Gold Terra Resource Corp. · TSXV:YGT

Gold Terra Resource — Investor Presentation (October 2025)

26 slides from Gold Terra Resource's investor presentation, October 2025

  1. Slide 1: Multi Moz Potential in Yellowknife, NWT

    TSX.V: YGT | OTCQX: YGTFF | Frankfurt: TX0 Multi Moz Potential in Yellowknife, NWT LARGEST UNDER EXPLORED High Grade Gold Camp in Canada OCTOBER 2025 CORPORATE PRESENTATION www.goldterracorp.com

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement Statements contained in this presentation that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward- Looking Information") within the meaning of applicable Canadian securities legislation. Forward Looking Informa

  3. Slide 3: Cautionary Statement

    Cautionary Statement This presentation does not constitute an offer, advertisement or solicitation for the purchase of securities. Further, this presentation has been prepared by Gold Terra Resources Corp. (“Gold Terra”) management and does not represent a recommendation to buy or sell securities. I

  4. Slide 4: Corporate Snapshot

    Corporate Snapshot Gold Terra Capitalization (in Millions) Shares Outstanding 413.7 Options 9.7 Yellowknife Project Fully Diluted Shares 423.4 Top Shareholders +30% Analyst Coverage 4

  5. Slide 5: Proven Exploration & Mine Building Team

    Proven Exploration & Mine Building Team Gerald Panneton, Chairman & CEO Geologist with +35 years of Canadian and international experience. Founder, President & CEO of Detour Gold Corporation (2006-2013) Detour Lake project grew to over 16 Moz in reserves and within 30 Moz resources and Brought into

  6. Slide 6: Building Shareholder Value

    FOCUSED STRATEGY BUILDING SHAREHOLDER VALUE CAMPBELL SHEAR (CS) = 14 Moz @ 16-22 g/t YELLOWKNIFE 6th LARGEST HIGH GRADE GOLD CAMP (Timmins / KL / VD / RL ) INFRASTRUCTURE – Hydro Power, airport Yellowknife town of 23,000 / Low cost drilling (C$250/m) Con Mine Option = Brownfield Status Mining Lease

  7. Slide 7: Strategic Land Holdings

    Strategic Land Holdings 70km Campbell Shear Gold Mineralized System Yellowknife Gold Belt 1.8-Million Ounces Discovered 2022 Mineral Resource Estimate (MRE) 43-101 status Con Mine Option (CMO)Property • 109,000 Indicated Ounces • 432,000 Inferred Ounces 4 Deposits 20km north of town 1,207,000 Inferr

  8. Slide 8: 2025 / 2026 Priorities

    2025 - 2026 Drilling Priorities 2025 / 2026 Priorities Campbell Shear Target Con Mine Historical Resources of 650,000 @ 12 g/t Au Evaluation completed at various cut off grade Drilling to start in Q4 2025 Updated MRE in 2026 Preliminary Drilling Economic Surface to 700m Assessment below surface Nort

  9. Slide 9: Con Mine (1938-2003) Moz @ 16-20 g/Au

    Con Mine (1938-2003) 6 Moz @ 16-20 g/Au Workforce Hydro Power

  10. Slide 10: Focus on the Prolific Campbell Shear

    Focus on the Prolific Campbell Shear 2023 drilling focus was on Con Mine near surface where A 5 Moz the last MRE was the focus B 1 Moz Drilling Targets between surface and 500m vertical over 2km strike length: ▪ Yellorex North ▪ Yellorex Main Con Mine (1938-2003) Historic Production 1.0 Moz @ 20 g/t

  11. Slide 11: 2022 MRE

    2022 Drilling Near Surface = 1st MRE @ 6$ per oz Con Mine Option Property initial September 2022 MRE: UG Indicated 0.45 M tonnes averaging 7.55 g/t Au for 109,000 ounces contained gold UG Inferred of 2.0 M tonnes averaging 6.74 g/t Au for 432,000 ounces contained gold S N 2022 MRE 2026 –Q1 Drilling

  12. Slide 12: CS – Close up Long Section looking West

    CS – Close up Long Section looking West S Robertson Shaft C1 shaft N L 2300 feet L 3100 feet ? GxT gram*meters 5-20 20-50 60m Campbell Shear North Ext CS 50-100 ++100 Long Section -1900 m GTCM23-055 12.7 g/t over 1.7m GTCM25-056a CS intersection 12

