Challenger Gold Limited · ASX:CEL

Challenger Gold — Challenger Exploration — Investor Presentation (April 2023)

25 slides from Challenger Gold's investor presentation, Apr 5, 2023

  1. Slide 1: Shareholder Webinar (5 April 2023)

    ASX: CEL Shareholder Webinar (5 April 2023) Hualilan Gold Project : Cerro Sur looking north to Cerro Norte Challenger Exploration Limited Argentina and Ecuador Gold / Copper Projects 1

  2. Slide 2: Important Notices and Disclaimer

    IMPORTANT NOTICES AND DISCLAIMER DISCLAIMER This presentation is for informational purposes only and does not constitute an offer to sell, or solicitation to purchase, any securities. Such Offer can be made only through proper subscription documentation and only to investors meeting strict suitabili

  3. Slide 3: Challenger Exploration Snapshot

    CHALLENGER EXPLORATION SNAPSHOT Two significant discoveries, both with grade and scale, provide strategic flexibility • Hualilan Gold Project (100% - San Juan) - 2.8 Moz1 resource remains open • High-grade system overlying a large intrusion-hosted discovery EL GUAYABO/COLORADO V GOLD - • High-grade

  4. Slide 4: 3 Year Price Chart and Key Events

    3 YEAR PRICE CHART AND KEY EVENTS $42 million Hualilan Metallurgy placement 94% Au recovery at $0.28 2.1 Moz Hualilan resource Hualilan Drilling 110m at 3.0 g/t 131m at 2.5 g/t Price based on $110 Oz of Australian gold developers (refer Channel Sampling slide 24) 15.6m at 71.7 g/t 64.8m at 28.3 g/t

  5. Slide 5: Key Milestones Over the Next 9 Months

    KEY MILESTONES OVER THE NEXT 9 MONTHS Delivery of several significant and value accretive milestones over the next 4 months Hualilan Gold Project, Argentina El Guayabo Project, Ecuador • Acquisition of underlying land covering project: • Ongoing Drill results – 100% owned ground ✓ Feb 2023 – 20,000

  6. Slide 6: Hualilan Gold Project: 2.8Moz and growing

    HUALILAN GOLD PROJECT Late Stage Intrusive Breccia (post mineral)

  7. Slide 7: Updated Mineral Resource Estimate (MRE)

    UPDATED MINERAL RESOURCE ESTIMATE (MRE) Dial in your preferred grade – the grade tonnage distribution provides significant flexibility Total MRE at various cut off grades • Upgraded MRE increases to 2.8 million ounces (AuEq)1 . • Significant increase in the high-grade component of Updated MRE: ▪ Upg

  8. Slide 8: Mineralisation Remains Open at Depth and Along Strike

    MINERALISATION REMAINS OPEN AT DEPTH AND ALONG STRIKE Several zones of high-grade starter material near surface 8

  9. Slide 9: MRE Block Model Type Sections

    MRE Block Model Type Sections The 2.8 Moz MRE remains open 9

  10. Slide 10: Northern Verde Zone

    NORTHERN VERDE ZONE New high-grade zones developing at depth Verde High Grade mineralisation • Verde 115 domain contribution to MRE: i. Open Pit – 459,000 Oz ii. Underground – 120,000 Oz at 3.7 g/t AuEq iii. Total - 579,000 Oz • Open to the north and open at depth • Verde 115 domain now looking like

  11. Slide 11: Building a District Scale Footprint at Hualilan

    BUILDING A DISTRICT SCALE FOOTPRINT AT HUALILAN Discoveries like Hualilan seldom occour in isolation – hence a 600 sqkm footprint which is unexplored • Building towards a district scale 600 km2 footprint: ▪ 235 km2 granted to CEL ▪ 329 km2 pending grant (registered in Mining Cadastre) Existing Miner

  12. Slide 12: The Exciting Opportunity at Hualilan

    THE EXCITING OPPORTUNITY AT HUALILAN Exploration has only focussed on one side of the intrusion responsible for Hualilan Processing of surface magnetic data indicates there are at least five major intrusive ATE supports the concept that centres the same 3 mineralisation has developed age as the Hual

