Barrick Mining Corporation · TSX:ABX

Barrick Mining — Barrick Gold — Non-Deal Roadshow (June 2015)

33 slides from Barrick Mining's roadshow presentation, Jun 17, 2015

  1. Slide 1: Haywood Securities Sales Desk Presentation

    Haywood Securities Sales Desk Presentation Toronto | June 17, 2015 1

  2. Slide 2: Cautionary Statement on Forward-Looking Information

    CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION Certain information contained or incorporated by reference in this presentation, including any information as to our strategy, projects, plans or future financial or operating performance, constitutes "forward-looking statements". All statements, o

  3. Slide 3: Barrick: Best Assets and Regions

    Barrick: Best Assets and Regions  High quality portfolio with excellent upside potential Spring Valley  Strong competitive advantages in core regions – Nevada and the Andes  Pipeline of projects with potential to grow free cash flow1 per share 1. See final slide #1 3

  4. Slide 4: Best Assets and Regions

    Best Assets and Regions Pueblo Viejo Lagunas Norte Cortez Goldstrike Veladero 1. See final slide #1 and #2 4

  5. Slide 5: High Grade Reserve Base

    High Grade Reserve Base Grams per tonne1 The average reserve grade of Barrick’s core mines 2.01 BARRICK is more than double the peer average 5 CORE MINES 1.37 BARRICK TOTAL 1.04 0.95 0.9 g/t PEER AVERAGE 0.72 0.66 NEWMONT GOLDCORP KINROSS NEWCREST 1. See final slide #3 5

  6. Slide 6: Production and Cost Outlook

    Production and Cost Outlook Gold Production (Moz) 6.2 6.2-6.61 6.0  2015 gold guidance on- AISC AISC $864 $860- track for production of $8951 6.2-6.6 Moz at AISC of 4.0 $860-$895/ounce 2.0 2014 2015 2015 0 1. See final slide #2 6

  7. Slide 7: Copper Outlook

    Copper Outlook Zaldivar Lumwana Jabal Sayid  Strong cash flow  Operations to continue  Shipments of copper generator under Zambia’s new concentrate  Initiated sale of stake proposed tax regime anticipated in early  Free cash flow positive 2016 at current copper prices  Improved 2015 copper out

  8. Slide 8: Rapid Transformation

    Rapid Transformation Value Swiftly returning Continuing to driving to original drive fast-paced initiatives business model change  Rigorous capital  Lean,  Capex reduced allocation - decentralized after initial specific ROIC operating model capital review thresholds and more  Head-office staff e

  9. Slide 9: Restoring a Strong Balance Sheet

    Restoring a Strong Balance Sheet  Return to a lean, decentralized operating model Maximizing  Targeted G&A cuts of $30M in 2015 & $70M in 2016 1 Free Cash Flow  Initial capital review led to $200M capex reductions  Expect positive FCF in 2015 at current gold prices 2 Disciplined Non-Core Asset S

  10. Slide 10: Restoring a Strong Balance Sheet

    Restoring a Strong Balance Sheet Disciplined non-core asset sales - Value of other gold and copper assets can be leveraged to cover debt reduction target Core mines Other mines1 Copper Cortez Cowal (sold)3 Zaldívar Goldstrike Porgera (50% sold)3 (sale process for partial stake Bald Mountain underway

  11. Slide 11: Applying Strict Capital Discipline

    Applying Strict Capital Discipline Capital allocation  Overall portfolio must Available Capital deliver ROIC of 10-15% Current Portfolio  Allocating capital to Existing Growth the best assets in our Mines Projects core regions 15%  Existing mines compete Return on for capital and must Invested Ca

  12. Slide 12: Reducing Capital Expenditures

    Reducing Capital Expenditures Total Capex ($ Billions)  Re-assessing 2015-2016 $2.2 -7% capex budgets -11%  $200M in capex $1.9- reductions identified $2.2 $1.8- $2.1  Further reductions expected 2014 2015E 2015E (actual) (original) (revised) 1.0 12

  13. Slide 13: Maximizing Free Cash Flow

    Maximizing Free Cash Flow Execution Underway Actions Implemented a decentralized model – annualized G&A savings of $70M in G&A 2016 Capex Identified $200M of capex reductions – more expected Opex Incorporating opportunities from Value Realization reviews into mine plans Pascua- Identifying opportuni

  14. Slide 14: Strong Liquidity

    Strong Liquidity  Less than $0.9B due by 2017  $2.3B in cash1 and $4.0B undrawn credit facility Cash Position Scheduled Debt Repayments to 20182 2.0 $2.3B 1.5 <$0.9B 1.0 0.5 $4.0B 0 Undrawn Credit Facility 2015 2016 2017 2018 1. See final slide #7 2. As of Mar. 31, 2015 14

  15. Slide 15: Value Realization Studies

    Value Realization Studies  Expert teams assessing economic potential of every mine  Studies will support non-core asset sale processes  Upside opportunities being factored into mine plans 15

  16. Slide 16: Pueblo Viejo — Value Realization Study

    Pueblo Viejo — Value Realization Study Extend mine life Processing throughput Convert 7-8 Moz resources to reserves1 Up to 10% increase by 2019 Convert plant from HFO to LNG Convert lime kilns to LNG Reduced operating costs by end of 2017 Reduced energy costs and emissions 1. See final slide #8. 16

  17. Slide 17: Focused on Growth in the Americas

    Focused on Growth in the Americas Turquoise Ridge Cortez Hills Goldrush Spring Valley 17

