Eldorado Gold Corporation · TSX:ELD
Eldorado Gold — European Gold Forum April 2013
36 slides from Eldorado Gold's conference presentation, April 2013
Slide 1: Continuing to Build a Quality Business
Continuing to Build a Quality Business European Gold Forum April 2013
Slide 2: Forward-looking statements
Certain of the statements made in this Presentation may contain forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities law. These forward-looking statemen
Slide 3: > 650,000 oz gold producer with 20 years of international experience
> 650,000 oz gold producer with 20 years of international operating experience Leading low cost operator with solid margins and a strong balance sheet Experienced management team with a proven ability to safely build and Open Pit, Kişladağ, Turkey operate mines www.eldoradogold.com 3
Slide 4: Track record of value creation and solid reserve base
Track record of value creation through exploration, development, production and acquisitions Solid reserve and resource base (P&P gold reserves: 25.7 Moz) Competitive and transparent dividend Processing Plant, Efemcukuru, Turkey policy www.eldoradogold.com 4
Slide 5: Well-balanced portfolio of high-quality, low-cost assets
Well-balanced portfolio of high-quality, low-cost assets Operations in 5 highly prospective countries with well-established mining cultures 5 producing gold mines are the core of our business 6 development projects funded by strong balance sheet www.eldoradogold.com 5
Slide 6: 2013 guidance and priorities
Gold production of 705,000–760,000 oz Cash operating costs of $515–$530/oz; estimated total cash costs of ~$585/oz Capital expenditure of $648m ($410 operations; $238 projects) Exploration budget increased by 22% to $98.5m Cash and cash equivalents of $817m at year end 2012 Dividend of C
Slide 7: Our vision: long-term, profitable and sustainable business
Our vision: to create a long-term, profitable and sustainable business using a disciplined approach to growth Create Value Identify Increase margins Opportunities through high-quality, low cost operations Develop Low CostProjects Disciplined M&A Generate solid cash & Increase approach to acquire flo
Slide 8: Our strategy: low-cost operator of high-quality assets
Our strategy: to be a low-cost operator of high-quality assets High quality, Low cost Asset Quality long life mines assets Solid margins Doubled Technical 20 years of Built 4 mines production & operating in 3 countries Expertise experience on budget reserves in 5 years Capital Prudent Rigorous Stron
Slide 9: Increasing Gold Production and Reserves & Resources
Increasing Gold Production and Reserves & Resources Over the past 5 years we have: Reserves & Resources (Moz) 40 700 Gold Production (Koz) 35 600 30 500 Doubled production 25 400 20 300 15 200 Materially increased reserves 10 5 100 & resources per share 0 0 2008 2009 2010 2011 2012 P+P M+I Pro
Slide 10: Dividend as % of Earnings 2011 & 2012
Dividend as % of Earnings 2011 & 2012* 35% 30% 25% (% of earnings) 20% 15% 10% 5% 0% Yamana Barrick Eldorado Goldcorp Kinross 2011 2012 Source: Company Q4 2011 & 2012 Results Releases * Adjusted Earnings www.eldoradogold.com 10
Slide 11: Estimated Gold Production 2012-2016
Estimated Gold Production 2012-2016 Strong production growth (Average Annual Growth Rate: 27%) with decreasing cash costs Over 1.5 million oz of gold produced in 2016 Cash operating costs (net of by- product) declining to $300-350/oz in 2016 Balance sheet strength maintained Continue to di
Slide 12: Four projects account for 75% of future production growth
