Central Petroleum Limited · ASX:CTP
Central Petroleum — 2018 Rock Me Amadeus Energy and Battery Mineral Conference
8 slides from Central Petroleum's conference presentation, Mar 13, 2018
Slide 1: Rock Me Amadeus Energy and Battery Mineral Conference
SYDNEY MINING CLUB LUNCHEON 07/12/2017 For personal use only 2018 ROCK ME AMADEUS Energy and Battery Mineral Conference NOT FOR RELEASE OR DISTRIBUTION IN THE UNITED STATES
Slide 2: Highlights
HIGHLIGHTS For personal use only • MEREENIE • Drilling West Mereenie 26 • $12M Plant upgrade • PALM VALLEY • Drilling Palm Valley 13 • 5TJ/d existing plant capacity • OORAMINNA • Drilling Ooraminna 3 to determine deliverability • BREWER ESTATE & DINGO • Remote Operation • Plant upgrade to 5.5 TJ/d •
Slide 3: Mereenie Upgrade
MEREENIE UPGRADE • The Mereenie upgrade consists of: For personal use only • 3 new separators (already delivered to Mereenie) • Installation of separators • Re-stage of existing 2 compressors New Capital • Ordering and installation of new field booster compressor Investment Required Now • Refurbishm
Slide 4: Palm Valley
PALM VALLEY For personal use only • Re-open Palm Valley in second half with transfer of 5TJ/d existing contract from Mereenie New Capital • Had been producing at 5TJ/d before purchase of Mereenie Investment Required Now • Historical capacity of 20TJ/d but would require refurbishment and re-location
Slide 5: Drilling Programme
DRILLING PROGRAMME For personal use only • One Horizontal Well on Stairway Formation in the next 30 days • One Horizontal Well at Palm Valley to access natural fractures - optimal length subject to financing • Aim to triple Amadeus Reserves over the next 2 to 5 years if successful – subject to finan
Slide 6: Central Petroleum's Sales Gas Schedule
CENTRAL PETROLEUM’S SALES GAS SCHEDULE ACQ - Net to For personal use only Contracted (firm and non-firm) Central (TJ/day) Existing Contracts (Palm Valley / Mereenie) 13 Macquarie Pre-Sale (Palm Valley / Mereenie) 5 Existing Contracts (Dingo) 4 New 2019 GSA* 30 Residual Spot Sales (as available capac
Slide 7: Delivering New QLD Acreage – ATPA 2031
DELIVERING NEW QLD ACREAGE – ATPA 2031 For personal use only • 77km2 coal seam gas acreage awarded on 1 March 2018 by the Qld Government for Australian domestic gas supply • ATPA 2031 is located midway between Miles and Wandoan in the eastern Surat Basin • The permit lies within the north-eastern Wa
Slide 8: Notice and Legal Disclaimer
NOTICE AND LEGAL DISCLAIMER To the maximum extent permitted by law: For personal use only 1. This presentation is not intended for prospective investors and does not purport to provide all of the information an interested party may require in order to investigate the affairs of Central Petroleum Ltd
Central Petroleum — 2018 Rock Me Amadeus Energy and Battery Mineral Conference on 6ix