TransGlobe Energy Corporation

TransGlobe Energy — Investor Presentation (July 2016)

23 slides from TransGlobe Energy's investor presentation, July 2016

  1. Slide 1: TransGlobe Energy Corporate Presentation July 2016

    TRANSGLOBE ENERGY CORPORATE PRESENTATION JULY 2016

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT This presentation may include certain statements that may be deemed to be “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. Such statements relate to possible future events. All statements other than statements of histo

  3. Slide 3: About TransGlobe

    ABOUT TRANSGLOBE Operations in Egypt began in 2004 • Currently 100% of production Proven track record with extensive international experience Extensive and diversified portfolio of development and exploration Egypt opportunities Focused on building a diversified international platform Began marketin

  4. Slide 4: Undervalued with Balance Sheet Strength

    UNDERVALUED WITH BALANCE SHEET STRENGTH CAPITAL STRUCTURE (US$) Shares Outstanding (30/06/16) ~72.2 Million Market Capitalization (30/06/16) $132.1 Million Debt (31/03/16) $66.5 Million Working Capital (31/03/16) $75.2 Million Enterprise Value ~$123.4 Million RESERVES 2P Reserves (31/12/15) 28.7 MMB

  5. Slide 5: Mid Q2-2016 Highlights (June 22, 2016)

    MID Q2-2016 HIGHLIGHTS (JUNE 22, 2016)  Q2 production guidance upgraded to 11,400 Bopd from 10,800 Bopd  Commenced 2016 drilling program in Q2 with one drilling rig  K-48 development well (K-South) at W Bakr on production ~460 Bopd in June  Two exploration wells at NWG resulting in 2 D&A wells (

  6. Slide 6: Oil Marketing

    OIL MARKETING EGPC AR Outstanding • Marketing has improved liquidity, $140,000 decreased credit risk and $120,000 $100,000 resulted in West Bakr production $80,000 $60,000 being sold at market price $40,000 • TransGlobe marketed and sold $20,000 $0 1,601,038 barrels during 2015 Dec-14 Mar-15 Jun-15

  7. Slide 7: Netback Sensitivity to Oil Prices

    NETBACK SENSITIVITY TO OIL PRICES 25.00 $21.49 20.00 $16.80 15.00 Netback $12.12 10.00 $7.44 5.00 $2.76 0.00 $40.00 $50.00 $60.00 $70.00 $80.00 Brent Oil Price Per Bbl Assumptions: • Total Company production equal to Q1-2016 production (West Gharib: 7,692 bopd and West Bakr: 4,366bopd) • Ras Gharib

  8. Slide 8: Current Daily Production

    CURRENT DAILY PRODUCTION TRANSGLOBE TOTAL DAILY 20,000 Production (bopd) 15,000 10,000 5,000 NWG East Ghazalat West Bakr West Gharib 0 Jul-15 Sep-15 Nov-15 Jan-16 Mar-16 May-16 Q1 – 12,058 BOPD JUNE– 11,936 BOPD Q2 EST– ~11,400 BOPD 8

  9. Slide 9: 2016 Plan

    2016 PLAN • Deliver the 2016 exploration drilling program of up to 22 exploration wells in a cost effective, safe and environmentally responsible manner • Map and evaluate the new South Ghazalat 3-D and prepare for the NW Sitra seismic program (late 16/17) • Maintain core production assets and basel

  10. Slide 10: 2016 Production Recovery Plan

    2016 PRODUCTION RECOVERY PLAN Target: • Arrest current declines and increase production in Eastern Desert through Q4-2016 Components: • Replace worn pumps to optimize producers • Reactivate/workover shut-in wells • Recompletions & facility upgrades • Development drilling (K-South, others) • Developm

  11. Slide 11: Investment Highlights

    INVESTMENT HIGHLIGHTS 1.5 Million gross acres of land • 2016 Exploration focus  8 PSCs in Egypt (100% WI)  In Eastern Desert, drill up to 22 exploration prospects Strong balance sheet with net working  In Western Desert, interpret new 3-D in South capital of $75.2MM (31/03/16) Ghazalat and prepar

  12. Slide 12: Eastern Desert Exploration Program

    EASTERN DESERT EXPLORATION PROGRAM Red Bed Prospects • 8 prospects (COS 17% avg) • 4-12 mmbbls prospective resource** Miocene Clastic Prospects • 8 prospects (COS 32% avg) • 2-8 mmbbls prospective resource** Pre-Rift Prospects • 6 prospects (COS 18% avg) • 2-6 mmbbls prospective Eastern Desert explo

