Mountain Province Diamonds Inc. · OTC:MPVDF

Mountain Province Diamonds — Investor Presentation (May 2014)

35 slides from Mountain Province Diamonds's investor presentation, May 2014

  1. Slide 1: Corporate Presentation

    CORPORATE PRESENTATION

  2. Slide 2: Gahcho Kué - world's largest/richest new diamond mine

    Gahcho Kué - world’s largest /richest new diamond mine Potential to be a Tier 1 asset - +20 year LOM, +$20 Billion in situ value Joint Venture with De Beers (51%) Best in class - highest margin new diamond mine

  3. Slide 3: Gahcho Kué compared with other new diamond mines

    Name Reserve Grade Total Diamond Revenue Operating Operating Production Carats Value per tonne Cost Margin (MMct/year) (Mt) (cpht) (MMct) ($/ct) ($/t) ($/t) ($/t) Gahcho Kué DeB/MPV 35.4 157 55.5 174 273 73 200 4.5 Canada Bunder Rio Tinto 37 75 27.6 50 38 20 18 0.7 India Grib Lukoil 98 68 67 160 109

  4. Slide 4: Within De Beers Group

    within De Beers Group = 5) i So = ~ "Y YU <— R22) cL xe) Cc (e) WY cc) Y = 242) dG eeys}weq suojeedo uy a ~ eyousp, 2.0 re) ° = 0.5 0.0 (x) enuaraijsog Cumulative revenue (US$m) Source: De Beers (2010)

  5. Slide 5: Highest Margin Canadian Mine

    3 Highest Margin Canadian Mine 1.40 Canadian Diamond Project Snap 120 Cost/Revenue Lake 1.00 i) 0.80 An £ © 060 Vict s Diavik seus Ekati yao | Cahcho Renard Kue 0.20 0.00 0 250 500 750 1,000 1,250 1,500 1,700 2,000 2,250 2,500 2,750 Value of Production ($ Thousands) Mountain Province Source: Company

  6. Slide 6: Markets

    TSX : MPV Markets NYSE MKT : MDM Market cap ~$550M Shares outstanding 106M Fully diluted 107M Cash ~$20M

  7. Slide 7: Board of Directors

    Jonathan Comerford – Chairman Patrick Evans - President and CEO Bruce Dresner - CT, USA Peeyush Varshney - B.C., Canada Carl Verley - B.C., Canada David Whittle - B.C., Canada

  8. Slide 8: Canada's Diamond Fields

    @ Canada’s Diamond Fields Gameti Wekweeti ¢ Diavik 1 \ i Whati T achchok: : BY ae » Gahcho Kué Ndilo/Dettah Yellowknifi maced NO wae Lutsel K’e Bi Ft. Providence % Ft. Resolution Hay River» a rege at

  9. Slide 9: 61M carat open-pittable resource to 350 metres

    61M carat open-pittable resource to 350 metres

  10. Slide 10: Probable reserves by pipe

    Pipe* Category Tonnes Grade Carats (Mt) (cpht) (Mct) 5034 Probable 13.4 174 23.2 Tuzo Probable 16.4 125 20.6 Hearne Probable 5.6 207 11.7 Total Probable 35.4 157 55.5 JDS Mining, March 2014

  11. Slide 11: Diamond valuation by pipe

    Pipe Carats Dollars $ per Carat 5034 3,089.68 499,328 162 Hearne 2,905.76 254,935 88 Tuzo 2,321.85 690,805 298 Total 8,317.29 1,445,068 174 WWW International Diamond Consultants February 2014

  12. Slide 12: Gahcho Kué Diamonds

    & Gahcho Kué Diamonds Mountain Province DIAMONDS

  13. Slide 13: Feasibility study: IRR and capital

    IRR 32.6% Capital (49%) US$346M Contingency US$33M Working capital US$36M Sust. Cap LOM US$41M Operating cost US$65/tonne LOM 12 years LOM production 53.4 million carats Revenue US$150/carat JDS Mining/Hatch, March 2014

  14. Slide 14: Gahcho Kué – Highest Return

    Project Capital Resource Cost ($/ct) Jwaneng $3B 102M $29.41 8-Cut Venetia Underground $2B 96M $20.83 Gahcho Kué $0.85B 54M $15.74 Gahcho Kué – Highest Return

  15. Slide 15: IRR and NPV by diamond price

    Value IRR NPV $120/carat 32.6% $1.1B $174/carat 43% $1.85B $200/carat 62.5% $3.4B

  16. Slide 16: Revenue, cost and margin

    Revenue ~ $174 per carat Cost ~ $42 per carat Margin ~ $132 per carat Production ~ 4.5M carats/year Cash flow ~ $594M/year MtProv 49% ~ $291M/year Per share ~ $2.43* * Based on post-financing 120M shares in issue

  17. Slide 17: Current status – 23% complete end April

    Review Board approved project July 2013  Federal government approval October 2013  Construction started December 2013  Current status – 23% complete end April Target for plant commissioning H1 2016 Target for start of production Q3 2016