  13. Slide 13: El Guayabo/Colorado V Project Ecuador

    El Guayabo/Colorado V Project Ecuador 13

  14. Slide 14: El Guayabo Au-Cu Project Overview

    Cangrejos Deposit EL GUAYABO Au-Cu Project Overview - 17.1 Moz at 0.6 g/t AuEq - Gold with Cu, Ag, Mo credits - 500,000 Oz AuEq production1 - ASIC US$604 Oz1 Phase #1 Exploration Drilling at El Guayabo and Colorado V (2021-2023) 1 Source Lumina Gold (TSX: LUM) PEA June 2020 • 5 kilometres along stri

  15. Slide 15: 25,000 Metre Resource Drill Out on 100% Owned Ground

    25,000 METRE RESOURCE DRILL OUT ON 100% OWNED GROUND Consistent zone of high-grade Au-Cu-Ag within the main body of mineralisation in the GY-A Discovery zone • 25,000m resource drill out will Area of MRE drill out focus on GY-A anomaly. ~ 900m strike GY-A • GY-A contains the significant zone of high

  16. Slide 16: Main Discovery Zone (GY-A) High-Grade Copper Block

    MAIN DISCOVERY ZONE (GY-A) HIGH-GRADE COPPER BLOCK Provides a coherent high-grade core of mineralisation with dimensions of 250 metres x 125 metres Insert cu breccia plan view map GY-B GYDD-21-008 : 228.5m to 231.7m 6.6 g/t AuEq – (3.0 g/ Au, 1.8% Cu, 49.0 g/t Ag) 16

  17. Slide 17: GY-B Section A-B, 1.2 Kilometres

    A B GYDD-22-024 638.2m at 0.6 g/t AuEq inc 304.3m at 1.0 g/t AuEq inc 108.5m at 2.4 g/t AuEq inc 54.2 m at 4.0 g/t AuEq ? 1.2 kilometres 17

  18. Slide 18: Colorado V Drill Program Update

    Cangrejos Deposit COLORADO V DRILL PROGRAM UPDATE - - 21.8 Moz AuEq at 0.6 g/t AuEq Gold with Cu, Ag, Mo credits First drill holes produce two significant gold discoveries - 500,000 Oz AuEq production1 - ASIC US$604 Oz1 • Au-Cu soil anomalies 1km x 0.5km 1 Source Lumina Gold (TSX : LUM) PEA June 202

  19. Slide 19: Valuation and Milestones

    Valuation and Milestones Challenger Exploration

  20. Slide 20: Shareholder Questions

    Shareholder Questions 1. The share price of CEL has sold off 72% from 30th Apr20 [$0.395] to 14th Mar23 [$0.11]. During this period the Spot Gold price has increased 13% and is currently trading at USD$1912/oz • Additionally in this time millions of $’s of shareholder funds has been spent achieving

  21. Slide 21: Value Proposition

    VALUE PROPOSITION Many catalysts achieved and significant opportunity to be re-rated with several price catalysts in the short term Several Share Price catalysts as we execute our strategy Now $0.16 • As we execute over the next 6-9 months there will be several valuation catalysts as milestones are

  22. Slide 22: Company Strategy

    COMPANY STRATEGY - Deliver key milestones in Argentina and Ecuador and create value for CEL shareholders Our Aspiration is to become a globally significant gold producer Hualilan Gold Project El Guayabo Project Company Strategy Argentina Ecuador • Hualilan to provide a high-grade low • 2.8 million o

  23. Slide 23: Appendix 1

    Appendix 1 Mineral Resource Estimate and information required under JORC Code 23

  24. Slide 24: Hualilan Gold Project - Mineral Resource Estimate

    HUALILAN GOLD PROJECT - MINERAL RESOURCE ESTIMATE JORC 2012 Compliant MRE released Mar 2023 and references 1 Gold Equivalent (AuEq) values El Guayabo Project- Requirements under the JORC Code • Assumed commodity prices for the calculation of AuEq is Au US$1780 Oz, Ag US$22 Oz, Cu US$9,650 Total MRE

  25. Slide 25: Challenger Exploration Limited Contacts

    CHALLENGER EXPLORATION LIMITED (ASX:CEL) ACN 123 591 382 Level 1, 1205 Hay Street, West Perth WA 6005 | P: +61 8 6380 9235 Kris Knauer Scott Funston Elvis Jurcevic Jane Morgan CEO & Managing Director CFO & Finance Director Investor Relations Media Relations +61 411 885 979 +61 413 867 600 +61 408 26

Challenger Exploration — Investor Presentation (April 2023) on 6ix