  13. Slide 13: North Extension Drilling Target Projected on the Historic Mine Stopes of the Con Mine

    North Extension Drilling Target Projected on the Historic Mine Stopes of the Con Mine 13

  14. Slide 14: Underground Cross Section 7900 looking North

    Underground Cross Section 7900 looking North 14

  15. Slide 15: Hole GTCM23-055 core showing the Campbell Shear

    Hole GTCM23-055 core showing the Campbell Shear from 2102 to 2118 metres Including 12.63 g/t over 1.7m (quartz veining): 15

  16. Slide 16: New High-Grade Zones – Mispickel Area – North Belt

    New High-Grade Zones – Mispickel Area – North Belt 19 holes for 6,011 metres completed in 2022 (Not included in the last 2022 MRE) Extended gold mineralization in the Mispickel area with the addition of two new gold zones, MP-Ryan and Zone 14 (next slide for section) • GTWL22-002 = 19.00 g/t gold ov

  17. Slide 17: New MP Ryan Zone – Mispickel Area – Visible Gold

    New MP Ryan Zone – Mispickel Area – Visible Gold VG in GTWL22-002 VG in GTWL22-014 17

  18. Slide 18: Commitment to ESG

    Commitment to ESG Gold Terra is the recipient of the 2023 NWT MAX Environmental and Social Responsibility Award in recognition of exceptional efforts in supporting the 2023 NWT wildfire efforts Forward-Looking Community Relations Environmental • The City of Yellowknife Responsibility Engagement Plan

  19. Slide 19: 19

    19

  20. Slide 20: For more information, please contact

    For more information, please contact: Gerald Panneton Chairman & CEO gpanneton@goldterracorp.com Mara Strazdins Manager of Investor Relations Phone: 1-778-897-1590 | 604-689-1749 ext 102 Strazdins@goldterracorp.com www.goldterracorp.com TSX.V: YGT | OTCQX: YGTFF | Frankfurt: TX0

  21. Slide 21: Con Mine Option Property - Substantial Benefits To Unlock

    Con Mine Option Property - Substantial Benefits To UNLOCK Con Mine Option to purchase 100% Interest would have MAJOR BENEFITS • Mineral leases and surface rights. • Access to infrastructure, such underground openings and shafts, buildings, storage facilities Oct. 21, 2022, Technical Report and roads

  22. Slide 22: Timeline - Catalysts

    Timeline - Catalysts 2021-24 2025-26 2027 2028 2029 Con Mine opt DRILLING + up to PEA / PFS/ FS DEVELOPMENT PRODUCTION Spent + 11M $ 40,000 m PERMITTING & 35,000m Threshold of 2.0 Moz Gold 0% 20% 40% RISK 60% 80% 100% 0 50 100 150 200 250 300 350 400 CDN $ Spend to date 22

  23. Slide 23: 2025 Drilling: Wedge Hole 56A Intersects Campbell Shear

    2025 Drilling: Wedge Hole 56A Intersects Campbell Shear Cross section showing wedge hole GTCM24-056A drilled from master hole GTCM24-056, intersected the Campbell Shear from approximately 2,665 to 2,707 metres downhole 23

  24. Slide 24: Campbell Shear Model

    Campbell Shear Model High Grade (+ 30 g/t Au) bordered by pinching quartz vein systems with lower grade intersections No question we are in the Campbell Shear and more drilling is needed 24

  25. Slide 25: YGT's value of < US10/oz = really?

    Valuation & Proposed Operating Scenario YGT ‘s value of < US10/oz = really ? Con Mine site =+US$ 150 M infrastructure in place YEAR 1-6 = +100,000oz annual @ 6-9 g/t Au Con Mine Underground mining ramp access and C1 shaft Between surface and 700m depth (0.54 Moz) Crestaurum deposit 0.3 Moz @ 6 g/t o

  26. Slide 26: Expanding Mineral Resources

    Expanding Mineral Resources Contained Mineral Resources Ounces 1,800,000 109,000 7.6 g/t AU CON MINE 1,600,000 + 45% 432,000 CON 1,400,000 6.8 g/t AU @ 6$/oz 432,000 1,200,000 Potential Additional Ounces 1,000,000 Campbell Shear OUNCES + 800,000 Current Deep 1,207,000 1,207,000 600,000 YCG YCG drill

Gold Terra Resource — Investor Presentation (October 2025) on 6ix