Altiplano Metals Inc. · TSXV:APN

Altiplano Metals — Investor Presentation (June 2021)

19 slides from Altiplano Metals's investor presentation, June 2021

  1. Slide 1: Altiplano Metals Corporate Presentation June 2021

    June 2021 TSX.V: APN | OTCQB: ALTFP | WKN: A2JNFG April 1, 2020 APNMETALS.COM 1 TSX.V: APN | OTCQB: ALTFP | WKN: A2JNFG

  2. Slide 2: Forward-looking statements and cautionary notes

    Certain information regarding the Company contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other statements that are not st

  3. Slide 3: Altiplano Metals company overview

    is a Canadian mining company focused on developing and acquiring near term cash flowing assets and exploring for projects of significant scale. Altiplano’s goal is to grow into a mid-tier mining company through developing a portfolio of near-term production projects, cash flowing assets, and explora

  4. Slide 4: Management team

    John Williamson , B.Sc., P.Geol – Executive Chairman & Di rector Management has a substantial record of success in capitalizing on +30 years mining sector, founder of more than 20 successful companies in Canada and around the globe. opportunity, overcoming challenges and building shareholder value.

  5. Slide 5: Goals and revenue generator model

    Goals: APN is growth story junior mining company focusing on acquiring and developing a portfolio of near term/cash flowing assets and exploration projects of significant scale in copper, gold and silver. Revenue Generator Model: Production assets generate cash to be used for re-investment into acqu

  6. Slide 6: Investment highlights

    1 Macro economics outlook supporting higher prices 1 Acquire, develop and expand operations and infrastructure whilst reducing costs, increasing resources, improving grade 2 and generating revenues. $ The Altiplano and Metals Group team has a demonstrated track 3 record to generate shareholder value

  7. Slide 7: Farellon location

    La Serena • Farellon is located 30 minutes south of La Serena with daily flights to Santiago • High-grade copper mine (1.85%) in established mining district with great expansion potential • Excellent local infrastructure and SOUTH AMERICA community relations • APN processing facility, 15 kms from Fa

  8. Slide 8: Farellon high-grade copper-gold vein system

    A high-grade Iron-Oxide-Copper- Gold vein system located near La Serena, Chile permitted to produce 5,000 tonnes/month. 1 Current production grades averaging ~1.80% to 2.10% copper. Underground operation expanded Current to access additional Cu-Au development mineralized zones to the SW and & expans

  9. Slide 9: Cost reductions and positive cash flow

    Cost reductions and grade control have generated numerous quarters of positive cash flow since Q1 2018. 1 and total mined material Improvements observed in grade Total of US$6mm in revenue generated from the sale of 2.9 mm pounds of copper (Q1 2018 - Q1 2021) Significant cost reductions and potentia

  10. Slide 10: Processing facility under construction

    Civil works completed in preparation of constructing a 5,000 tonnes/month (250 tonnes/day) processing facility in late summer 2021. Plant includes two 5’ x 10’ ball mills, crushing and milling equipment and a full flotation circuit. Located 15 kms from Farellon and designed to: • reduce current proc

  11. Slide 11: Processing flow sheet

    2. Trucking to Milling Plant (15 km) Mining Cost = $26, Trucking cost = $5, 1. 5,000 tonnes 6. Decantation Processing cost = $17/tonne* Cu/Au/Fe 7. Drying Process with extraction from chamber press filter *Anticipated Farellon Cu concentrate 3. Crushing 4. Milling 5. Flotation Process Process Proces

  12. Slide 12: Rosario and Laura vein structures

    Two additional vein structures located 600 m and 250 m from Farellon Rosario is accessible by historical 1 underground workings and can restart with minimal capital cost Rosario is permitted to extract up to 5,000 tonnes/m of mineralized material Opportunity to restart the operation to potentially g

  13. Slide 13: Maria Luisa gold-copper vein structure

    A high-grade gold copper vein structure located at Incahuasi, 100 km to the north of La Serena, Chile where historical mining generated grades of 6.85 g/t gold and 1.9% copper. Potential to develop two independent vein structures – NS vein systems in the NE where recent underground sampling yielded

  14. Slide 14: San Pedro project, Nicaragua

    • Large Area: 16,806 Ha in RACCS. Concession currently under application by APN with the Nicaraguan government. Surrounding area recently applied for by Calibre-Rio Tinto JV. 128,000 oz AuEq/year • Reasonable Access & Infrastructure: 8-hour drive from Managua on public >8M oz Au & 5M oz Ag historica

  15. Slide 15: San Pedro exploration results

    1,440m strike >8 gm/t Au grade-width, incl 13m @ 3.3 g/t Au trench Highly-analogous to Calibre’s low-sulphidation epithermal Pavon Project with an indicated resource of 1.9Mt at 5.16 g/t Au1 As-Sb-Cu-Mo • Mineralization occurs as gold in quartz veins or quartz breccias hosted in Tertiary-age volcani

  16. Slide 16: Epithermal gold deposits

    Epithermal Gold Deposits paleosurface sinter Epithermal gold deposits account for most of the gold produced in Nicaragua. silica cap San Pedro Project Characteristics Present-day exposure • boiling textures visible in auriferous quartz veins (e.g., colloform banding) and presence of adularia consist

  17. Slide 17: Portfolio of revenue generating assets

    Maria Luisa As providers of capital and technical expertise, we focus on quality permitted projects that can quickly generate revenue Plant with minimal capital and technical risk. Plant Altiplano is creating a “portfolio” of revenue generating copper and gold assets with the goal of operating three

  18. Slide 18: Milestones 2017 to 2021

    2017 2019 2021 Increase market cap by building a portfolio Develop strong local team and relationships. Focus Achieved operational consistency of multi cash flow and exploration projects on leasing projects with 5,000 t/m production. Ease while reducing costs and improving grade. of scale in Cu, Au,

  19. Slide 19: Contact and share structure

    Contact Head Office 250 Southridge NW, Suite 300 Shares Outstanding May 14, 2021* Edmonton, Alberta Canada www.apnmetals.com Shares Outstanding 113,218,007 Warrants (@ $0.40) 6,670,260 Warrants (@ $0.25) 9,623,454 Options (@ avg $0.20) 9,660,750 Fully Diluted 139,172,471 Cash $3.0 M In-the-money opt

Altiplano Metals — Investor Presentation (June 2021) on 6ix