Slide 1: Hera Project CCC – November 2018
HERA PROJECT CCC – November 2018 1
Slide 2: WHS Incidents – Jul to Sep
Hera Mine WHS Incidents – Jul 18 to Sep 18 • 4 Aug 18 – Medically Treated Injury – Operated required stitches after receiving a laceration to forehead from their tool slipping while opening ANFO bag 2
Slide 3: Project Approval 10_0191 – Modification 5 (MOD5)
Hera Mine Project Approval 10_0191 – Modification 5 (MOD5) UPDATED SCOPE OF MOD5 • MOD5 is to include a request to modify the Project Approval 10_0191 as follows: • Increase the rate of transportation of concentrate from Hera Mine to the Hermidale rail siding from 50 000 t per calendar year to 60 00
Slide 4: MOD5 – Consultation to Date
Hera Mine Project Approval 10_0191 – Modification 5 (MOD5) CONSULTATION TO DATE • A Briefing Paper was submitted to Department of Planning and Environment on 24 Aug 2018; • The Briefing Paper was submitted to the Independent Chairperson of the CCC on 24 Aug 2018 for distribution to members of the CC
Slide 5: Progress of MOD5
Hera Mine Project Approval 10_0191 – Modification 5 (MOD5) Progress of MOD5 • Ecologists from AREA have attended site to conduct the biodiversity offsetting requirements associated with the proposed external decant pond. A draft report is expected in the next couple of weeks; • GHD are currently wor
Slide 6: Complaints – Jul to Sep
Hera Mine WHS Incidents – Jul 18 to Sep 18 • No complaints received this quarter. 6
Slide 7: Environmental Monitoring – Jul to Sep
Hera Mine Environmental Monitoring – Jul 18 to Sep 18 7
Slide 8: Blast Vibration (Day Time Period)
Hera Mine Environmental Monitoring – Jul 18 to Sep 18 Jul to Sep 18 - Blast Vibration (Day Time Period) 12 10 8 mm/s 6 4 2 0 Vibration Limit (95%) Limit (max.) Day time period = 7am to 6pm Monday to Saturday 8
Slide 9: Blast Vibration (Evening Time Period)
Hera Mine Environmental Monitoring – Jul 18 to Sep 18 Jul to Sep 18 - Blast Vibration (Evening Time Period) 12 10 8 mm/s 6 4 2 0 Vibration Limit (95%) Limit (max.) Evening time period = 6pm to 10pm Monday to Saturday 9
Slide 10: Blast Vibration (Night Time Period)
Hera Mine Environmental Monitoring – Jul 18 to Sep 18 Jul to Sep 18 - Blast Vibration (Night Time Period) 1.2 1 0.8 mm/s 0.6 0.4 0.2 0 Vibration Limit (max.) Night time period = 10pm to 7am Monday to Saturday, all day Sunday and Public Holidays 10
Slide 11: High Volume Air Sampler
Hera Mine Environmental Monitoring – Jul 18 to Sep 18 Jul to Sep 18 - High Volume Air Sampler 300 250 200 µg/m³ 150 100 50 0 PM-10 TSP PM-10 Limit 18 Jul 2018 – Dust incident most likely caused by background dust conditions. Dust conditions in NSW highest of record for the month of July 11
Slide 12: Dust Deposition Gauges
Hera Mine Environmental Monitoring – Jul 18 to Sep 18 Dust Deposition Gauges 12 10 8 g/m²/month 6 4 2 0 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 DDG1 DDG2 DDG1 Annual Average DDG2 Annual Average Annual Limit 12
Slide 13: Tailings Storage Facility & Process Water Dam Discharges
Hera Mine Environmental Monitoring – Jul 18 to Sep 18 Tailings Storage Facility & Process Water Dam Discharges PWD & TSF WAD Cyanide - Jul to Sep 18 35 30 25 20 mg/L 15 10 5 0 TSF PWD TSF Limit (max.) PWD Limit (90%) PWD Limit (Max.) • Incident: • 25 and 26 Aug 2018: • No daily sample was taken from
Slide 14: Standing Water Levels
Hera Mine Environmental Monitoring – Apr 18 to Jun 18 Standing Water Levels - Jul to Sep 18 80 70 60 metres below ground level 50 40 30 20 10 0 Jul-18 Aug-18 Sep-18 WB4 WB15 WB18 WB20 WB4 Limit WB15 Limit WB18 Limit WB20 Limit WB18 standing water level is currently under investigation to determine i
Slide 15: Concentrate Truck Movements
Hera Mine Environmental Monitoring – Apr 18 to Jun 18 Concentrate Truck Movements Concentrate Truck Movements - Jul to Sep 18 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0 Jul-18 Aug-18 Sep-18 Avgerage number trucks per Day Limit 15
Slide 16: Exploration Update
Hera Exploration Update ** aurelia aia = METAS, 16
Slide 17: Gravity, Hera-Nymagee Area
Gravity, Hera-Nymagee Area • Strong positive gravity anomalies at Hera and Nymagee • Probably related to broad alteration systems around mineralisation • Strong NNW-SSE trend over 15km strike • Anomalies to the south have coincident geochemical responses • Ground between Hera and Nymagee poorly expl
Slide 18: Near Mine Targets
Hera Surface Exploration NEAR MINE TARGETS Beyond Gravity High Hammerhead Kershaws Hebe Central Hera-Juno Pb in Soils > 80ppm 1 Pb in Soils > 160ppm Hebe East 3,4 2 Hebe Mag & Hebe Hebe Southeast Central Deeps Zeus Au in Soils > 10ppb Hebe South 500m 6 500m 5 Athena Enyo 18
Slide 19: Juno Target – Does Hera Repeat at Depth?
