  1. Slide 1: Collector Test Study Environmental Impact Statement

    Slide 1: Collector Test Study Environmental Impact Statement

    Collector Test Study Environmental Impact Statement REVISIONS Submitted to: International Seabed Authority Testing of polymetallic nodule collector system components in the NORI-D contract area, The Secretary-General Clarion-Clipperton Zone, Pacific Ocean 14 - 20 Port Royal Street Kingston, Jamaica

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    2 Forward looking statements. Forward Looking Statements Certain statements made in this press release are not historical facts but are forward-looking statements for purposes of the safe harbor provisions under The Private Securities Litigation Reform Act of 1995. Forward-looking statements general

  3. Slide 3: Objectives

    Slide 3: Objectives

    3 Objectives. Collector Test • Demonstrate the technical feasibility of the polymetallic nodule collection system. • Assess the technical performance of the prototype collection system and incorporate learnings into the design of the full-scale commercial system. • Assist in predicting potential env

  4. Slide 4: Timeline

    Slide 4: Timeline

    4 Timeline. July Aug Oct Nov March July 2021 2021 2021 2021 2022 2022 ▪ 29 July: Submission of NORI ▪ 3 August: Secretary General ▪ 5 October: Nauru hosted an ▪ 19 November: Public ▪ 1 March: NORI submitted a ▪ LTC response anticipated EIS to the International provided feedback on the introductory s

  5. Slide 5: Submissions

    Slide 5: Submissions

    5 Submissions. 1. Deep Sea Mining Campaign (DSMC) 2. Mining Watch Canada (MWC) 3. Government of the United Kingdom (UKGov) 4. The Pew Charitable Trusts (PEW) 5. United States Government (USGov) 6. Submissions from individuals via website portal 7. Federal Republic of Germany (FRG) 8. Deep-Ocean Stew

  6. Slide 6: Themes

    Slide 6: Themes

    6 Themes. Across all submissions a total of 632 comments were received relating to the following 21 common themes: 1. Alternatives analysis 2. Baseline data 3. Climate change 4. Collector test operations 5. Cumulative and transboundary impacts 6. Ecotoxicology 7. EIA process 8. Light impacts 9. Miti

  7. Slide 7: Valid

    Slide 7: Valid

    7 Valid. Examples of comments that NORI cannot respond to in the context of the Collector Test EIS • “In light of the already-substantial research around deep sea disturbances due to mechanical strain, the proposed NORI-D collector test to be conducted within the Clarion- Clipperton Zone (CCZ), unde

  8. Slide 8: Relevant

    Slide 8: Relevant

    8 Relevant. Examples of comments that are not relevant in the context of the Collector Test EIS as they have previously been addressed or are outside of the scope for the Collector Test EIS. • Para (38c) Requirement: Running gear (skis, wheels, caterpillars, Archimedes screws, bearing plates, water

  9. Slide 9: Novel

    Slide 9: Novel

    9 Novel. Examples of multiple iterations of the same comment or question….. • “The conclusion indicates that there are no significant impacts, despite there being a complete absence of baseline biological data. It might be a reasonable assumption for a small test, but it is contrary to all the ISA g

  10. Slide 10: Criteria: Valid. Relevant. Novel.

    Slide 10: Criteria: Valid. Relevant. Novel.

    10 Criteria: Valid. Relevant. Novel. Of the 632 comments received a large proportion were duplicates, statements of opinion, or not relevant in the context of the Collector Test EIS. As such comments that were deemed to be valid, relevant and novel (VRN) could be responded to; totalling 132 comments

  11. Slide 11: Key revisions to the EIS

    Slide 11: Key revisions to the EIS

    11 Key revisions to the EIS. 1. Expansion of Chapter 5 Physicochemical baseline 60 → 84 pp 2. Expansion of Chapter 6 – Biological (benthic and pelagic) Baseline 26 → 162 pp 3. Re-run of sedimentation models to include greater granularity of sedimentation footprint 4. Addition of an alternatives anal

  12. Slide 12: Record-setting nine offshore environmental campaigns totaling 283 days at sea

    Slide 12: Record-setting nine offshore environmental campaigns totaling 283 days at sea

