed HTEM Survey

    Proposed HTEM Survey Proposed 2019 HTEM Survey Glencore 2010 1,700 L km VTEM Survey Silver Dollard Outfitter www.odinmetals.com.au 11

  12. Slide 12: Exploration Program 2019

    Exploration Program 2019 Silver Dollard Outfitter www.odinmetals.com.au 12

Odin Metals — Investor Presentation (February 2019) on 6ix