  13. Slide 13: West Gharib/West Bakr: 100% WI - Operated

    WEST GHARIB/WEST BAKR: 100% WI - OPERATED Eastern Desert Production • Q1-2016 – 12,058 Bopd • Q2-2016 Est – ~11,400 Bopd 2016 Plan • Optimization and cost reduction • Integration of the West Bakr and West Gharib JV’s • Maintenance/optimization projects • K-South development at West Bakr  Drilled K-

  14. Slide 14: Eastern Desert Development – K-South Plan

    EASTERN DESERT DEVELOPMENT – K-SOUTH PLAN K-South • OOIP: ~ 55 MMbo* • Production to date: 5.9 MMbo (10.7% RF) • 2P Reserves @ Dec 31/15 ~3.9MM (implied 18% RF) • K main pool (Asl A) expected recovery ~29% RF • K-South potential @ 29% RF, 8-10 MMbo remaining K-48 K-48 • Drilled in April • 33 meters

  15. Slide 15: NW Gharib: 100% WI - Operated

    NW GHARIB: 100% WI - OPERATED NWG #3 2016 Plan • Progress three (NWG #1, #3 & #5) oil developments toward first NWG #1 production in late 2016 • ~500-900 Bopd initial NWG production potential* #5 • Drill up to 13 new exploration prospects NWG SWG * Internally estimated 15

  16. Slide 16: Egypt Assets: Western Desert

    EGYPT ASSETS: WESTERN DESERT • Three operated 100% WI concessions (1.14 million acres) • Map & evaluate the 2015 South Ghazalat 3-D • Prepare for NW Sitra 3-D seismic acquisition program 2016/17 • Prepare Western Desert prospect inventory for 2017/18 drilling @ NWS & S. Ghazalat • Continue access di

  17. Slide 17: South Ghazalat Seismic Dip Line

    SOUTH GHAZALAT SEISMIC DIP LINE Rift Margin Edge Several structures along rift margin • Excellent quality data from & Tertiary Seal U. Cretaceous 2015 3-D acquisition • The rift margin is well imaged with good data to Jurassic U. Cretaceous Reservoirs level • Early work is showing several structures

  18. Slide 18: South Ghazalat Seismic Strike Line

    L. Jurassic U. Cretaceous U. Cretaceous Cretaceous Reservoirs & Tertiary Seal Reservoirs Reservoirs 18 SOUTH GHAZALAT SEISMIC STRIKE LINE L. Jurassic Cretaceous Reservoirs Reservoirs U. Cretaceous U. Cretaceous Reservoirs & Tertiary Seal

  19. Slide 19: Summary

    SUMMARY Opportunity rich Attractive valuation Average Q2 production of ~11,400 Bopd with active PRP for Q3/Q4 Strong balance sheet, $75.2MM positive working capital @ March 31st, 2016 (inclusive of Convertible Debenture) $128.0MM in cash @ June 22nd, 2016 Growth potential with a large drilling campa

  20. Slide 20: Executives and Directors

    EXECUTIVES AND DIRECTORS • Robert G. Jennings - Director, Chairman • Ross G. Clarkson - Director, President and CEO • Lloyd W. Herrick - Director, VP and COO • Geoffrey C. Chase - Director • Fred J. Dyment - Director • Susan MacKenzie - Director • David Cook - Director • Bob MacDougall - Director •

  21. Slide 21: Analyst Coverage

    ANALYST COVERAGE • David Phung, Credit Suisse Securities, Calgary, Canada • David Dudlyk, Dundee Capital Markets, London, UK • Darren B. Engels, First Energy Capital Corp., Calgary, Canada • Ian Macqueen, Paradigm Capital, Calgary, Canada • Kimberly Hedlin, Canaccord Genuity, Calgary, Canada • Pavel

  22. Slide 22: Concession Summary

    CONCESSION SUMMARY Concession Size Working Year Concession First Production (acres) Concession Interest Gross/Net Acquired Type Date West Gharib 100% 24,035 2007 Development January 2000 NW Gharib 100% 148,300 2013 Exploration N/A SW Gharib 100% 48,000 2013 Exploration N/A SE Gharib 100% 125,000 201

  23. Slide 23: For additional information contact us

    For additional information contact us at: Phone: +1 (403) 264 9888 Email: investor.relations@trans-globe.com Or visit: www.trans-globe.com