Bonterra Resources — Investor Presentation (June 2023)
43 slides from Bonterra Resources's investor presentation, June 2023

Slide 1: Developing Québec's Next Gold Camp
Developing Québec’s NEXT GOLD CAMP Exploration and Development in the Urban-Barry Camp June TSX-V BTR2023 | OTCQX BONXF | FSE 9BR2 1

Slide 2: Forward-Looking Statements
Forward-Looking Statements In this presentation, forward-looking information pertains to, among other things: the goals for 2023, current estimates and assumptions underlying the 2021 MRE and Barry open pit PEA, including that the Barry open pit PEA relates to the 2021 MRE; projected production; sen

Slide 3: Executive Summary
Executive Summary Over 3 Moz of total gold resources across all categories 1 Underexplored camp with over 10 M oz discovered to date 2 Senior gold producer validation of camp with C$1.2 billion JV investment on neighboring project 3 Only operational mill in the region Valuation Discount Adding Value

Slide 4: Validation of the Urban-Barry Camp
Validation of the Urban-Barry Camp ► On May 2, 2023, Osisko Mining announced a 50/50 JV with Gold Fields on the Windfall gold project for a total of C$1.2 billion 1 ►Highlights of the JV are as follows: • Initial cash payment to Osisko Mining of C$300 million on signing (signed May 2, 2023) • Deferr

Slide 5: Validation of the Urban-Barry Camp
Validation of the Urban-Barry Camp ►“We are very pleased to be partnering with Osisko to bring the high-quality Windfall Project into production and believe that this will be the first mine of several in this partnership in a highly prospective region.” – Martin Preece (Gold Fields interim CEO) 1. F

Slide 6: CEO's Track Record
CEO’s Track Record ► Marc-Andre Pelletier joins with a strong track record as COO at Wesdome, where he led a team that increased production by ~110% driving a ~420% equity return from 2017 to 2021 Strong Returns to Shareholders Wesdome outperformed by ~420% from Wesdome GDXJ October 2017 to October

Slide 7: Location in the Abitibi Greenstone Belt
Location in the Abitibi Greenstone Belt ►Young and emerging camp, comparable to Val-d’Or 80 years ago BACHELOR PROPERTY 15,550 ha URBAN-BARRY PROPERTY 22,500 ha TSX-V BTR | OTCQX BONXF | FSE 9BR2 7

Slide 8: Strategic Land Position and Infrastructure
Strategic Land Position and Infrastructure ►Only operational mill in underexplored camp with over 10 M oz discovered to date 1 Bachelor Mill Complex BACHELOR PROPERTY 15,550 ha Bachelor-Moroy Project M&I 160 Koz Au @ 5.58 g/t Au* Inferred 104 Koz Au @ 5.31 g/t Au* * Combined MREs for Bachelor and Mo

Slide 9: Significant Existing Infrastructure
Significant Existing Infrastructure ► Fully operational 800 tpd mill on hydroelectric grid power being permitted for expansion to 1,800 tpd and an additional 8 million tonnes of tailings capacity ► Assay lab (~6,000 assays/month), three camps, two main roads and several core shacks Bachelor Mill Com

Slide 10: Timelines
Timelines 1 ► Two drill rigs turning at ~1,400 m/month to test regional targets, including the Duke property ► Mill expansion permitting process underway with COMEX 2 with provincial permits thereafter – expected in H2 2023 Drilling/MREs Permitting/Economic Studies/Development Project 2022 2023 2024

Slide 11: Timelines (cont.)
Timelines (cont.) 1 ► Ongoing technical review and exploration ramp permitting at Gladiator ► Technical/strategic review of Bachelor-Moroy complete– Placed on long-term care & maintenance Drilling/MREs Permitting/Economic Studies/Development Project 2022 2023 2024 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Slide 12: ESG Best Practices
ESG Best Practices ►Social and economic benefits made in a sustainable manner Economic Environmental Social ▪ Bonterra pays 44 employees and ▪ Taking every opportunity to reduce the ▪ Agreements in place with the CFNW and contractors with annual wages totaling environmental impact of our drilling an

Slide 13: Capital Structure
Capital Structure EV/oz of ~US$9 1 Strong shareholders Capital Structure C$ Wexford 19,9% Issued & Outstanding Shares 126.2M Agnico Eagle 7,3% Options 9.9M Fidelity 5,9% (Weighted average exercise price of C$1.15) Warrants None Stephens Inv. Mgmt. Fully Diluted Shares 135.3M Ruffer 4,6% (C$12M in pr