  18. Slide 18: Turquoise Ridge - Our Highest Reserve Grade

    Turquoise Ridge - Our Highest Reserve Grade 16.9g/t2  2014 drilling added +400 koz Tur- to North Zone M&I resources2 quoise Ridge  North Zone is higher grade than existing mine North Zone Highlights  71% of reserve tonnes  74% of LOM ounces  45% higher grade vs. South  Ore body still open to t

  19. Slide 19: Turquoise Ridge, Nevada

    Turquoise Ridge, Nevada OUTLOOK  2015 production of 175-200 Koz (75% interest) at AISC of $875-925/oz OPPORTUNITIES TO ADD VALUE An emerging core mine3  Second shaft will bring forward >1 Moz of production (100% basis): – Production increases to ~500 koz1 at AISC of $625-$675/oz – Capex of $300-$3

  20. Slide 20: Goldrush — 70% of Resource in M&I

    Goldrush ̶ 70% of Resource in M&I Portal High-grade potential untested and open Cortez to the north Hills Mine Goldrush Deposit1 10.6 Moz M&I 4.9 Moz Inferred 0 miles 1 2 3 4 1. See final slide #3 20

  21. Slide 21: Exploration Focused in the Americas

    Exploration Focused in the Americas $220-$260M1 budget in 2015  ~85% focused on the Americas Lagunas Norte Pierina  Half directed to Nevada Other PERU 15% Mine Project South Turquoise Ridge North Second shaft America AREA America ENLARGED Goldstrike 35% Elko 50% NEVADA Carlin Zaldivar Spring Valle

  22. Slide 22: New Discovery at Alturas

    New Discovery at Alturas  Located on the prolific Chile Argentina El Indio Belt in Chile Pascua-Lama Veladero  Primarily oxide, similar to Barrick Claims Veladero but could be significantly higher grade  Expect initial resource with year-end results1 1. See final slide #11 El Indio Tambo Barrick

  23. Slide 23: Maximizing Free Cash Flow and Returns

    Maximizing Free Cash Flow and Returns High Quality Portfolio and Attractive Project Pipeline Restoring a Strong Balance Sheet Returning to Original Partnership Culture 23

  24. Slide 24: Appendix

    ws BARRICK APPENDIX

  25. Slide 25: Cortez, Nevada

    Cortez, Nevada OUTLOOK  2015 production of 825-900 koz at all-in sustaining costs (AISC) of $760-835/oz OPPORTUNITIES TO ADD VALUE Cortez Hills Lower Zone (< 3,800 ft.)  Mainly oxide and higher grade vs. current underground mine  Limits not yet defined  New targets being identified at depth  Pr

  26. Slide 26: Goldstrike, Nevada

    Goldstrike, Nevada OUTLOOK  2015 production of 1,000-1,150 koz at AISC of $700-800/oz  ~1 Moz of annual production 2015-2017 at AISC of <$900/oz OPPORTUNITIES TO ADD VALUE Thiosulfate circuit ramping-up in 2015  Cyanide-free  Brings forward 4 Moz in the mine plan  350-450koz of annual productio

  27. Slide 27: Pueblo Viejo, Dominican Republic

    Pueblo Viejo, Dominican Republic OUTLOOK  2015 production of 625-675 koz (60% interest) at AISC of $540-590/oz  >1 Moz of annual production in 2015-2017 (100% basis) at AISC of <$700/oz OPPORTUNITIES TO ADD VALUE  Increase process throughput up to 10%  Convert power plant from heavy fuel oil (HF

  28. Slide 28: Lagunas Norte, Peru

    Lagunas Norte, Peru OUTLOOK  2015 production of 600-650 koz at AISC of $675-725/oz OPPORTUNITIES TO ADD VALUE Evaluating potential to mine sulfide ore below current pit  Significant extension of mine life  Potential relocation of autoclave from Goldstrike mine Drilling production blast holes 28

  29. Slide 29: Veladero, Argentina

    Veladero, Argentina OUTLOOK  2015 production of 575-625 koz at AISC of $990-1,075/oz OPPORTUNITIES TO ADD VALUE  Reducing costs through: – Improved maintenance and blasting activities – Reduced contractor services costs  Recovery of ounces from: – Inventory through better management of the leach

  30. Slide 30: Innovation and Technical Expertise

    Innovation and Technical Expertise Goldstrike Jabal Sayid New thiosulfate (TCM) New flotation technology process is cyanide-free is cyanide-free 30

  31. Slide 31: Alturas Exploration

    Alturas Exploration 1 NORTH SOUTH Cross section San Juan ARGENTINA Coquimbo CHILE Grade x Thickness (gpt-m Au) 100 – 524 25 – 100 0.3 – 25 1. See final slide #10, #11 and #12 31

  32. Slide 32: Alturas Cross Section

    Alturas Cross Section > 0.25 gpt Au NORTH SOUTH Argentina > 1.0 gpt Au Cross section1 Chile San Juan ARGENTINA 5000 RL 97m @ 4.40 gpt Au Andesitic Cap 168m @ 1.66 gpt Au Coquimbo CHILE 4750 RL Grade x Thickness Breccia (gpt-m Au)1 100 – 524 4500 RL 25 – 100 Oxidation 0.3 – 25 250m limit Dacitic host

  33. Slide 33: Footnotes

    Footnotes 1. Free Cash Flow (“FCF”) per share, all-in sustaining costs per ounce (“AISC”), and C1 cash costs per pound are non-GAAP financial performance measures with no standardized definition under IFRS. See pages 49-54 of Barrick’s First Quarter Report 2015. 2. 2015 guidance is based on gold, co

Barrick Gold — Non-Deal Roadshow (June 2015) on 6ix