    12 Record-setting nine offshore environmental campaigns totaling 283 days at sea. # Campaign ID Start Date End Date Focus Deployment of three oceanographic moorings. Water sampling and hydrographic 1 Campaign 4A 2/10/19 23/10/19 profiling. 2 Ocean Infinity 23/05/20 30/05/20 25K seabed images collect

  13. Slide 13: Record-setting nine offshore environmental campaigns totaling 283 days at sea

    Slide 13: Record-setting nine offshore environmental campaigns totaling 283 days at sea

    13 Record-setting nine offshore environmental campaigns totaling 283 days at sea. Campaign 4A, 4D, 4E (71 days at sea) Campaign 5A & 5D (90 days at sea) Deployment and servicing of the oceanographic Collected seasonal data on benthic biology, sediment moorings deployed at NORI-D. And oceanographic g

  14. Slide 14: Expansion of Chapter Physicochemical baseline

    Slide 14: Expansion of Chapter Physicochemical baseline

    14 Expansion of Chapter 5 Physicochemical baseline 60 → 84 pp.

  15. Slide 15: Expansion of Chapter Megafauna

    Slide 15: Expansion of Chapter Megafauna

    15 Expansion of Chapter 6 Megafauna. Biological baseline 26 → 162 pp. 15

  16. Slide 16: Expansion of Chapter Macrofauna

    Slide 16: Expansion of Chapter Macrofauna

    16 Expansion of Chapter 6 Macrofauna. Biological baseline 26 → 162 pp. 16

  17. Slide 17: Expansion of Chapter Meiofauna

    Slide 17: Expansion of Chapter Meiofauna

    17 Expansion of Chapter 6 Meiofauna. Biological baseline 26 → 162 pp.

  18. Slide 18: Expansion of Chapter Meiofauna

    Slide 18: Expansion of Chapter Meiofauna

    18 Expansion of Chapter 6 Meiofauna. Biological baseline 26 → 162 pp. 18

  19. Slide 19: Expansion of Chapter Gelatinous zooplankton

    Slide 19: Expansion of Chapter Gelatinous zooplankton

    19 Expansion of Chapter 6 Gelatinous zooplankton. Biological baseline 26 → 162 pp. 19

  20. Slide 20: Expansion of Chapter Micronekton

    Slide 20: Expansion of Chapter Micronekton

    20 Expansion of Chapter 6 Micronekton. Biological baseline 26 → 162 pp. 20

  21. Slide 21: Re-run of sedimentation models

    Slide 21: Re-run of sedimentation models

    21 Re-run of sedimentation models to include greater granularity of sedimentation footprint.

  22. Slide 22: Addition of an alternatives analysis for the collector test format

    Slide 22: Addition of an alternatives analysis for the collector test format

    22 Addition of an alternatives analysis of key decisions relating to the format of the collector test.

  23. Slide 23: GHG budget calculated and commitment added to offset emissions

    Slide 23: GHG budget calculated and commitment added to offset emissions

    23 GHG budget has been calculated and a commitment added to offset emissions.

  24. Slide 24: Surface processing of the nodule slurry added to project description

    Slide 24: Surface processing of the nodule slurry added to project description

    24 Description of the surface processing of the nodule slurry has been added to the project description.

  25. Slide 25: Noise assessment included

    Slide 25: Noise assessment included

    25 Noise assessment has been included as a precursor to the development of a noise model for operations.

  26. Slide 26: Environmental Monitoring Program. Designation of two additional control sites

    Slide 26: Environmental Monitoring Program. Designation of two additional control sites

    26 Environmental Monitoring Program. Designation of two additional control sites. The monitoring of the collector test will be the first data collection effort for the long term Environmental Monitoring Program on the NORI- D site and details will be incorporated in to the EMMP that will be submitte

  27. Slide 27: Next steps

    Slide 27: Next steps

    Next steps. Stakeholder Engagement ▪ NORI appreciates the comprehensive stakeholder consultation process developed and implemented by Nauru ▪ NORI appreciates the time and effort stakeholders took to review and comment on the EIS and was pleased with the level of engagement. ▪ NORI believes that the

  28. Slide 28: Thank you

    Slide 28: Thank you

    28 Thank you.