Alkane Resources Ltd · ASX:ALK

Alkane Resources — Alkane Exploration — NSW Miners and Explorers Conference 2004

42 slides from Alkane Resources's conference presentation, Oct 18, 2004

  1. Slide 1: NSW Miners and Explorers Conference

    LKANE EXPLORATION LTD ABN 35 000 689 216 NSW Miners and Explorers Conference SYDNEY 18 – 19 October 2004

  2. Slide 2: Corporate Profile

    CORPORATE PROFILE ASX Code ALK (listed since 1969) Issued Capital 136m shares 9.8m listed opts / 9.2m unlisted Cash $1.5m Trading Range 03/04 $0.17 - $0.56 Current Market Cap $25m No Debt LKANE

  3. Slide 3: Central Lachlan Fold Belt

    Wyoming 0.5M oz Central Dubbo Lachlan Northparkes Wellin gton 1.3M oz Rockley Fold Belt Gulgong Peak Hill Volcanic Belt Mo long 0.7M oz NSW Junee Na rrowmine Volcanic Belt Volcanic Parkes Modern mines Belt Orange Lewis Ponds Cowal 0.35M oz and deposits Forbes Bathurst 3M oz Younger granites Monzonit

  4. Slide 4: Central West NSW Projects

    Dubbo Bodangora Central West Tomingley Dubbo Wellin gton Wellington NSW Peak Hill Rockley Gulgong Volcanic Projects Junee Mo long Volcanic Belt Na rrowmine Belt Volcanic Parkes Belt Molong Orange Cudal Bathurst Forbes Moorilda Younger granites Monzonitic intrusions Ordovician arc volcanics Fifield c

  5. Slide 5: Peak Hill Gold Mine

    PEAK HILL GOLD MINE PIT NOV 2002 LKANE

  6. Slide 6: Peak Hill Cross Section

    Peak Hill Cross Section PRD 2, 5, 6 LKANE

  7. Slide 7: Peak Hill Gold Mine

    PEAK HILL GOLD MINE High Sulphidation Epithermal Gold Copper System (Ordovician) Conventional Open Cut Mining, Agglomeration Heap Leach Dump Leach of Oxidised Cap Production Commenced 1996 at Capital Cost $5 million Mined 3.385Mt @ 1.91 g/t Au and 1.499Mt @ 0.78 g/t Au 1996-2004 Output 152,000 ounce

  8. Slide 8: Tomingley Gold Project Regional Outcrop Geology

    Tomingley Gold Project Regional Outcrop Geology Cover Wyoming Three Hervey Group Wyoming One Myalls United Dulladerry Rhyolite Yeoval Granite Forbes Group Mungincoble Chert Cotton Formation Goonumbla (Mingelo) Volcanics LKANE

  9. Slide 9: Tomingley Gold Project: Wyoming History

    TOMINGLEY GOLD PROJECT Wyoming History Acquisition: Separate production royalties Compass March 2001; Golden Cross August 2001; Climax January 2004 Area: 366km2 Drilling: First intercept May 2001 – Wyoming One 2001 – 13,939m (223) - exploration 2002 – 24,871m (279) – evaluation - Wyo Three discov Ju

  10. Slide 10: Wyoming Geological Summary

    Wyoming Geological Summary Pelitic sediments Feldspar porphyry Feldspar porphyry, strongly sheared Volcaniclastic sediments Chlorite-talc schist Mineralisation LKANE

  11. Slide 11: Wyoming One Simplified Interpretation Structure

    Wyoming One Simplified Interpretation 376 Structure Pelitic sediments Volcaniclastic sediments Feldspar porphyry 200m RL (-70m) Feldspar porphyry 100m RL (-170m) Feldspar porphyry 0m RL (-270m) LKANE

  12. Slide 12: Wyoming One East-West Section

    Wyoming One East - West Section 6393350mN Alluvium Volcaniclastic sediments Feldspar porphyry Volcaniclastic conglomerate Mineralisation LKANE

  13. Slide 13: Wyoming One North-South Section

    Wyoming One North – South Section 614075mE Alluvium Volcaniclastic sediments Feldspar porphyry Mineralisation LKANE

  14. Slide 14: Wyoming One 3D Model

    Wyoming One 3D Model LKANE

  15. Slide 15: Tomingley Gold Project Resource Summary

    TOMINGLEY GOLD PROJECT Resource Summary Wyoming One and Three Dec` 03 0.75g/t / 1.00g/t / 3.00g/t gold cut off Measured 4.835 mt @ 2.24g/t gold 348,350 oz 70% Indicated 1.025 mt @ 2.76g/t gold 91,000 oz 18% Inferred 0.520 mt @ 3.49g/t gold 58,500 oz 12% TOTAL(0.75) 6.380 mt @ 2.43g/t gold 497,850 oz

