Mkango Resources Ltd. · TSXV:MKA

Mkango Resources — Investor Presentation (November 2015)

27 slides from Mkango Resources's investor presentation, November 2015

  1. Slide 1: Mkango Resources

    MKANGO RESOURCES Spearheading development of Malawi’s Rare Earth Sector TSX-V: MKA RARE EARTHS FUTURE INNOVATION NOVEMBER 2015

  2. Slide 2: Disclaimer

    This presentation (the “Presentation”) has been prepared by Mkango Resources Ltd (the “Company” or “Mkango”) solely for its use at informational meetings relating to it or is being delivered for information purposes only to a limited number of persons. By attending the meeting where this Presentatio

  3. Slide 3: Forward-looking statements and qualified persons

    Group (Pty) Ltd., who is a “Qualified Person” in accordance with NI 43-101 and which was filed at www.sedar.com on November 6th 2014; and (iii) the press release dated November 9, 2015 in relation to the updated Pre-feasibility Study. All of the Qualified Persons referred to above are independent of

  4. Slide 4: Advanced Stage Rare Earth Project in Malawi

    Advanced Stage Rare Earth Project in Malawi  PRE-FEASIBILITY STUDY UPDATED NOVEMBER 2015  ONE OF FEW ADVANCED STAGE RARE EARTH PROJECTS  AMONGST THE LOWEST CAPEX IN THE SECTOR  SIGNIFICANT POTENTIAL TO OPTIMISE AND REDUCE COSTS  RESOURCE UPSIDE AND EXPANSION POTENTIAL CRITICAL FOR CONSUMER ELEC

  5. Slide 5: Consistent Delivery on Milestones

    Consistent Delivery on Milestones Key milestones: Executive Directors Jan 2010 Songwe Hill licence awarded (REE) Mr William Dawes, Chief Executive Officer & Co-founder Sept 2010 Thambani licence awarded (U, Nb, Ta, Zr) 13 years exploration and business development, 9 years mining finance; Jan 2011 M

  6. Slide 6: Corporate Information

    Corporate Information Capital Structure Directors & Share Price (8/11): C$0.03 Management Shares Outstanding: ~121M Warrants: 24.0M @ $0.20 34% 26.3M @ $0.05 Options: 6.3M Leominex Fully Diluted: ~178M (Private) Market Cap (8/11): ~C$3.6M Major Shareholders 21% Leominex 21% RESOC 14% Mkango Resource

  7. Slide 7: Rare Earths - Fundamental to China's Future Growth Plans

    Rare Earths - Fundamental to China’s Future Growth Plans Clean Energy - High End Manufacturing – New Materials EXPORT QUOTAS REPLACED DOMESTIC STOCKPILING WITH EXPORT LICENCING EXPORT TARIFFS BEING REPLACED SYSTEM BY OTHER FORMS OF TAXATION RARE EARTH PRODUCTION COSTS INCREASING – ENVIRONMENTAL, LAB

  8. Slide 8: REE Mix Geared to High Growth Magnet Applications

    REE Mix Geared to High Growth Magnet Applications Neodymium (756tpy); Dysprosium (35tpy); Praseodymium (227tpy); Terbium (7tpy) Permanent magnets CONSUMER ELECTRONICS CLEAN ENERGY REO in concentrate split by value Yttrium Lanthanum Gadolinium Cerium Europium 2% 5% 2% 1% 8% Terbium 3% Neodymium Dyspr

  9. Slide 9: Malawi – The Warm Heart of Africa

    Malawi – “The Warm Heart of Africa”  World class, underdeveloped rare earth mineral province – historically known carbonatite deposits, drilled by JICA/MMAJ in late 80s  Transport infrastructure  Multi-billion dollar Vale Tete- Nacala rail development  Road network  Power – significant regional

  10. Slide 10: Good Road Network, New Rail Line, Dry Port Planned

    Good Road Network, New Rail Line, Dry Port Planned 10

  11. Slide 11: Rail and Road Developments

    Rail and Road Developments Tete – Nacala railway line through Malawi Blantyre – Migowi road refurbishment 11

  12. Slide 12: Songwe Hill Rare Earth Deposit

    Songwe Hill Rare Earth Deposit  Most advanced REE project in Malawi  PFS updated November 2015  Broad zones of mineralisation  Long mine life, open pit operation  Easily leachable light and heavy REEs Summary of Key Outputs Total ore mined and processed (tonnes) 8,482,603 Average strip ratio 4.

