    Table of Contents 1 Adani Portfolio – Overview 2 Adani Green Energy Limited – Company Profile 3 Adani Green Energy Limited - Business Philosophy 3a Strategic Sites & Evacuation 3b Engineering, Procurement & Construction 3c O&M Capabilities 3d Capital Management Philosophy 4 Adani Green Energy Limite

  3. Slide 3: Adani Portfolio - Overview

    01 Adani Portfolio - Overview STRICTLY CONFIDENTIAL

  4. Slide 4: Adani: A World Class Infrastructure & Utility Portfolio

    Adani: A World Class Infrastructure & Utility Portfolio ~USD 150 bn1 Combined Market Cap Infrastructure Portfolio Incubator Energy & Utility Transport & Logistics Direct to consumer Other businesses (74.9%) (61.3%) (74.9%) (63.8%) (100%) (44%) AGEL ATL APSEZ AWL AEL NQXT2 Renewables T&D Ports & Logi

  5. Slide 5: Decades long track record of industry best growth rates across sectors

    Adani: Decades long track record of industry best growth rates across sectors Port Cargo Throughput (MMT) Renewable Capacity (GW) Transmission Network (ckm) CGD7 (GAs8 covered) 45% 12% 132% 20% 3x 5x 3x 30% 1.5x 4% 7% 25% Industry Adani APSEZ Industry AGELAdani Industry ATL Industry AGL 2014 972 MMT

  6. Slide 6: Repeatable, robust & proven transformative model of investment

    Adani: Repeatable, robust & proven transformative model of investment Phase Development Operations Post Operations Origination Site Development Construction Operation Capital Mgmt • Site acquisition • Engineering & design • Redesigning the capital structure Activity • Analysis & market • Life cycle

  7. Slide 7: AGEL: Replicating Group's Simple yet Transformational Business Model

    AGEL: Replicating Group's Simple yet Transformational Business Model Secure Sites & Connectivity Resource Assessment Construction Readiness Development ~2,00,000 acres ~40 GW potential Geotechnical studies Resource rich Sites in strategic locations 85+ Wind data locations and detailed design plannin

  8. Slide 8: Adani & TotalEnergies Renewable Partnership

    Adani & TotalEnergies Renewable Partnership Adani and TotalEnergies have a long-term partnership and commitment to expanding the renewable footprint through AGEL – Amongst Largest infrastructure and real asset platform with deep – One of the largest energy players in the world with presence across e

  9. Slide 9: Adani Green Energy Limited (AGEL): Company Profile

    02 Adani Green Energy Limited (AGEL): Company Profile STRICTLY CONFIDENTIAL

  10. Slide 10: AGEL at a glance

    AGEL at a glance Adani Family 61.3% 20% 18.7% Public Shareholders 50% 50% 100 % 100 % 100 % AGE23L 1 Other Operating 2 Locked-in Under Execution Near construction 2,353 MW 3,057 MW 5,524 MW 9,350 MW portfolio: 20,284 MW 2 Large 5,410 MW – Operational 2 89% Resource and 12 resource-rich states Renewa

  11. Slide 11: Growth, Cash Flow and Distribution capability Derisked

    Growth, Cash Flow and Distribution capability Derisked Assets contracted under 25 year PPA, 89% of contracted capacity on fully built basis is contracted to sovereign / sovereign equivalent counterparties Development risk to reduce with increasing proportion of Operating Capacity (total locked-in po

  12. Slide 12: Track record of high growth with actual performance higher than projections

    Track record of high growth coupled with actual performance consistently higher than projections AGEL has consistently outperformed projections for its operational assets Restricted Group 1 (930 MW) – EBITDA (Projected vs. Actual) Restricted Group 2 (570 MW) - EBITDA (Projected vs. Actual) Projected

