InZinc Mining Ltd. · TSXV:IZN

InZinc Mining — Investor Presentation (June 2015)

25 slides from InZinc Mining's investor presentation, June 2015

  1. Slide 1: Emerging Low-cost Mid-tier Zinc Producer

    Slide 1: Emerging Low-cost Mid-tier Zinc Producer

    Emerging Low-cost Mid-tier Zinc Producer June 2015

  2. Slide 2: Cautionary Statement

    Slide 2: Cautionary Statement

    Cautionary Statement This presentation contains certain statements that may be deemed "forward-looking statements". All statements in this presentation, other than statements of historical fact, that address future production, reserve potential, exploration drilling, exploitation activities and even

  3. Slide 3: InZinc Mining: Emerging Low-Cost Mid-Tier Zinc Producer

    Slide 3: InZinc Mining: Emerging Low-Cost Mid-Tier Zinc Producer

    InZinc Mining Emerging Low-Cost Mid-Tier Zinc Producer ƒ 100% interest in the West Desert zinc-iron-copper project in Utah o One of the best located and larger undeveloped zinc resources ƒ Excellent results from updated West Desert PEA (April 2014) o One of best returning zinc projects within peer g

  4. Slide 4: Capital Structure

    Slide 4: Capital Structure

    InZinc Mining Capital Structure Issued and Outstanding 72,205,419 Warrants 4,866,819 Options 2,650,000 Fully Diluted 79,722,238 Institutional Shareholders 17.6% Management/Board (fully diluted) 17.8% Working Capital C$1.05 million Share Price (6-8-15) C$0.11 Market Cap C$7.9 million TSX-V: IZN 4

  5. Slide 5: Board Focused on Delivering Value

    Slide 5: Board Focused on Delivering Value

    InZinc Mining Ltd. Board Focused on Delivering Value Chris Staargaard, M.Sc. (Geochemistry), P.Geo Kerry Curtis, B.Sc. (Geology), P.Geo. President, CEO, Director Chairman, Director Chair of Compensation Committee 35+ years worldwide exploration experience with 30 years experience – base and precious

  6. Slide 6: Excellent Jurisdiction – Surrounded by Infrastructure

    Slide 6: Excellent Jurisdiction – Surrounded by Infrastructure

    West Desert Project Excellent Jurisdiction – Surrounded by Infrastructure ƒ Utah business and mining friendly ƒ Mine permitting straightforward and efficient ƒ Easy logistics ƒ Road access and grid power ƒ Multiple transcontinental rail networks within 90 km ƒ Interstate gas pipeline within 90 km ƒ

  7. Slide 7: The Right Address

    Slide 7: The Right Address

    West Desert Project The Right Address ƒ 160 km southwest of Salt Lake City, Utah NEVADA UTAH ƒ Paved road to within 30 km – all weather gravel roads to property ƒ Railheads within 90 km BINGHAM COPPER ƒ Grid power at site ƒ Two major power plants within 90 km WEST ƒ Natural gas pipeline within 90 km

  8. Slide 8: Low Project Execution Risk

    Slide 8: Low Project Execution Risk

    West Desert Project Low Project Execution Risk ƒ No major towns or communities in close proximity to the project ƒ Resources are almost entirely contained on private land ƒ InZinc owns water rights – two water wells on property ƒ All exploration permits, bonds in place to continue work WEST DESERT D

  9. Slide 9: 2014 Independent PEA Highlights

    Slide 9: 2014 Independent PEA Highlights

    West Desert Project 2014 Independent PEA Highlights ƒ 1.6 billion lbs LOM zinc production ƒ Important by-products include iron, copper, indium ƒ After tax economics: o 23% IRR o $258M NPV8 o $377M NPV5 ƒ 14.8 year mine life ƒ 3.7 year payback ƒ $247M initial CAPEX Note 1: 100% equity basis; US$; zin

  10. Slide 10: Large Underground Resource

    Slide 10: Large Underground Resource

    West Desert Project Large Underground Resource Tonnage ZnEq Zn Cu In Magnetite Zn Cu Magnetite (Mt) (%) (%) (%) (g/t) (%) (Mlbs) (Mlbs) (Mt) Indicated 13.0 6.22 2.16 0.23 33 48 691.3 65.1 6.2 Inferred 46.0 5.57 1.76 0.22 24 48 1,781.0 224.6 22.0 * April 2014: stated at a US$ 50 GMV (Gross Metal Valu

  11. Slide 11: Amenable to Low Cost, Bulk Underground Mining

    Slide 11: Amenable to Low Cost, Bulk Underground Mining

    West Desert Project Amenable to Low Cost, Bulk Underground Mining ƒ Initial mining rate of 5,000 tpd W E ƒ Increases to 6,500 tpd in year 3 ƒ Longhole open stoping ƒ Access via two ramps ƒ Conveyor haulage is cost 100 effective and flexible oxide resource 200 ƒ Resource open for expansion 300 400 50

  12. Slide 12: Simple Conventional Processing Produces Three Clean Concentrates

    Slide 12: Simple Conventional Processing Produces Three Clean Concentrates

    West Desert Project Simple Conventional Processing Produces Three Clean Concentrates U/G Crushing 50% of milled tonnage 97% recovery Low Intensity Iron 63% Fe Surface SAG Mill Magnetic Separation Concentrate v low SiO2, P2O5 base metals retained in tails: grades double 74% recovery Copper 29% Cu Cop

