Slide 1: Oyu Tolgoi: Advancing Value, Creating Options
Investor Presentation APRIL 2017 Oyu Tolgoi: Advancing Value, Creating Options
Slide 2: Forward-looking statements
Forward-looking statements This presentation includes certain “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Reform
Slide 3: Turquoise Hill's investment thesis
Turquoise Hill’s investment thesis 1. Oyu Tolgoi expected to be world’s third-largest copper mine with underground 2. Significant cash flow expected from underground 3. Hugo North Lift 1 financing in place1 4. Turquoise Hill should benefit from expected drop in copper supply (~2020) Oyu Tolgoi’s res
Slide 4: Oyu Tolgoi's expected production growth
Oyu Tolgoi’s expected production growth Copper ('000 tonnes) Gold ('000 ounces) Expected copper production growth 2017 – 2025: +320% 669 622 612 Expected gold production growth 2017 – 2025: +450% 583 522 521 475 450 397 369 Source: 2016 Oyu Tolgoi Technical Report 256 264 221 175 156 156 149 145 142
Slide 5: Long-term copper fundamentals strong
Long-term copper fundamentals strong Copper supply/demand outlook Copper market likely to enter Base supply Highly probable supply temporary deficit in 2017 Primary demand Average copper price 30 $4 Ongoing attrition at existing Forecast mines driven by declining grade 25 Copper mine supply/dema
Slide 6: Oyu Tolgoi underground a Tier 1 asset
Oyu Tolgoi underground a Tier 1 asset 2025 copper mine C1 + royalties + sustaining normal cost curve C/lb, 2016$ 400 Q1 Q2 Q3 Q4 300 Oyu Tolgoi Other Mines 200 100 0 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Cumulative production (‘000 tonnes) -100 Source: Wood Mackenzie (Q4’16 Co
Slide 7: 2016 Reserves Case mining areas
2016 Reserves Case mining areas Oyut Open Pit ~950Mt (reserve) 0.45% copper; 0.28 g/t gold Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold Hugo North Lift 1 Underground Open Pit Plant Ramp-up (2020-2027), full production (~33mtpa) Open-pit mine tops-up concentrator w
Slide 8: Underground development status
Underground development status Lateral development Shaft 2 1,600 eqv. metres ~ 85 vertical metres Completed in 2016 ahead of Remaining until shaft schedule; increased rates completion (expected 2017); expected in 2017 with bigger used for production and crusher ventilation Convey-to-Surface Shaft 5
Slide 9: Underground mining sequence
Underground mining sequence Initial underground production begins with Panel 0 Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) Highest copper grades occur 1.66% copper; 0.35 g/t gold during ramp up exceeding 2.5% in several years 2024-2026: Oyu Tolgoi peak copper production during period expe
Slide 10: Complete ramp-up expected by 2027
Complete ramp-up expected by 2027 Sustainable underground production Complete convey-to-surface Project First draw Complete concentrator Complete re-start bell firing upgrade ramp-up 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Pre-start Excavation (lateral / mass / vertical) Exc
Slide 11: Key underground components
Key underground components Shaft 1 Shaft 2 Shaft 5 Shaft 3 Shaft 4 (early development (production and (ventilation) (ventilation) (ventilation) and ventilation) ventilation) Total Depth 1,385 metres 1,284 metres 1,178 metres 1,148 metres 1,149 metres Diameter 6.7 metres 10 metres 6.7 metres 10 metre
Slide 12: 2016 Resources Case: ~3.4 billion tonnes
2016 Resources Case: ~3.4 billion tonnes Oyut Open Pit ~950Mt (reserve) 0.45% copper; 0.28 g/t gold Hugo South ~300Mt (resource) Heruga 1.07% copper ~700Mt (resource) 0.06 g/t gold 0.42% copper 0.43 g/t gold; >100Mlb moly Hugo North Lift 1, panels 0,1,2 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold H
Slide 13: Alternative Production Cases
Alternative Production Cases Resources 120 Case • ~Year 20, concentrator capacity ~120mtpa • NPV8% $8.8 billion1 • Expansion capex ~$14.9 billion3 Resources 100 Case • ~Year 20, concentrator capacity ~100mtpa • NPV8% $8.9 billion1 • Expansion capex ~$13.5 billion3 Resources 50 Case • Assumes concent
Slide 14: Production highlights
Production highlights All Injury Frequency Rate Concentrator throughput (per 200,000 hours worked) ('000 tonnes) 0.47 38,152 0.43 34,537 0.33 27,872 20,317 0.22 2013 2014 2015 2016 2013 2014 2015 2016 Industry-leading safety performance Multiple productivity initiatives have led to improved throughp
Slide 15: Financial highlights
Financial highlights Cash position Operating cash flow ($'000,000) ($'000,000) $1,418 $719 $1,344 $651 $399 $863 Cu:$3.10 Cu:$2.49 Cu:$2.21 Au:$1,266 Au:$1,160 Au:$1,251 2013 2014 2015 2016 Cu:$3.33* Au:$1,411* $78 ($631) 2013 2014 2015 2016 Strong cash position Consecutive periods of positive opera
Slide 16: Production and financial guidance
Production and financial guidance 2016 2017 Copper in concentrates 201,300 tonnes (actual) 130,000 – 160,000 tonnes 175,000 – 195,000 tonnes Gold in concentrates ~300,000 ounces (actual) 100,000 – 140,000 ounces 255,000 – 285,000 ounces Operating cash costs $775 million (actual) $720 million $840 mi
Slide 17: Managing near-term ore grade challenges
Managing near-term ore grade challenges Open-pit plan view Phase 7 Phases 6 and 4a as well as low-grade stockpile Phase 6 Phase 10 ore processed in 2017 Phase 5 Phase 8 Phase 4 stripping provides access to higher ore grades in 2018 Phase 4A Phase 9 Phase 4B 17
Slide 18: Oyu Tolgoi's impact in Mongolia
Oyu Tolgoi’s impact in Mongolia Mongolian Workforce Taxes and Fees In-country Spend 94% $1.6B $6.1B At the end of 2016, ~94% Between 2010 and 2016, Between 2010 and 2016, of Oyu Tolgoi’s workforce Oyu Tolgoi paid $1.6B in Oyu Tolgoi has spent was Mongolian taxes, fees and other $6.1B in Mongolia1 pa
Slide 19: Oyu Tolgoi – a long-term growth opportunity
Oyu Tolgoi – a long-term growth opportunity Advancing underground development Creating long-term development options Demonstrated productivity and cost improvements Best copper asset in development today 19
Slide 20: Appendix
Appendix
Slide 21: Approved underground CAPEX
Approved underground CAPEX $1.3 $1.2 $1.2 $1.0 $0.8 $0.5 $0.5 $0.3 $0.4 $0.4 $0.4 $0.3 Underground expansion capital, VAT and escalation of $5.3 billion Underground sustaining capital, VAT and escalation of $2.8 billion to full ramp-up expected in 2027 21
Slide 22: Project finance – flow of funds
Project finance – flow of funds At December 31, 20161 At project finance drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.3 billion2 $4.3 billion3 $4.2 billion Shareholder loan: $3.0 billion Shareholder loan: $3.0 billion Payable to Turquoise Hill* Receivable from Oyu Tol
Slide 23: Underground elements
Underground elements Ground Support Undercut APEX To Drill Drilling Blasting 28m 28m 17m UNDERCUT 17m EXTRACTION 28m Extraction Ore Handling Drawbell Ore Steel Set Pass Drawpoint Extraction Drift Vent IDZ Raise 10 m Drawbell blast 12 m 23