Slide 14: High Level Geology
HIGH LEVEL GEOLOGY TSX-V BTR | OTCQX BONXF | FSE 9BR2 14

Slide 15: Drill Rig Locations
Drill Rig Locations ►Two rigs drilling ~1,400 m/month focused on regional targets, including the Duke JV Legend Diamond Drill Location Duke JV (70% BTR / 30% OSK) Lac Barry JV (85% BTR / 15% GZZ) TSX-V BTR | OTCQX BONXF | FSE 9BR2 15

Slide 16: Regional Structures are Thought to be Key
Regional Structures are Thought to be Key ► Urban-Barry cross-regional corridors of structural decompression ► Regional structures are associated with deposits but also point to areas that need to be tested Panache Windfall Moss Quesnel Gladiator Barry TSX-V BTR | OTCQX BONXF | FSE 9BR2 16

Slide 17: Barry Project
BARRY PROJECT TSX-V BTR | OTCQX BONXF | FSE 9BR2 17

Slide 18: Barry Open Pit Overview
Barry Open Pit Overview Location Urban-Barry Camp, Quebec ESG Stage PEA ✓ Mineralization and waste rock is non-acid generating Type Open Pit (5.4:1 strip ratio) ✓ 35 new jobs created LOM Production Profile ~30 Koz per year @ AISC of US$1,065/oz ✓ Supported by local communities/stakeholders PEA Resou

Slide 19: PEA Highlights
PEA Highlights ► Barry open pit only PEA released, which outlines the fastest and cheapest potential production re-start $48.3 M* 43% 30 Koz 145.1 Koz After-tax NPV5% After-tax IRR Avg. Annual Gold LOM Gold US$1,600/oz Au Production Production (95% mill recovery) $22.1 M $21.3 M 2.0 Mt @ 5.4 : 1 Ini

Slide 20: Bachelor Mill Complex
Bachelor Mill Complex ► A key strategic asset for Bonterra ► Annual savings of ~$3 million by placing the Bachelor-Moroy underground infrastructure on long-term care and maintenance Bachelor Mill • Only operational mill in the region • 800 tpd capacity • Well maintained, low capex to re-start • Bein

Slide 21: Barry – Planview
Barry – Planview ►Plunging with ramp, pit shell and mined out areas Mineralized Zones D AB 800 H 1000 550 Mined out and Decline TSX-V BTR | OTCQX BONXF | FSE 9BR2 21

Slide 22: Barry – Section
Barry – Section ►Looking southwest Mineralized Zones D AB 800 H 1000 550 TSX-V BTR | OTCQX BONXF | FSE 9BR2 22

Slide 23: Barry – Long Section
Barry – Long Section ►Plunging with pit limits and mined out areas ►Resources: 675 m deep, potential for a multi million ounces Au deposit PEA pit limits • 675 m deep deposit • 2,040 ounces per vertical-meter Mineralized Zones D AB 800 H 1000 550 Pits TSX-V BTR | OTCQX BONXF | FSE 9BR2 23

Slide 24: Barry – Long Section
Barry – Long Section ►Recent infill and expansion drill results confirming grade and resource growth potential 24

Slide 25: Gladiator Project
GLADIATOR PROJECT TSX-V BTR | OTCQX BONXF | FSE 9BR2 25

Slide 26: Gladiator – Planview
Gladiator – Planview ►Topography, lake, shoreline and proposed exploration ramp and portal Portal Mineralized Zones MND MAIN NORTH SND SOUTH RIVAGE FW TSX-V BTR | OTCQX BONXF | FSE 9BR2 26

Slide 27: Gladiator – Section
Gladiator – Section ►Looking southwest Mineralized Zones MND MAIN NORTH SND SOUTH RIVAGE FW TSX-V BTR | OTCQX BONXF | FSE 9BR2 27

Slide 28: Gladiator – Long Section
Gladiator – Long Section ►Looking northeast Mineralized Zones MND MAIN NORTH SND SOUTH RIVAGE FW TSX-V BTR | OTCQX BONXF | FSE 9BR2 28

Slide 29: Gladiator – Resource Expansion
Gladiator – Resource Expansion TSX-V BTR | OTCQX BONXF | FSE 9BR2 29

Slide 30: Gladiator – Regional Targets
Gladiator – Regional Targets ►Airborne magnetics illustrate the potential of regional targets along strike ►Management plans on testing regional targets to follow up on historic results ►Other nodes of decompression within the corridor to be tested (similar to Gladiator) M&I 391,000 oz Au @ 8.61 g/t