  16. Slide 16: Wyoming Development Summary

    TOMINGLEY GOLD PROJECT Wyoming Development Summary Pre-feas study: 1Mtpa open pits – CIL recovery -> 60-70,000ozs Base case not financially robust due to overburden - needs additional open pit ore feed Current program: Remodelling of ore system to increase o/p grade Examine u/g options based on high

  17. Slide 17: Wyoming One High Grade Ore Shoot Targets

    Wyoming One High Grade Ore Shoot Targets 376 Structure Pelitic sediments Volcaniclastic sediments Feldspar porphyry 200m RL (-70m) Feldspar porphyry 100m RL (-170m) Feldspar porphyry 0m RL (-270m) High grade targets LKANE

  18. Slide 18: Wyoming One Hangingwall

    Wyoming One Hangingwall gram/metre contours Recent hole LKANE WY 811D to be completed

  19. Slide 19: Wyoming One '376' Structure

    Wyoming One ‘376’ Structure gram/metre contours Recent hole WY 821D to be completed LKANE

  20. Slide 20: Tomingley Gold Project Current Regional Exploration

    Tomingley Gold Project Current Regional Exploration LKANE

  21. Slide 21: Bodangora Wellington Project Location

    Bodangora Dubbo Bodangora Wellington Wellin gton Wellington Rockley Project Gulgong Volcanic Belt Mo long Location Junee Na rrowmine Volcanic Parkes Volcanic Belt Belt Orange Forbes Bathurst Younger granites Monzonitic intrusions Ordovician arc volcanics Fifield complexes LKANE

  22. Slide 22: Bodangora Wellington Regional Geology

    Bodangora Wellington Comobella 18m 18m@ @0.95g/t 0.95g/tAu, Au,0.15%Cu 0.15%Cu Regional EL4022 450m 450mxx150m 150mAu Au++Cu Cu Geology Bodangora Bodangora 0.2M oz target +0.5M oz Great Australian Basin Permian sediments EL5493 Wellington Federal Carboniferous granite Devonian – Silurian sediments a

  23. Slide 23: Wellington Project Galwadgere Geological Interpretation

    Wellington Project Galwadgere Geological Interpretation with Proposed Resource Drill Holes LKANE

  24. Slide 24: Wellington Project Galwadgere RC Drill Holes

    Wellington Project Galwadgere May 2004 RC Drill Holes LKANE

  25. Slide 25: Galwadgere Prospect Diagrammatic Long Section

    Galwadgere Prospect Diagramatic Long Section GAL008 GAL00847m 47m@@0.90% 0.90%Cu Cu1.58g/t 1.58g/tAu Au incl 9m @ 0.97% Cu 6.94g/t Au incl 9m @ 0.97% Cu 6.94g/t Au GAL GAL006 00626m 26m@@1.09% 1.09%Cu Cu0.26g/t 0.26g/tAu Au GAL GAL005 00517m 17m@@0.96% 0.96%Cu Cu0.18g/t 0.18g/tAu Au G040 G0400.25m 0

  26. Slide 26: Galwadgere Resource Potential

    WELLINGTON PROJECT Galwadgere Resource Potential Previous Resources } 6.0Mtonnes @ 1.00%Cu (60,000t Cu) + ? Au (Non-JORC) to 150m} 1.7Mtonnes @ 1.66%Cu (28,200t Cu) + ? Au 1.00% @ US$1.25/lb and A$0.70 is A$40/t, equivalent to 2.26g/t Au ($550/oz) 6.0Mt @ 1.00%Cu = 436,000 ounces of gold 1.50% @ US$

  27. Slide 27: Current Galwadgere Program

    WELLINGTON PROJECT Current Galwadgere Program Drilling: 3,000m RC to test ore system over strike length of 400m and to depth of 150m by end October 50m sections to Indicated Resource status Further drilling scheduled depending upon results Data compilation and target definition High resolution aerom

  28. Slide 28: Bodangora Mine Historic Workings & Drill Targets

    Bodangora Mine Historic Workings & Drill Targets Bodangora South Bodangora Mine Historic 200,000 oz Surface workings – limited drilling ? Target + 0.5 million oz LKANE

  29. Slide 29: Central West Conceptual Development

    Wyoming 1 & 3 Bodangora 500,000 ozs Dubbo Central West Dubbo Historic 0.2M oz Target +0.5Moz Conceptual Tomingley Peak Hill Wellington Hub Wellin gton Peak Hill Rockley Development Gulgong Galwadgere Volcanic Belt +60,000t Cu Northparkes Mo long Hubs Peak HillJunee Sulphide Na ozs 450,000 rrowmine V