  13. Slide 13: Mine Development – Potential Upside

    Mine Development – Potential Upside IN-PIT INFERRED RESOURCES CURRENTLY TREATED AS WASTE – POTENTIAL TO LOWER STRIP RATIO AND OPERATING COSTS, EXTEND MINE LIFE 13

  14. Slide 14: Significant Resource Upside - Open Laterally and to Depth

    Significant Resource Upside - Open Laterally and to Depth Area of mineralised outcrop with grab Current area of sampling and drill defined some historical Indicated and drilling Inferred Resource Estimate Stage 1 & 2 drill holes superimposed on thorium / potassium radiometrics 14

  15. Slide 15: PFS Identified Opportunities to Lower OPEX

    PFS Identified Opportunities to Lower OPEX Real Operating Costs Life of Mine Life of mine 2017-2021 2017-2021 US$/kg US$/t processed US$/kg US$/t processed Mining 4.1 23.5 3.0 21.1 Beneficiation 3.7 21.2 3.0 21.0 Hydrometallurgical 7.1 40.4 5.7 40.3 G & A / other 1.5 8.6 1.3 8.6 Cash Operating Cost

  16. Slide 16: Right Sized Project With Low Capex

    Right Sized Project With Low Capex  Infrastructure  Modular plant  Low strength acid, no kilns  Conventional technology  Initial modest scale  Chemical concentrate Publicly traded rare earth companies with pre-feasibility or feasibility study

  17. Slide 17: Summary

    Summary LOW CAPEX WITH SIGNIFICANT GROWTH OPTIONS CERIUM REMOVAL ENHANCES PRODUCT MIX MAGNET RARE EARTHS >80% OF PRODUCT VALUE STRONG TECHNICAL CAPABILITIES – INDUSTRY AND RESEARCH COLLABORATIONS CONVENTIONAL TECHNOLOGY WITH LOWER RISK DEVELOPMENT STRATEGY STAKEHOLDER RELATIONSHIPS – ESTABLISH

  18. Slide 18: Contact Details

    Contact Details William Dawes Alexander Lemon Chief Executive President will@mkango.ca alex@mkango.ca Mkango Resources Ltd. Calgary Office www.mkango.ca 259 Windermere Road SW Twitter: @MkangoResources Calgary, Alberta P + 44 207 3722 744 T3C 3L2 Canada 18

  19. Slide 19: Recent CSR Initiatives

    Recent CSR Initiatives 19

  20. Slide 20: Recent Corporate Social Responsibility initiatives

    Recent Corporate Social Responsibility initiatives boNGO Worldwide partnership  Happy Classrooms project  Enhancing 3 local primary schools  12 classrooms painted to date  Annual Scholarship programme to pay Secondary Education Fees for the top 6 students from 3 local primary schools Before - An

  21. Slide 21: Mkango donates items to flood victims

    12 BUSINESS THE DAILY TIMES, Thursday, January 29, 2015 Mkango donates K items to flood victi BY CAROLINE KANDIERO KANGO Resources, explorers of rare earth elements at Songwe Hill in Phalombe, has donated various items worth K6.2 million t0470 houscholds who were hit by floods some weeks ago around

  22. Slide 22: Rare earth prospector donates pigeon pea seed to farming families

    NEWS 8 INSIGHT danvary 20 MINING REVIEW MINING REVIEW Sousry 2015 NEWS & INSIGHT ¢ Rare earth prospector donates pigeon pea seed to 1,000 farming families Mkango aiming to introduce commercial farming to subsistence farming communities eango Iw the Songwe ava, cur ly farmers would beable tend poset

  23. Slide 23: Mineral Reserve and Resource Estimates

    Mineral Reserve and Resource Estimates 23

  24. Slide 24: Probable Mineral Reserve Estimate

    Probable Mineral Reserve Estimate 2014 Mineral Reserve Estimate  Conservative Mineral Reserve cut–off grade versus pay limit 1.0% TREO cut off grade (0.57% TREO) Tonnes (million) TREO (%) TREO (tonnes)  Mineral Reserve based on Probable 8.48 1.60 136,139 Indicated Resource only 2012 Mineral Resour

  25. Slide 25: In-situ Mineral Resource estimates at 1.0% TREO cut-off grade

    In-situ Mineral Resource estimates at 1.0% TREO cut–off grade1 In-situ Indicated Mineral Resource at 1% TREO Cut-Off Indicated Million La2O3 Ce2O3 Pr2O3 Nd2O3 Sm2O3 LREO Eu2O3 Gd2O3 Tb2O3 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 HREO TREO TREO Th U Tonnes ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm

  26. Slide 26: In-situ Mineral Resource estimates at different cut-off grades

    In-situ Mineral Resource estimates at different cut–off grades1 In-situ Indicated Carbonatite Mineral Resource Cut-Off Million La2O3 Ce2O3 Pr2O3 Nd2O3 Sm2O3 LREO Eu2O3 Gd2O3 Tb2O3 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 HREO TREO TREO Th U %TREO Tonnes ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm pp

  27. Slide 27: REO distribution at different cut-off grades

    REO distribution at different cut-off grades1 In-situ Indicated Carbonatite Mineral Resource - REO Distributions at 0.5%, 1.0% and 1.5% TREO Cut-Offs Cut-Off La2O3 Ce2O3 Pr2O3 Nd2O3 Sm2O3 Eu2O3 Gd2O3 Tb2O3 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 Total HREO %TREO % % % % % % % % % % % % % % % % % 0.

Mkango Resources — Investor Presentation (November 2015) on 6ix