Slide 31: Gladiator vs. Windfall Drilling Comparison
Gladiator vs. Windfall Drilling Comparison ► Drilling at Gladiator is only a fraction of what has been carried out at Windfall Bonterra Osisko Resources 1 Mining 2 Asset Gladiator Windfall Resource as of date Jun 2021 Aug 2022 Number of holes drilled* # 486 4,834 Drilling* metres 228,204 1,852,861 M

Slide 32: Bachelor-Moroy Project
BACHELOR-MOROY PROJECT TSX-V BTR | OTCQX BONXF | FSE 9BR2 32

Slide 33: Bachelor-Moroy – Long Section (Looking West)
Bachelor-Moroy – Long Section (Looking West) ► The decision has been made to place Bachelor-Moroy on long-term care and maintenance ► Selective drilling is planned at regional targets outside the resource area BACHELOR MINE MOROY PROJECT Recent Bulk Sample Mineralized Zones M1-Group M2 Group M4 M6 M

Slide 34: Bachelor-Moroy – MAG / TMI
Bachelor-Moroy – MAG / TMI ► Various regional target areas identified TSX-V BTR | OTCQX BONXF | FSE 9BR2 34

Slide 35: Bachelor-Moroy – Regional Targets
Bachelor-Moroy – Regional Targets ► Magnetic survey shows several regional targets that are expected to be followed up on ► Regional target proximity to the mill results in lower risk exploration strategy TSX-V BTR | OTCQX BONXF | FSE 9BR2 35

Slide 36: Presentation Summary
Presentation Summary CEO with a Successful Track Record of • Marc-Andre Pelletier was most recently the COO at Wesdome Gold Mines Ltd. where he was Building and Operating Gold Mines in the instrumental in the re-start of the Kiena Mine and contributed to the increase of production at the Abitibi Gre

Slide 37: Thank You!
Thank You! www.btrgold.com 37

Slide 38: Appendix – PEA Details
Appendix – PEA Details ►Past-producer status and existing infrastructure significantly reduces LOM OPEX and CAPEX LOM Details LOM CAPEX (C$ millions) Description Unit Value Capital Cost Description Initial Sustaining Total Total Tonnes Mined Mt 2.0 Tailings Management Area 2.4 18.1 20.5 Average Dilu

Slide 39: Appendix – PEA Sensitivity Analysis
Appendix – PEA Sensitivity Analysis ►Robust economics at US$1,600 gold (base case) with significant upside at current prices Description Unit Sensitivity to Gold Price Gold Price US$/oz $1,200 $1,300 $1,400 $1,500 $1,600 $1,700 $1,800 $1,900 $2,000 Pre-tax NPV5% C$M -4 12 27 42 57 72 88 103 118 Afte

Slide 40: Appendix – M&A Landscape
Appendix – M&A Landscape ►Not many high-grade single mine/project companies left in Canada ►Most have been acquired at premium valuations Source: Company reports and market data. Bonterra Claude Osisko Mining 2 Wesdome Great Bear Pretium Battle North Barkerville Integra Gold Richmont Resources 1 Res

Slide 41: Appendix – Management and Board
Appendix – Management and Board Marc-Andre Pelletier Cesar Gonzalez Pier-Elise Hebert-Tremblay President, CEO & Director Executive Chairman Chief Financial Officer Mr. Pelletier is a professional mining engineer with over 25 years of Mr. Gonzalez co-founded Sailfish Royalty Corp. and Ms. Hebert-Trem

Slide 42: Appendix – Mineral Resources
Appendix – Mineral Resources NI 43-101 Mineral Resource Estimate - June 2021 (see notes on last page) Tonnage Grade Contained Metal Category (000 t) (g/t Au) (000 oz Au) Gladiator Underground Measured - - - Indicated 1,413 8.61 391 Measured + Indicated 1,413 8.61 391 Inferred 4,174 7.37 989 Barry Op

Slide 43: Appendix – Mineral Resources Notes
Appendix – Mineral Resources Notes Model Parameters 1. CIM (2014) definitions were followed for Mineral Resources. 2. Bachelor and Moroy underground Mineral Resources are estimated at gold cut-off grades of 2.40 g/t or 3.0 g/t, domain dependent. Gladiator and Barry underground Mineral Resources are
Source: Internet Archive copy of btrgold.com
More decks from Bonterra Resources, Inc.
Investor Presentation (October 2026)35 slides · October 2026
Investor Presentation (October 2026)35 slides · October 2026
Investor Presentation (September 2026)32 slides · Sep 1, 2026
Investor Presentation (September 2026)32 slides · September 2026
Investor Presentation (July 2026)32 slides · July 2026
Investor Presentation (July 2026)32 slides · July 2026