  30. Slide 30: Dubbo Zirconia Project Summary

    DUBBO ZIRCONIA PROJECT SUMMARY • One of the worlds largest zirconium, yttrium and tantalum resources (+ 100 million tonnes) - also contains significant niobium and rare earth elements • Project based upon large Jurassic aged alkaline volcanic complex with highly metal enriched vertical trachyte intr

  31. Slide 31: Dubbo Zirconia Project Site and Infrastructure Location

    DUBBO ZIRCONIA PROJECT Project Site and Infrastructure Location

  32. Slide 32: Dubbo Zirconia Project Resources

    DUBBO ZIRCONIA PROJECT RESOURCES Measured Resource : 35.7 million tonnes grading 0 - 55 metres 1.96% Zr02, 0.04%HfO2, 0.14% Y 2O3 0.46% Nb2O5, 0.03% Ta2O5 and 0.75% REO Inferred Resource : 37.5 million tonnes at similar grades 55 - 100 metres TOTAL : 73.2 million tonnes LKANE

  33. Slide 33: Dubbo Zirconia Project Process Flow Sheet

    DUBBO ZIRCONIA PROJECT PROCESS FLOW SHEET LKANE LKANE

  34. Slide 34: Mini Pilot Plant - Roaster

    DUBBO ZIRCONIA PROJECT Mini Pilot Plant - Roaster

  35. Slide 35: Mini Pilot Plant - SX Circuit

    DUBBO ZIRCONIA PROJECT Mini Pilot Plant - SX Circuit

  36. Slide 36: Structure of the Zirconia Industry

    DUBBO ZIRCONIA PROJECT Structure of the Zirconia Industry RAW MATERIALS PROCESSED PRODUCTS END USES BADDELYITE ZIRCONIA PRODUCTS (Generally increasing purity) (5000 tonnes) FUSED Refractories ZIRCONIA Ceramic Pigments CHEMICAL Glass/Gemstones PURIFICATION Catalysts ZIRCON Oxygen Sensors SOFC (60000

  37. Slide 37: Niobium Tantalum Market

    DUBBO ZIRCONIA PROJECT Niobium Tantalum Market Niobium 1991 - 19,000t 2001 - 30,000t 90% Brazil Uses: 90% HSLA Steels Other: Superalloys - aerospace and gas turbines Optical glass, ceramic capacitors, superconductors (MRI etc) Tantalum 1991 - 625t 2001 - 2,000t 30% W.A. Uses: 60% Electronics -- cera

  38. Slide 38: Yttrium - Rare Earth Market

    DUBBO ZIRCONIA PROJECT Yttrium - Rare Earth Market Y/REE’s 1991 - 30,000t 2001 - 80,000t China 80% Catalyst/Chemicals 30% - auto and petroleum, fertilisers Metallurgical 35% - hsla steels, alloys, batteries Glass/Ceramics 15% - specialty glasses, stabilized zirconias, pigments Electronics/Magnets 20

  39. Slide 39: Dubbo Zirconia Project Current Summary

    DUBBO ZIRCONIA PROJECT Current Summary Development joint venture signed with Astron Limited October 2003 Astron is ASX listed with major zirconia, zirconium chemicals production in north east China. Currently produces 25% of world output. Astron’s financials for 2003/04: A$15.6m atp on A$105m turnov

  40. Slide 40: Western Australian Project Locations

    WESTERN AUSTRALIAN MT KEITH PROJECT LOCATIONS McDONOUGH LOOKOUT MIRANDA 9m 9m@ @0.51% 0.51%Ni Ni WELL 0.15m 0.15m@@2.9% 2.9%NiNi 0.2m 0.2m@@8.1% 8.1%Ni Ni NULLAGINE 10km 10kmkomatiite komatiite LEINSTER DOWNS Four Fourchannel channelzones zones 0.5-1.0% 0.5-1.0%Ni Niover over+m+m LKANE

  41. Slide 41: Alkane Strategy 2004-06

    ALKANE STRATEGY 2004-06 Strategic focus on Central West Region in New South Wales with the aim of developing a resource inventory and substantial production output GOLD: To build a 100,000 oz per year (or equivalent) output based upon production from Wyoming, Galwadgere and Bodangora, and possibly O

  42. Slide 42: Thank you

    LKANE EXPLORATION LTD ABN 35 000 689 216 A regionally focussed miner and explorer with a multi commodity approach to cash flow, profits and dividends Thank you

Alkane Exploration — NSW Miners and Explorers Conference 2004 on 6ix