Hera Surface Exploration JUNO TARGET – DOES HERA REPEAT AT DEPTH? v.v.1 v.v.2 Juno Target 400m m VIEW LS Looking West 19 19
Slide 20: Near Mine Targets
Hera Surface Exploration 20 NEAR MINE TARGETS Zeus Gravity Peak Anomaly Anomaly Hebe Mag Inversion Hera Gravity Anomaly Perseverance Gravity Inversion > Gravity GravityInversion Inversion>> 0.4mgal Anomaly 0.6mgal 0.8mgalAnomaly Anomaly 20
Slide 21: Hebe Prospect - Plan
Hebe Prospect - Plan 21
Slide 22: September 2018 Drilling – Results to Date
Dominion Prospect SEPTEMBER 2018 DRILLING – RESULTS TO DATE Hole ID Intercept Cu % Pb % Zn % Au g/t Ag g/t From (m) Min. Style • Colours represent type of ore; orange DRC009 DRC010 7 3 0.2 0.2 1.9 1.1 0.2 0.2 0.23 0.09 2 7 17 27 Supergene Supergene for oxidised, light blue for transitional, DRC011 5
Slide 23: September 2018 Drilling - Results
Dominion Prospect SEPTEMBER 2018 DRILLING - RESULTS 23
Slide 24: September 2018 Drilling - Results
Dominion Prospect SEPTEMBER 2018 DRILLING - RESULTS 24
Slide 25: XRF Soil Geochemistry - Lead
Dominion Prospect XRF SOIL GEOCHEMISTRY - LEAD 25
Slide 26: XRF Soil Geochemistry - Copper
Dominion Prospect XRF SOIL GEOCHEMISTRY - COPPER 26
Slide 27: Nymagee Mine – Metallurgy Drill Program Update
27 Nymagee Mine – Metallurgy Drill Program Update N N Cu:Pb+Zn 27
Slide 28: Nymagee Mine – Metallurgy Drill Program Update
28 Nymagee Mine – Metallurgy Drill Program Update N N Cu:Pb+n 28
Slide 29: Nymagee Mine – Metallurgy Drill Results
29 Nymagee Mine – Metallurgy Drill Results N N Cu:Pbn 29
Slide 30: Hera Processing Performance
Hera Processing Performance 30
Slide 31: Production – Mill Monthly Throughput
0 10,000 15,000 20,000 25,000 30,000 40,000 45,000 50,000 35,000 5,000 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Production Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Mill Monthly Throughput Jun-17 Jul-17 Aug-17 Sep-17 Oct-1
Slide 32: Historical Gold Performance
Historical Gold Performance N 32
Slide 33: Historical Base Metals Performance
Historical Base Metals Performance N 33
Slide 34: FY19 Schedule Production
285 Level Description | [ Description) Color | <July 2018 J Jul 2018 7" Aug 2018 Sep 2018 Oct 2018 Nov 2018 Dec 2018 Jan 2019 Feb 2019 Mar 2018 Apr 2019 May 2019 || Jun 2019 | puly 2019 quituad METALS Led, aurelia METALS Led. 255 Level 385 Level 460 Level 485 Level 585 Level, 615 Level 640-Level 285
Slide 35: Life of Mine – Four Years
a ¥ 3 auretia 285 Level 285 Level 385 Level & 485 Level Description <FYE 2019, FYE 2019 FYE 2020 FYE 2021 FYE 2022 FYE 2023 aurelia Ky METALS Led, 640-Level 35