These four projects account for 75% of Eldorado’s future production growth Kişladağ Olympias Skouries Perama Hill (Expansion) (Expansion) (Construction) (Development) www.eldoradogold.com 12
Slide 13: Kişladağ expansion highlights
EXPANSION Highlights Current production rate 12.5 million tonnes / year (crushing, screening, stacking) Expanded production rate 25.0 million tonnes / year (crushing, screening, stacking) Expanded production rate, average 475,000 ounces / year LOM strip ratio 1.4:1 ROM ore treatment , average 8MT /
Slide 14: Kişladağ expansion: engineering, procurement, construction
EXPANSION Engineering Detailed engineering design initiated Procurement Phase IV Leach Pad Expansion Continue procurement of major mining and process equipment Phase IV Plant Expansion Major fabrication initiated Construction Construction of Phase IV leach pad extension Installation of Nor
Slide 15: Investment highlights summary
Low cost operator with solid margins and strong balance sheet Portfolio of high-quality, long-life mines and development projects Management team that has built 4 mines in 3 countries since 2005 Track record of growing reserves and resources, expanding production and increasing margins Com
Slide 16: Thank You
Thank You TSX: ELD NYSE: EGO Total shares outstanding (as at Dec 31, 2012): 714.3 M Investor Relations: Nancy Woo (604) 601-6650 ⋅ nancyw@eldoradogold.com www.eldoradogold.com 16
Slide 17: Background Information
Background Information www.eldoradogold.com 17
Slide 18: Five cornerstone gold mines
Five cornerstone gold mines: Kişladağ Efemçukuru Jinfeng Tanjianshan White Mountain www.eldoradogold.com 18
Slide 19: Kişladağ
PRODUCTION OVERVIEW Location Uşak Province, Western Turkey Deposit Gold porphyry Ownership 100% Eldorado Open pit Type Heap leach gold mine Expected Life of Mine 15-20 years Recovery 65% Strip Ratio 2013 1.75:1 RESERVES AND RESOURCES (at Dec 31, 2012) Proven + Probable Reserves 10.0 Moz Au @ 0.70 g/
Slide 20: Efemçukuru
PRODUCTION OVERVIEW Location Izmir Province, Western Turkey Deposit High grade epithermal gold vein Ownership 100% Eldorado Underground gold mine Type Flotation and Carbon in Leach Expected Life of Mine 12 years Recovery 87% RESERVES AND RESOURCES (at Dec 31, 2012) Proven + Probable Reserves 1.3 Moz
Slide 21: Jinfeng
PRODUCTION OVERVIEW Location Guizhou Province, China Deposit Carlin type 82% Eldorado Ownership 18% Guizhou Lannigou Gold Mine Ltd Open pit and underground gold mine Type Biox and Carbon in Leach Expected Life of Mine 13 years Recovery 85% RESERVES AND RESOURCES (at Dec 31, 2012) Overview Acquired
Slide 22: Tanjianshan
PRODUCTION OVERVIEW Location Qinghai Province, China Deposit Orogenic 90% Eldorado 5% First Institute of Geology and Ownership Mineral Exploration of Qinghai Province 5% Dachaidan Gold Mine Open pit gold mine Type Float roast Carbon in Leach Expected Life of Mine 5 years Recovery 81% Overview Strip
Slide 23: White Mountain
PRODUCTION OVERVIEW Location Jilin Province, China Deposit Orogenic 95% Eldorado Ownership 5% Jilin Tonghua Institute of Geology and Minerals Exploration and Development Underground gold mine Type Carbon in Leach plant Expected Life of Mine 9 years Recovery 80% Overview Acquired by Eldorado from S
Slide 24: Vila Nova iron ore mine
PRODUCTION OVERVIEW Location Amapa State, Brazil Ownership 100% Eldorado Type Open pit iron ore mine Expected Life of Mine 9 years RESERVES AND RESOURCES (at Dec 31, 2012) Overview Commercial production began in 2011 Proven + Probable Reserves 9.7 Mt @ 58.8% Fe 2013 Guidance Measured + Indicated R
Slide 25: Stratoni