  13. Slide 13: India: A Resource Rich Country supported by Visionary Government Policy

    India: A Resource Rich Country supported by Visionary Government Policy India has the highest average solar irradiation in leading markets Solar Resource: Solar Irradiation (kWh/m2) • 5,000 trillion KWh solar radiation is incident per year • Rajasthan has the highest intensity of radiation (6.4- 5.1

  14. Slide 14: Industry backed by stable and evolved Regulatory Framework

    Industry backed by stable and evolved Regulatory Framework Government target of 500 GW renewable capacity by 2030 Ministry of Power Empowered CEA Tariff Determination Methodology (MOP) Committee Participants/Statutory bodies under Electricity Act, 2003 Section 63 (Competitive bidding) – To regulate

  15. Slide 15: Adani Green Energy Limited: Business Philosophy

    03 Adani Green Energy Limited: Business Philosophy STRICTLY CONFIDENTIAL

  16. Slide 16: Business Philosophy focusing on De-risking at every stage of project lifecycle

    AGEL: Business Philosophy focusing on De-risking at every stage of project lifecycle DE-RISKING AT EVERY STAGE Site and Evacuation Project Execution − ~40GW of strategic sites with geotechnical, − PMAG - Central team with deep experience resource analysis & design work done − Example: Execution of 6

  17. Slide 17: 3a. Strategic Sites & Evacuation

    3a. Strategic Sites & Evacuation

  18. Slide 18: Approach to lock in strategic location by aggregating strategic sites

    Approach to lock in strategic location by aggregating 5 year forward strategic sites Systematic Approach to identify resource rich sites in order to de-risk projects Gather Site filtering Prioritization Micro-planning State wind and Priority projects Priority solar potential from public and XX # sit

  19. Slide 19: Construction Ready Strategic Sites with High Resource

    Construction Ready Strategic Sites with High Resource Identified high resource potential sites of ~2,00,000 acres in Rajasthan and Gujarat Rajasthan and Gujarat Clusters ~2,00,000 acres (Several sites) 40 GW Connectivity granted for entire ~2,00,000 Acres Of Land portfolio. Predominantly Owned By Fo

  20. Slide 20: Additional Sites under Development (10.5 GW)

    Additional Sites under Development (10.5 GW) Future Readiness with High Resource Potential sites in Maharashtra, Karnataka, Tamil Nadu Strategy to acquire Focus States Average CUF Barren Non-agricultural Maharashtra, Karnataka Solar DC CUF ~19%-21% Waste land Tamil Nadu Wind CUF ~40%+ ✓ Wind & Solar

  21. Slide 21: Case Study: Renewable cluster deployment in Rajasthan

    Case Study: Renewable cluster deployment of up to 15 GW in Rajasthan Site Development mostly de-risked 1.7 GW Hybrid projects PPA already secured, expected commissioning by July 2022 Stakeholder Good relations established with local Management administration helping smooth execution 600 MW Hybrid pr

  22. Slide 22: 3b. Engineering, Procurement & Construction

    3b. Engineering, Procurement & Construction

  23. Slide 23: Engineering – Core Strengths

    Engineering – Core Strengths In-House Design & Value Engineering Capability to Ensure Long-Lasting World-Class Asset In-house Engineering Optimization in Layout ▪ Strong design & engineering team of more than 125 ▪ Effective module placement for full utilization of available sites. engineering profe

  24. Slide 24: Supply Chain Management - Focused Strategic Sourcing & Process Excellence

    Supply Chain Management - Focused Strategic Sourcing & Process Excellence Robust Sourcing Capabilities for On time Deliveries & Execution Centralised Procurement • Maximization of Common Opex & Services ARCs, Procurement of Bulk & Objectives Common Capex and non-ARC Services Procurement Strategy • I

  25. Slide 25: Project Management & Assurance Group (PMAG) - End to End Project Integration

    Project Management & Assurance Group (PMAG) - End to End Project Integration Bidding, Project Development & Site Scouting Basic Engineering Execution Operations Concept Integrated Project Management Commissioning Strength: Team of 90 professionals having hands-on experience of above 2,000 man-years