  18. Slide 18: 1st Production Plant Commissioning

    1st Production Plant Commissioning

  19. Slide 19: Construction at GK

    3 Construction at GK ops it ws = we? HOS — <n Sc ee TT ero | Fv = ~ Ci vi Pane

  20. Slide 20: Inferred resources by pipe

    Pipe* Category Tonnes Grade Carats (Mt) (cpt) (Mct) 5034 Inferred 0.9 1.51 1.4 Tuzo Inferred 8.9 1.62 14.6 Hearne Inferred 1.4 1.67 2.4 Total Inferred 11.2 1.64 18.4 Mine life potential from 12 to 16 years

  21. Slide 21: Phase 3: Tuzo Deep

    3 Phase 3: Tuzo Deep ntain Provi DIAMONDS

  22. Slide 22: Depth and volume by phase

    Depth Volume Volume (meters) (tonnes) (carats) Phase 1 Surface to 350 16.4M 20.6M Phase 2 350 to 560 8.9M 14.6M 560 to 750 Phase 3 ~7M ~12M (Potential) 2014 Tuzo Deep drill program underway Mine life potential from 16 to 18 years

  23. Slide 23: Phase 3 Mine Potential

    Phase 3 Mine Potential Tuzo s Pit Tuzo/5034 pits intersection 5034 Pit Mountain Province DIAMONDS

  24. Slide 24: Mine life potential + 20 years

    Mine life potential + 20 years

  25. Slide 25: Phase 4 Exploration Targets

    Phase 5 Exploration Targets | Kimberlites . Mountain Province DIAMONDS

  26. Slide 26: Vision: +20 years LOM, +$20B in-situ Value

    Phase Carats LOM Value est. Phase 1 Reserve 54M 12 years $9.4B Phase 2 Resource 18.4M 4 years $3.2B Phase 3 Tuzo Deep ~ 12M ~3 yrs. ~ $2B Phase 4 Tesla & Other ? ? ? Phase 5 New Targets ? ? ? Vision: +20 years LOM, +$20B in-situ Value

  27. Slide 27: Dominion Diamonds Case Study

    Dominion Diamonds Case Study $56.00 $48.00 $40.00 $32.00 $24.00 $16.00 $8.00 $0.00 Dominion Diamond Share Price (C$) Nov 3, 1999 — Ministerial approval Dominion Diamond Share Price Jan 20, 2003 — Production start-up Y May 16, 2000 — Completion of bankable feasibility study \\ Nov 2, 2001 - US$230 mi

  28. Slide 28: Global Metal Demand

    Global Metal Demand Intensity curve 100 - 90 fF 80 F 7O F 60 + 50 F AO + 30 F 20 F 10 F Percentage of saturation level | Timeframe Source: Rio Tinto oO : 2,000 10,000 18,000 26,000 34,000 42,000 Aluminium r a Se _ Crude steel Titanium Dioxide Borates Diamonds 30,000 28,000 Pain ro PN _ & World GDP/c

  29. Slide 29: Global Diamond Supply & Demand

    @ Global Diamond Supply & Demand Exhibit 1.2: Rough Diamond Market ($B) $20> 19> 18> DEMAND CURVE 17> 16> 15> ESTABLISHED 14> SUPPLY 13 > 12> Tl 10> 9» 8> 7> 6> 2007 2008 2009 2010 200 2012 2013 2014 2015 2016 2017 2018 2019 2020 EXPANSIONS, NEW MINES AND DISCOVERIES Mountain Province DIAMONDS Sourc

  30. Slide 30: Diminishing Diamond Exploration

    @ = Diminishing Diamond Exploration Global exploration spending 20000 Gold m Diamonds O Base Metals O PGMs m@ Other 15000 10000 SMM 5000 0 2002A 2003A 2004A 2005A 2006A 2007A 2008A 2009A 2010A 2011A 2012A 2013E Source: RBC Capital Markets Mountain Province DIAMONDS

  31. Slide 31: Falling Diamond Supply

    3 Falling Diamond Supply Global Rough Diamond Production 200 Argyle U/G Gahcho Kue 150 Angola artisinals [Ekati | g 100 | Diavik Karowe g Jwaneng [iisery] [Benard] Catoca 50 | Orapa 0 Finsch PoE Source: RBC Capital Markets Mountain Province DIAMONDS 19834, 19884, 19934, 19984, 20084, 20084, 2013= 20

  32. Slide 32: Diamond Demand Growth

    & Diamond Demand Growth 200 USA ze 15 m= China S P= India 2 150 8 m Japan DB by 125 Europe 2 (=) = m Gulf Ss = 100 ; = Other 2 8 75 ag 2 g a 50 2 Zz =) S 25 a ie) 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Mountain Province DIAMONDS Source: Rio Tin

  33. Slide 33: Diamond Engagement Ring Demand

    @ Diamond Engagement Ring Demand Japan China 80% 77% 31% 1940 1990 1965 1995 1994 2010 Peak Source: De Beers & Rio Tinto Mountain Province DIAMONDS

  34. Slide 34: Polished diamond prices

    Source: Polishedprices.com

  35. Slide 35: Head Office

    Head Office 161 Bay Street Suite 2315 Toronto, ON M5J 2S1 TSX: MPV Canada NYSE MKT: MDM Tel. ++1-416-361-3562 Fax. ++1-416-603-8565 www.mountainprovince.com info@mountainprovince.com This presentation may contain “forward looking” statements that involve known and unknown risks, uncertainties and ot