Kennady Diamonds Inc

Kennady Diamonds — Investor Presentation (September 2012)

20 slides from Kennady Diamonds's investor presentation, September 2012

  1. Slide 1: Kennady Diamonds

  2. Slide 2: Background

    Background  100% controlled brownfields diamond exploration project in the heart of Canada’s diamond fields  Spun out of Mountain Province Diamonds Thirteen federal leases and claims covering 12,356 ha – approx. 20 km long and 15 km wide Main kimberlites located approx. 10km from De Beer – Mount

  3. Slide 3: Location

    Kon Yellowknife — ons North ct4o Le writin 1B 3." pad gf j y ’ ad e Sunrise

  4. Slide 4: Capital Structure

    Capital Structure Market TSX-V: KDI Shares in issue 16M Fully diluted 16M Market cap ~ $17M Cash $1.5M

  5. Slide 5: Board and Management

    Board and Management  President and CEO – Patrick Evans  Chairman – Jonathan Comerford  CFO – Jennifer Dawson  Director and Audit Chair – David Whittle  Director and Qualified person – Carl Verley

  6. Slide 6: Major Shareholders

    Major Shareholders  Sharkey Family 24%  Dermot Desmond 20%  RBC Investment Advisors 6%  JP Morgan London 5%  Colonial Australia 4,5%  Capital Group London 2.5%  Harry Dobson 1.5%  Patrick Evans 1.4%

  7. Slide 7: Leases and Claims

    A) E — i) — UO ~ = fae} ND D) ZT) se) uv _ - Mineral Tenure o ° £ Prov Mtn. 108-3 1087150-W P A} “Bi Mineral Lease®J Mi ineral Claim -.J re ej ee Kilo meters

  8. Slide 8: Past Exploration (1997 – 2004)

    Past Exploration (1997 – 2004)  Sampling of glacial drift and outcrops for kimberlitic indicator minerals (KIM’s)  Electromagnetic (EM) airborne survey  Airborne and ground gravity surveys  Drilling  Kelvin and Faraday kimberlites discovered in 2000  Macro and micro diamond analysis

  9. Slide 9: Faraday KIM Train

    DTM Interpretation of Possible Trains Areas of Interest

  10. Slide 10: Past Drilling

    Past sass Min: Province - Drill Holes : ee | , CE ae ef Sy e s Yar, ae, % 8 *Dagtl| re yr. a Ter ee a ae S 2 : 2 aa ae Je vs oe | ~_ e q - aa PV v/ens ve -~ wi s , ae 1h a = SPY cas Yee S.. 's -gLoae 16s ey a BR ao exsoon =) 3 si Ls a) ope 2 “q ae ae teh, em A lo Bs F = Sige eget OP ae of PF axl. a

  11. Slide 11: Diamond Recoveries

    Diamond Recoveries Square Mesh Kelvin 184kg Faraday 40kg Hearne 128kg 5034 160kg Size (mm) (No. of (N0. of (No. of (No. of diamonds) diamonds) diamonds) diamonds) 2.000 5 1 2 4 1.000 9 0 10 10 0.500 11 5 17 23 0.300 44 11 46 37 0.212 65 12 77 68 0.150 137 21 83 138 0.104 173 24 143 218 TOTAL 444 74

  12. Slide 12: Diamond Recoveries

    IIINISENINININEISININD SS SINS SEAN EEE IIIS DDS SNEED AIEEE EN SIENA E NEI INES SSPE INIA AENEID IEE SES IE EA NEE IASI DEAN EIN KAL 03 | 860 CAN 03 28% 3e2| Sotleot|o29 Seide. |. KALB] 362 CAA OB 029 2 e¢ i Bea.| 301} coil Jo 10 302 de Stree.}. KI A Stine. |

  13. Slide 13: 2012 Summer Drill Program

    2012 Summer Drill Program  Two core rigs – 2,500 meters  Definition drilling at Kelvin and Faraday successful  Four holes intersected kimberlite along the Kelvin – Faraday kimberlite corridor  Together with past drill holes, results contribute to understanding of the size, shape and grade of the

  14. Slide 14: 2012 Summer Drill Program

    2012 Summer Drill Program © 2

  15. Slide 15: Kimberlite Core

    Kimberlite Core

  16. Slide 16: 2013 Winter Drill Program

    2013 Winter Drill Program  Two drill rigs with one focused on infill drilling along the Kelvin – Faraday kimberlite corridor and the second focused on approx. 20 lake-based kimberlite targets to the west of the corridor  Planned 5,000 meter drill program  Budget approx. $2.5M  Drilling expected

  17. Slide 17: Strategic Location

    Strategic Location  Located approx. 10km from De Beers/Mountain Province mine – Gahcho Kué  De Beers mine currently being permitted; construction expected to commence in 2013; production in 2015  Close proximity opens the possibility for the ore to be mined and trucked to Gahcho Kué mine  Toll t

  18. Slide 18: Strategic Plan

    Strategic Plan  Infill drilling Q1, 2013  Complete initial resource statement H2, 2013  Scoping study Q1, 2014  Pre-feasibility study end 2014  Feasibility study and permitting 2015  Construction and first production 2016

  19. Slide 19: Potential Value

    Potential Value Gahcho Kué Kennady North Resource 30M tonnes ~5M tonnes Grade 1.67 carats/tonne ~2 carats/tonne Diamonds 50M carats ~10M carats Market value ~$700M ~$140M Kennady Diamonds current market cap ~ $17M

  20. Slide 20: Corporate Information

    Corporate Information Head Office 161 Bay Street, Suite 2315 Toronto, Ontario M5J 2S1 Tel: (416) 640-1111 www.kennadydiamonds.com investor@kennadydiamonds.com TSX-V: KDI This presentation may contain certain “forward-looking” statements that involve known and unknown risks, uncertainties and other f

Kennady Diamonds — Investor Presentation (September 2012) on 6ix