  26. Slide 26: PMAG – Impact & Value Additions

    Project Management & Assurance Group (PMAG) – Impact & Value Additions Effective Seamless Project Delivery on Managing Priorities Project Governance Structure Time, Cost and returns Support Decision Making • Effective Project Management • Integrated Project Schedules ( Primavera) teams • Capex basel

  27. Slide 27: Case Study #1: Executed 33 Projects concurrently in 12 months

    Case Study #1: Executed 33 Projects (1.4 GW) concurrently in 12 months across 7 states • Portfolio of 33 projects with total capacity of 1.4 GWac Project • 100% capacity is contracted to sovereign / sub-sovereign Snapshot counterparties for 25 years 830 MW forms part of RG1 portfolio • Overall portf

  28. Slide 28: Case Study #2: Kamuthi Solar Power 648 MW

    Case Study #2: Kamuthi Solar Power 648 MW Ultra Mega Solar Power Plant Kamuthi Solar Power Plant megastructure exemplifies AGEL’s execution capabilities • AGEL developed the 648 MWac (778 MWdc), the world’s then largest solar power plant at a single location spread over 2,340 acres in Kamuthi, Tamil

  29. Slide 29: Case Study: India's largest Hybrid Cluster Development, Procurement & Construction

    Case Study: India’s largest Hybrid Cluster Development, Procurement & Construction

  30. Slide 30: 1,690 MW Hybrid Cluster Development

    1,690 MW Hybrid Cluster Development Strategically located near Jaisalmer, Rajasthan Project Snapshot Solar-Wind Hybrid Particulars Project 1 Project 2 Project 3 Total Under Implementation PPA Capacity (MWac) 390 600 700 1,690 390MW Solar (MWac) 360 600 600 1,560 600 MW Wind (MWac) 101 151 510 762 70

  31. Slide 31: 1,690 MW Hybrid Cluster Development - Site Origination

    1,690 MW Hybrid Cluster Development - Site Origination Stage 1: Site Origination fully de-risked well in advance Strategically identified Ideal location for both Solar & Wind Solar irradiation of 2000 kWh/ sqm – top 5 in India Perfect Solar potential map - Rajasthan location for Ideal Wind speed of

  32. Slide 32: 1,690 MW Hybrid Cluster Development - Site Development

    1,690 MW Hybrid Cluster Development - Site Development Stage 2: Site Development mostly de-risked ✓ Acquisition of 7,358 acres out ✓ Standardized site team Site team Land Acquisition total 10,294 acres land organization & deployment in deployment completed place ✓ Good relations established with Sta

  33. Slide 33: 1,690 MW Hybrid Cluster Development - Execution

    1,690 MW Hybrid Cluster Development - Site Development Stage 3: Execution in progress Detailed Supply Chain I II III Site Execution IV O&M readiness Engineering Management • Design Philosophy: Central Team • Strategic sourcing: Long term • Typical Common infrastructure • Learnings from past experien

  34. Slide 34: 3c. O&M Capabilities

    adani Renewables 3c. O&M Capabilities

  35. Slide 35: Technology Enabled Operational Excellence

    Technology Enabled Operational Excellence – AGEL operating assets currently spread across 12 states and 60 locations. Portfolio managed by O&M team of 630 personnel – Cluster based operating model enabling smooth governance and efficient utilization of manpower and spares: Personnel spread across Ce

  36. Slide 36: Visibility from Portfolio Level to Module level

    Visibility from Portfolio Level to Module level Solar Data Analytics – Full Solar Portfolio to one String / 22 module level visibility 1 2 3 Power vs Irradiation trend – Block (5 MW) Power vs Irradiation trend Power vs Irradiation trend 116 Inverter / 20K+ modules Portfolio (4,763 MW) Plant (50/ 20

  37. Slide 37: 2D Map Array Layout of Solar Plant with Identified Modules

    2D Map Array Layout of Solar Plant with Identified Modules ENOC allows to pinpoint the modules with low performance resulting in actionable insights 37

