Fathom Nickel, Inc. · CSE:FNI
Fathom Nickel — Investor Presentation (June 2025)
19 slides from Fathom Nickel's investor presentation, Jun 20, 2025
Slide 1: Securing North American Supply of Critical Minerals
Securing North American Supply of Critical Minerals Emerging High-Grade Magmatic Nickel Sulphide District Saskatchewan, Canada CSE:FNI FSE:6Q5 OTC:FNICF Corporate Presentation June 2025 | 1
Slide 2: Notice To Reader
Notice To Reader Certain information set forth in this presentation contains “forward-looking Although forward-looking statements contained in this presentation are based information”, including “future oriented financial information” and “financial upon what management of Fathom believes are reason
Slide 3: Company Milestones
Company Milestones Private company 2015 – 2021: • Secured a stranded asset - the Rottenstone property in 2015 • Expanded asset to 90,000+ha and renamed Rottenstone property to Albert Lake property prior to IPO Went public in May 2021: • Goal of IPO was to raise C$3-$5,000,000 • IPO closed on C$11,00
Slide 4: Company Snapshot
Company Snapshot Trading well below true value Cash Balance of ~ $1,000,000 Share Structure and Capitalization (as June 9, 2025) Share Price – 12 months (as of June 9, 2025) Shares % $0.08 Management & Insiders 12,898,991 6.4% $0.07 Institutional (est.) 44,316,275 22.1% Retail (est.) 143,681,425 71.
Slide 5: Geological Setting of Fathom Projects
Geological Setting of Fathom Projects Located in the Trans Hudson Orogen, host to numerous world-class mining camps Deposit Project Owner Commodity Status Type Ni-Cu-Co+3E Past Producer Albert Lake + Au Exploration Gochager Fathom Magmatic Ni-Cu-Co±3E Historic Resources 1 Lake Nickel Sulphide + VMS
Slide 6: Fathom Nickel Portfolio
Fathom Nickel Portfolio Three Very Prospective Ni-Cu-Co±PGE Projects: Albert Lake • 134,000+ hectares • 100% ownership Southend Albert Lake • Historic Rottenstone Mine (1965-1969) • Limited production: grade 3.28% Ni, 1.83% Cu, 9.63 g/t 3E¹ Friesen • South Albert Lake new gold discovery Lake Gochage
Slide 7: Why Fathom – Why Saskatchewan?
Why Fathom – Why Saskatchewan? Discovery Size Ni Cu Co 3E Takeover Deposit Name Location Discovery Co. Takeover Co. Date (M tonne) wt % wt% wt % (g/t) Price Tag Namew Lake MN Canada Hudbay Outukumpu Mined out 1984 2.57 1.79 0.63 1.20 Voisey's Bay NL Canada Diamond Resources INCO (Vale) 1996 31.70 2.
Slide 8: Gochager Lake Project
Gochager Lake Project CSE:FNI FSE:6Q5 OTC:FNICF Corporate Presentation June 2025 | 8
Slide 9: Long-Section Gochager Lake Deposit
Recent Exploration Highlights Long-Section Gochager Lake Deposit From To Length Ni Cu Co Drillhole (m) (m) (m)* wt % wt% wt % GL23003 93.50 200.70 107.20 0.91 0.23 0.07 125.80 181.25 55.45 1.54 0.39 0.12 Including 125.80 147.65 21.85 2.26 0.50 0.17 GL23004 243.75 275.60 31.85 0.51 0.19 0.04 includin
Slide 10: Key Exploration Criteria
Key Exploration Criteria Nickel sulphide deposits occur in clusters controlled by multiple intrusions along a common structural trend • Gochager Lake deposit occurs within an interpreted regional shear / corridor / conduit • Gochager Lake deposit host intrusions continue along strike a minimum 600m
Slide 11: Q-3 2025 Exploration
Q-3 2025 Exploration Nickel sulphide deposits occur in clusters controlled by multiple intrusions along a common structural trend • The Gochager Lake deposit occurs within an interpreted regional shear / structural corridor / conduit 2025 Exploration: • Extend the Gochager Lake deposit Gochager Lake
Slide 12: Exploration Model
Exploration Model Clustering of Magmatic Nickel Sulphide Ore Deposits At Gochager Lake deposit: Chaotic multi-phase intrusions Disseminated Ni-Cu-Co sulphides Massive-vein Ni-Cu-Co sulphides Semi-massive to massive, breccia Ni-Cu-Co sulphides Voisey’s Bay The Ovoid Massive Ni-Cu-Co Sulphide
Slide 13: Rottenstone Mine Operation
Rottenstone Mine Operation circa 1965 Albert Lake Project CSE:FNI FSE:6Q5 OTC:FNICF Corporate Presentation June 2025 | 13
Slide 14: Albert Lake Project Overview
Albert Lake Project Overview Rottenstone Deposit / Mine (MET772134): • Assay result: 4.08% Ni, 1.38% Cu, 0.09% Co, 10.50 Bay-Island Trend g/t PGE+ Au* • Metallurgical test suggests excellent metal recovery AL22052 >90% base metal >80% precious metals** • MET772134 bulk sample Ni-tenor = 10.07% Rotte
Slide 15: Albert Lake South – Gold Zone
Albert Lake South – Gold Zone • Ramp Metals Inc. 2024 Ranger-001 discovery drillhole – 73.55 g/t Au / 7.5m • Fathom August 2024; 144 outcrop grab samples collected along strike of Ranger-001 in a structurally complex area as defined by Gradient MAG survey flown by Fathom in 2022 • New Gold Zone disc
Slide 16: Albert Lake South – Gold Zone
Albert Lake South – Gold Zone Fathom Nickel Tenure Holdings Proposed VTEM survey, shown on Total Magnetic Intensity (TMI) Proposed VTEM Plus airborne survey in South Albert Lake property area: • Survey approximately 1,100 – 1,600 flight line-kilometers • Proposed survey area underlain by complex geo
Slide 17: Project Milestones – 2025 Outlook
Project Milestones – 2025 Outlook Gochager Lake Project: 2025 Exploration – Corporate Outlook: • Expanded historic Gochager Lake deposit significantly to depth and along strike • Company continues to engage with senior North American focused Ni-Cu-Co+PGE producers • Defined geologic controls and rec
Slide 18: Management and Board
Management and Board Ian Fraser Doug Porter CEO, VP Exploration, Director President, CFO, Director • Co-founder of Fathom Nickel, 35+ Years of • Senior financial and accounting executive mineral exploration, managing and executing with specific emphasis in resource company exploration programs in Ca
Slide 19: Ian Fraser
Ian Fraser CEO, VP Exploration, Director ifraser@fathomnickel.com +1(403) 650-9760 Doug Porter President, CFO, Director dporter@fathomnickel.com +1(403) 870-4349 CSE:FNI FSE:6Q5 OTC:FNICF Corporate Presentation June 2025 | 19