  13. Slide 13: Multiple Projected Payable Metals

    Slide 13: Multiple Projected Payable Metals

    West Desert Project Multiple Projected Payable Metals Revenue Distribution at PEA Metal Prices Zinc Copper Commodity Units Annual LOM 42% 15% Zinc M lbs 107.9 1,594.3 Magnetite Mt 1.0 14.5 (iron) Indium Copper M lbs 9.9 146.7 12% Indium t 38.3 566.1 Silver Gold K oz 7.6 113.0 1% Gold Magnetite Silve

  14. Slide 14: Cash Costs (C1) in the Lowest 5% of Global Production

    Slide 14: Cash Costs (C1) in the Lowest 5% of Global Production

    West Desert Project Cash Costs (C1) in the Lowest 5% of Global Production C1 Cost ($/lb payable Zn) West Desert (after Brook Hunt / Wood Mackenzie, Lundin Mining, Jan 2014) C1 - Direct Cash Cost ($0.04)/lb C2 - Production Cost $0.45/lb C3 - Fully Allocated Cost $0.50/lb TSX-V: IZN 14

  15. Slide 15: Well Leveraged to Zinc Price

    Slide 15: Well Leveraged to Zinc Price

    West Desert Project Well Leveraged to Zinc Price Pre-Tax (M $) After-Tax (M $) Zinc Payback Price NPV (5%) NPV (8%) IRR NPV (5%) NPV (8%) IRR (Years) ($/lb) 0.80 312 208 19% 238 146 17% 4.9 1.00 507 357 27% 377 258 23% 3.7 1.20 693 506 34% 507 363 29% 3.0 Note: Base case in bold; US$ TSX-V: IZN 15

  16. Slide 16: Significant Upside Potential

    Slide 16: Significant Upside Potential

    West Desert Project Significant Upside Potential ƒ Expand higher grade, zinc-rich resource in three directions ƒ Add recoverable zinc and copper at depth - within the current magnetite resource ƒ Discover additional mineralized zones ƒ Optimize transportation costs for iron concentrate (magnetite) ƒ

  17. Slide 17: Open for Expansion and New Discoveries

    Slide 17: Open for Expansion and New Discoveries

    West Desert Project Open for Expansion and New Discoveries W E 0m surface Historic 2.7M oz OPEN 100 silver mine 200 300 OPEN 400 500 600 700m depth 3.05m intercept @ 7.65% Zn, 3.5% Cu, 0.17% MoS2, 28 g/t Ag zone of multiple molybdenum intercepts TSX-V: IZN 17

  18. Slide 18: Next Steps: Continuing to Build Value

    Slide 18: Next Steps: Continuing to Build Value

    West Desert Project Next Steps: Continuing to Build Value ƒ Pre-feasibility study to commence with drilling o Phase 1 infill drilling to upgrade resource classification o Phase 2 infill and expansion drilling ƒ Additional objectives o Baseline studies for permitting o Build on favourable initial met

  19. Slide 19: Proposed Drilling – Plan View

    Slide 19: Proposed Drilling – Plan View

    West Desert Project Proposed Drilling – Plan View Resource Footprint Phase 1 drilling Historic Silver Phase 2 drilling Mine 100m Existing drill holes TSX-V: IZN 19

  20. Slide 20: Why Invest in Zinc?

    Slide 20: Why Invest in Zinc?

    Why Invest in Zinc? A Key Industrial Metal brass semis and By First Use By End Use castings transport 17% 20% die‐casting galvanizing alloys 50% construction 17% 51% infra structure semi‐ 16% manufact. Global Market products 6% oxides and industrial 16 machinery consumer other chemicals 7% products

  21. Slide 21: Zinc Inventories Decreasing: Unlike Copper, Nickel

    Slide 21: Zinc Inventories Decreasing: Unlike Copper, Nickel

    Zinc Inventories Decreasing: Unlike Copper, Nickel *Bloomberg data from May 21, 2015 Scotia Daily Mining Scoop TSX-V: IZN 21

  22. Slide 22: Glencore: Zinc Supply Will Not Meet Demand

    Slide 22: Glencore: Zinc Supply Will Not Meet Demand

    Glencore: Zinc Supply Will Not Meet Demand *Glencore presentation (Oct 2014) TSX-V: IZN 22

  23. Slide 23: Teck: Zinc Supply Will Not Meet Demand

    Slide 23: Teck: Zinc Supply Will Not Meet Demand

    Teck: Zinc Supply Will Not Meet Demand *Teck presentation (Mar 2015) TSX-V: IZN 23

  24. Slide 24: InZinc Mining: An Emerging Low-Cost Mid-Tier Zinc Producer

    Slide 24: InZinc Mining: An Emerging Low-Cost Mid-Tier Zinc Producer

    InZinc Mining An Emerging Low-Cost Mid-Tier Zinc Producer ƒ Mid-tier zinc production potential ƒ Important byproduct iron, copper and indium ƒ Very favorable location resulting in lower capital requirement and straightforward permitting ƒ One of the lowest cost potential producers ƒ One of the highe

  25. Slide 25: InZinc Mining Ltd. Contact

    Slide 25: InZinc Mining Ltd. Contact

    InZinc Mining Ltd. 912 – 510 West Hastings Street Vancouver, BC Canada V6B 1L8 (604) 687-7211 For further information contact: C.F. (Chris) Staargaard, President & CEO Joyce Musial, Corporate Communications (604) 317-2728 www.inzincmining.com

Source: Internet Archive copy of inzincmining.com