  38. Slide 38: Early Identification of low performing inverters

    Early Identification of low performing inverters 1 High Performing – Inverter Performance Inverter Ratio (PR) report sent to all the sites on daily Identification basis +0.35% Aug ’20 of low – Lowest performing Sep ’20 1148 1152 performing inverters are identified Inverters… and addressed. Inverter

  39. Slide 39: Drone-based Aerial Thermography - Early detection & Correction

    Drone-based Ariel Thermography - Early detection & Correction of Problem Areas Drone-based Aerial Thermography Equipment Thermography Early detection of thermal hotspots helps avoiding a major breakdown Drone-based aerial thermography to detect significant Equipment thermography of all the equipment

  40. Slide 40: Granular CUF Waterfall to identify Generation losses

    Granular CUF Waterfall to identify Generation losses Traditional Approach ENOC – Gap identification at granular level Solar 3.70% 27.53% 4.25% 0.13% 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.48% 0.00% 0.14% 27.53% 23.83% 23.83% 0.01% 0.03% P50 CUF Gap Actual CUF P50 CUF Full Ramp Grid Radiation Plant AC

  41. Slide 41: 3d. Capital Management Philosophy

    3d. Capital Management Philosophy

  42. Slide 42: Replicating Adani Group Business Model: Capital Management Philosophy

    Replicating Adani Group Business Model: Capital Management Philosophy De-risking of underling SPVs to generate and release surplus cashflows for AGEL De-risking integrated in Capital Mgmt. throughout Project Project Financing Stabilization HoldCo. Financing Post-Stabilization Phase SPV level Phase l

  43. Slide 43: HoldCo Financing: Maiden HoldCo Green Bond Issuance by AGEL

    HoldCo Financing: Maiden HoldCo Green Bond Issuance by AGEL Cash Waterfall – AGEL raised USD 750 mn through Holdco bond issuance under the 144A / Reg S format with flexibility to raise additional USD 950 mn to fund future growth. FCFE 1 – All round participation from Real Money Investors, comprising

  44. Slide 44: Construction Financing: Fully Funded Growth through Construction Framework Agreement

    Construction Financing: Fully Funded Growth through Construction Framework Agreement – AGEL has signed up Construction Framework Agreement for under construction projects for US$1.35 bn with 12 international banks – Revolving capex facility: 1,690 MW hybrid projects funded as first set of projects,

  45. Slide 45: Takeout Financing: Established template of financing from debt capital markets

    Takeout Financing: Established template of financing from debt capital markets, replicable in future Summary cashflow waterfall of Risk Mitigants in-built in RG 2 typical green bond 1 Taxes and operating expenses – Standard project finance features – Clean first ranking security Robust Structural –

  46. Slide 46: Elimination of Liquidity Risk through Capital Management

    Elimination of Liquidity Risk through Capital Management Case Study - 570 MW RG2 Bond Issuance Restricted Group-2 comprises three SPVs, having total operational capacity of 570MWac which was created for USD 362.5 mn Green Bond issuance in October 2019. This was First Investment Grade USD Bond deal o

  47. Slide 47: Adani Green Energy Limited (AGEL): Investment Case

    04 Adani Green Energy Limited (AGEL): Investment Case STRICTLY CONFIDENTIAL

  48. Slide 48: AGEL: Key Investment Highlights

    AGEL: Key Investment Highlights – World class project execution with equipment sourced from tier 1 suppliers through strategic alliances Excellent execution – Central monitoring of all project execution by Project Management & Assurance Group track record – Track record of executing projects ahead o

  49. Slide 49: Disclaimer

    Disclaimer Certain statements made in this presentation may not be based on historical information or facts and may be “forward-looking statements,” including those relating to general business plans and strategy of Adani Green Energy Limited (“AGEL”),the future outlook and growth prospects, and fut

  50. Slide 50: Thank You

    Thank You

Adani Green Energy — Investor Presentation (March 2022) on 6ix