  1. Slide 1: Tullamarine Landfill Community Meeting

    Tullamarine Landfill Community Meeting 30 March 2016

  2. Slide 2: Stormwater Connection – Improved Design

    Stormwater Connection – Improved Design Landscaped Channel No Pipe Concrete Pits and Pipes Amended Landscaped Channel Weir Landscaped Channel Road Crossing Instead of Concrete Pipe.

  3. Slide 3: Stormwater Connection Improvements in Design

    Stormwater Connection Improvements in Design  Increased frog habitat area  Less concrete  Softer Landscaping approach  Less likelihood of erosion  Improved water quality  Increased safety

  4. Slide 4: Groundwater Update

    Groundwater Update  Currently Updating the Management and Monitoring Plan  Information on current monitoring frequency will be provided with Technical Review information  TECHNICAL REVIEW  Currently with the Auditor  The Technical Review Report will be ready for the community by end of April 

  5. Slide 5: New Landfill Gas Perimeter Boreholes

    New Landfill Gas Perimeter Boreholes Proposed Locations On Airport Land Prepared by Cardno Lane Piper for Cleanaway

  6. Slide 6: New Groundwater Monitoring Boreholes

    New Groundwater Monitoring Boreholes Proposed Proposed Locations Locations Non regulatory requirement

  7. Slide 7: Air Quality Testing Update

    Air Quality Testing Update  Flare sampling for methane destruction efficiency will take place in April 2016.  A second full emissions test is to be completed after methane testing is undertaken during May/June when climate conditions are colder.  Ambient air monitoring design and procedure being

  8. Slide 8: Flare Sampling Equipment - Calibrated In-Situ Equipment

    Flare Sampling Equipment - Calibrated In-Situ Equipment Methane (CH4), Temp, Pressure, Flow

  9. Slide 9: Flare Equipment - New Sample Location

    Flare Equipment - New Sample Location

  10. Slide 10: Flare Equipment

    Outlet Sample Flare Equipment Point Sample Canister for Laboratory Inlet Sample Point Water Knock Methane Out Pot Detector Calibrated Data Blower Collection Sample System Canister for Flow Laboratory Temperature Methane % Combustion Air Inlet Landfill Gas Inlet

  11. Slide 11: Tullamarine Landfill Flare Data - February 2016

    Tullamarine Landfill Flare Data - February 2016 jow m3/hr Stack Temp C