PRODUCTION OVERVIEW Location Chalkidiki Peninsula, Northern Greece Deposit Replacement mixed sulphide 95% Eldorado Ownership 5% Aktor SA Underground drift and fill Type Multi-stage flotation Expected Life of Mine 5 years RESERVES AND RESOURCES (at Dec 31, 2012) 5.3 Moz Ag @ 184 g/t Proven + Probable
Slide 26: Six development projects
Six development projects: Olympias Skouries Perama Hill Certej Tocantinzinho Eastern Dragon www.eldoradogold.com 26
Slide 27: Olympias construction
CONSTRUCTION OVERVIEW Location Chalkidiki Peninsula, Northern Greece Deposit Replacement mixed sulfide 95% Eldorado Ownership 5% Aktor Investment Holdings Limited Underground mine Type (previously mined using underground drift and fill) Estimated Development Capital US$165 million (to Phase II UG pr
Slide 28: Skouries construction
CONSTRUCTION OVERVIEW Location Chalkidiki Peninsula, Northern Greece Deposit Gold-copper porphyry 95% Eldorado Ownership 5% Aktor Investment Holdings Limited Type Open pit and underground Strip Ratio (open pit) 0.7:1 Estimated Development Capital US$340 million (to plant production from open pit) Ov
Slide 29: Perama Hill development
DEVELOPMENT OVERVIEW Eastern Thrace, northern Location Greece Epithermal gold-silver vein Deposit deposit Ownership 100% Eldorado Type Open pit gold mine Expected Life of Mine 8 years 90% (Gold) Expected Recovery 60% (Silver) Estimated Development Capital US$220 million Production Expected Q1 2015 S
Slide 30: Certej development
DEVELOPMENT OVERVIEW “Golden Quadrilateral” area Location of the Apuseni Mountains, Western Romania Epithermal gold-silver Deposit deposit Ownership 80% Eldorado Open pit Type (Previously mined via shallow open pit) Expected Life of Mine 12 years Estimated Development Capital US$270 million Overview
Slide 31: Tocantinzinho development
DEVELOPMENT OVERVIEW Tapajos district, Para State, Location central Brazil Shallow, intrusion-hosted, Deposit non-refractory gold deposit Ownership 100% Eldorado Type Open pit gold mine Expected Life of Mine 11 years RESERVES AND RESOURCES (at Dec 31, 2012) Proven + Probable Reserves 1.9 Moz Au @ 1.
Slide 32: Eastern Dragon development
DEVELOPMENT OVERVIEW Location Heilongjiang Province, China Deposit High-grade, epithermal, gold-silver vein 95% Eldorado Ownership 5% County (Daxinglanling Yihua Development Company Ltd) Open pit and underground gold mine, Type CIL plant under construction Expected Life of Mine 7 years Expected Reco
Slide 33: 2013 Exploration budget: US$98.5 million
2013 Exploration budget: US$98.5 million Romania ($12m) 5 projects 34,000 meters Vancouver (Head Office) ($3.5m) Greece ($23m) 6 projects 47,000 meters Turkey ($12m) China ($22m) 4 projects 9 projects 25,000 meters 59,000 meters Brazil ($16m) 4 projects 16,000 meters Other Proj
Slide 34: Summarized Financial Results
Summarized Financial Results 2012 2011 Revenues (millions) $1,147.5 $1,103.7 Gold sold (ounces) 625,394 658,919 Average realized gold price ($/ounce) $1,674 $1,581 Cash operating costs ($/ounce sold) (1) $483 $405 Total cash cost ($/ounce sold) (1) $554 $472 Gross profit from gold mining operations(
Slide 35: Reserves and resources by project
Total Proven and Probable Total Measured and Indicated Inferred Resources Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (x1000) (Au g/t) (x1000) (x1000) (Au g/t) (x1000) (x1000) (Au g/t) (x1000) Certej (See Note 5) 106,700 1.27 4,380 24,400 1.01 800 Eastern Dragon 3,090 7.71 764 3,500
Slide 36: TSX: ELD NYSE: EGO
TSX: ELD NYSE: EGO Total shares outstanding (as at Dec 31, 2012): 714.3 M Investor Relations: Nancy Woo (604) 601-6650 ⋅ nancyw@eldoradogold.com www.eldoradogold.com 36