Global Battery Metals Ltd. · TSXV:GBML
Global Battery Metals — Investor Presentation (April 2023)
16 slides from Global Battery Metals's investor presentation, April 2023
Slide 1: Value Creation Through Exploration and Development of Lithium and Battery Metal Projects
VALUE CREATION THROUGH EXPLORATION AND DEVELOPMENT OF LITHIUM AND BATTERY METAL PROJECTS TSX.V: GBML OTCQB: REZZF FSE: REZ April 2023
Slide 2: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS Forward-Looking Information Certain Other Information Except for statements of historical fact, this presentation contains certain “forward-looking information” or “forward-looking Certain information in this presentation was obtained from third party statements” within th
Slide 3: Investment Thesis
INVESTMENT THESIS Lithium demand is outpacing supply and growing at a faster rate. As this gap continues to widen, GBML will capitalize on clean energy transition opportunities with its growth-oriented portfolio of battery metals projects. Focused on Tier 1 Prospective Experienced Jurisdictions Port
Slide 4: Current Portfolio
CURRENT PORTFOLIO 1. Leinster (County Wicklow, Ireland) • Hard rock lithium-bearing pegmatite project, nearby Ganfeng / ILC asset • Focus on Knockeen Prospect. Potential discovery of up to six LCT pegmatite dikes 1 Lithium • Drill permit submitted. Assay results ranging up to 3.75 % Li2O / 17,000 3
Slide 5: Leinster
1 LEINSTER Hard Rock Lithium Project in Ireland SUMMARY Property Pre-resource hard rock spodumene-bearing pegmatite project County Wicklow & South County Carlow, Ireland - adjacent to Ganfeng / Astur A-B-C Astur F Location International Lithium Corp 16 prospecting licenses - 130,719 acres – focus on
Slide 6: Leinster: December 2022 Follow-Up Sampling Highlights
1 LEINSTER December 2022 Follow-Up Sampling Highlights – Knockeen Prospect • Grades as high as 3.75% Li2O / 17,000 ppm Li • 20 of 56 Samples Graded Above 2% Li2O Sample_ID Li_ppm Li2O%* AES63003 17,410 3.75 AES63033 16,860 3.63 AES63519 13,160 2.83 AES63015 13,050 2.81 AES63029 12,920 2.78 AES63042
Slide 7: Leinster: Spring 2023 Drill Targets
1 LEINSTER Spring 2023 Drill Targets – Knockeen Prospect • Detailed deep overburden (base of till) program was completed for a total of 373 samples covering an area of 600m x 450m over the location of an extensive spodumene pegmatite float boulder train and an associated historically reported trench
Slide 8: Leinster: Upcoming Catalysts
1 LEINSTER Upcoming Catalysts Completed 2021 Completed 2022 In Progress 2023 ü 12.5km ground Mag survey complete. ü Target prospecting at Knockeen & Carriglead • Drilling permit application has been completed. submitted. Drill holes are planned to test to ü Deep overburden soils with Li/Ta/Cs a dept
Slide 9: Lithium King
2 LITHIUM KING Drill-Ready Lithium Brine Project in Utah N SUMMARY Property is at the south end of a trend of high Li in water wells. Paleozoic basement is 700-1,200 m depth N Property Pre-resource lithium bearing brine aquifer project Pilot Valley on the west margin of Bonneville Salt Flats, Utah ~
Slide 10: Lithium King: Value Creation
2 LITHIUM KING Value Creation Completed In Progress 2023 Planned Timing TBD ü Locate and digitize existing oil well data to help • Maiden drill program targeting Spring 2023 start. Drilling • Once drilling has been completed and assay with basin modelling. permit has been granted. Drilling will test
Slide 11: La Poile
3 LA POILE Hard Rock Lithium Project in Newfoundland SUMMARY Property Pre-resource hard rock lithium-bearing pegmatite project Location Newfoundland near the Golden Hope Project Land Package 19,768 acres consisting of 320 claims Sokoman Infrastructure Helicopter access KEY HISTORICAL RESULTS • Sokom
Slide 12: Lara Copper Asset
4 LARA COPPER ASSET Through Minas Dixon, GBML’s 55 percent-owned Peruvian TERMS subsidiary, GBML has granted Minsur the option to acquire Milestone/Date Option Payments ($US) the property. Upon Registration of the Agreement 59,000 before Public Notary (PAID) One year from Registration of the 200,000
Slide 13: Exploration Status
EXPLORATION STATUS Lithium King Leinster La Poile Lara Phase 1: Acquire Claims Ongoing - Phase 1 Phase 2: Mapping and Sampling Complete Knockeen Prospect Phase 3: Prospecting, Magnetics & Geochemistry (Northern Claim Blocks Ongoing) Permit Application Phase 4: Drill Targets & Drill Planning Submitte
Slide 14: Capitalization & Ownership
CAPITALIZATION & OWNERSHIP Market Capitalization Share Structure Capital Structure Share Price (March 31, 2023) Shares Outstanding Cash C$0.17 68.9M $1.1M 52 Week Range Options & Warrants Debt C$0.33-C$0.08 17.3M nil GBML 6 Month Price Chart 22% Basic Shares 5% Options Warrants 73% TSX.V: GBML OTCQB
Slide 15: Team
TEAM Michael Murphy, BA, MBA, MSc., ICD Alan F. Matthews, C.Eng. President, CEO, Director Director Entrepreneurial mining executive, experienced company Executive mining engineer, technically-proficient builder, proven capital markets track record. Founder of company founder and director. Over 45 ye
Slide 16: Contact
CONTACT Michael Murphy President & CEO mm@gbml.ca TSX.V: GBML OTCQB: REZZF FSE: REZ
Global Battery Metals — Investor Presentation (April 2023) on 6ix