Robyg S.A. · GPW:ROB

Robyg — FY2024 Earnings Presentation

61 slides from Robyg's earnings presentation, March 2025

  1. Slide 1: Financial Results 2024

    Slide 1: Financial Results 2024

    Financial Results 2024 Warsaw, March 2025

  2. Slide 2: Agenda

    Slide 2: Agenda

    AGENDA PART 01 Summary PART 02 Sales results and revenue perspective PART 03 Financial results PART 04 Plans of ROBYG Group PART 05 ESG PART 06 Appendices 2

  3. Slide 3: Part 01: Summary 2024

    Slide 3: Part 01: Summary 2024

    ROBYG PART 01 Summary 2024

  4. Slide 4: Summary 2024: revenues and cash

    Slide 4: Summary 2024: revenues and cash

    01. Summary 2024 Financial Results 2024 Revenues Strong cash position* Operating cash flow 1 301 mln PLN 363 mln PLN 497 mln PLN (excl. purchases of new plots) 4 * Including amounts kept on individual escrow accounts.

  5. Slide 5: Summary 2024: units and land bank

    Slide 5: Summary 2024: units and land bank

    01. Summary 2024 Developer & Preliminary Number of units under agreements signed: Total land bank units construction 1891 * 21 449 2 731 (net after cancellations) Units on offer Number of units recognised in revenues 1777 2331 (out of which 3% finished goods) 5 * Incl. 245 agreements in jointly cont

  6. Slide 6: Activities for other entities within TAG Poland

    Slide 6: Activities for other entities within TAG Poland

    01. Summary 2024 ROBYG Group’s activities for other entities within TAG Poland* Residential sales coordination General contractor services Revenue from services provided to Number of units contracted Number of units under construction other entities within TAG Poland in 2024: as of 31.12.2024: in 20

  7. Slide 7: Material acquisitions and financial activities

    Slide 7: Material acquisitions and financial activities

    01. Summary 2024 Gdynia Warsaw ROBYG Group – material acquisitions and financial activities New financing: NEW PLOTS 360 mln PLN approx. 1 .3 mld PLN A re a o f p lo ts [h a ] T y p e o f c o n tra c ts L o c a tio n s 0 ,1 F in a l T ró jm ia s to , Ś ró d m ie ś c ie ** C o n d itio n a l 1.5 W a

  8. Slide 8: Part 02: Sales results & revenue perspective

    Slide 8: Part 02: Sales results & revenue perspective

    P A R T 02 Sales results & revenue perspective 7

  9. Slide 9: Developer and preliminary agreements signed in 2024

    Slide 9: Developer and preliminary agreements signed in 2024

    02. Sales results & revenue perspective D e v e l o p e r a n d p r e l i m i n a r y a g r e e m e n t s s i g n e d i n 2 0 2 4 : 1 891* 4308 17% 100% -5 0 % 3471 -27% 27% 2957 2% 31% 2 8 0 9 10% 2520 2 5 6 9 -16% -3 3 % 22% 2333 2118 2156 2144 56% 1731 1891 9% 1019 1113 2011 2012 2013 2014 2015 2

  10. Slide 10: Agreements signed by city

    Slide 10: Agreements signed by city

    02. Sales results & revenue perspective 548 UNITS 29% GDANSK & GDYNIA Developer and preliminary agreements in 2024: 1 891* 171 1050 UNITS UNITS 9% 56% 9% POZNAN POZNAN WARSAW 6% WROCLAW 122 UNITS 29% GDANSK &GDYNIA 6% WROCLAW 56% WARSAW 9 * I n c l . 245 agreements in jointly controlled projects.

  11. Slide 11: Units on offer

    Slide 11: Units on offer

    02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e ROBYG Group – units on offer Number of units on offer FINISHED GOODS ON O F F E R : 3% 2297 112 1843 1777* 1729 1695 1579 99 49 58 205 39 58 2185 1744 1719 1524 1646 1540 1719** 3 Q 2023 4 Q 2023 1Q 2 0 2 4 2Q 2024 3Q 2024 4Q 2024 UUn

  12. Slide 12: Revenue recognition

    Slide 12: Revenue recognition

    02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e R O B Y G G r o u p – r e v e n u e r e c o g n i t i o n ( a s a t December 31st, 2024) Recognition potential of units in revenues: Number of units recognized in revenues (quarterly) Units not presold and not r e c o g n i z e d *: 1

  13. Slide 13: Units to be completed in 2025-2026

    Slide 13: Units to be completed in 2025-2026

    02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e Number of units to be completed in 2025-2026 and also (contracted) until December 31st 2024 Total & contracted 2024 2025 2026 2025+ 2 0 2 6 Total Total Total Total Contracted Contracted Contracted Contracted units units units units Mó

  14. Slide 14: Units to be completed in 2025

    Slide 14: Units to be completed in 2025

    02. S a l e s r e s u l t s & r e v e n u e p e r s p e c t i v e Number of units to be completed in 2025 G d a n s k & Gdynia Warsaw Wroclaw & Poznan Total no. of units to Total no. of units to be Total no. of units to be Project Project Project be completed in 2025 completed in 2025 completed in 2

  15. Slide 15: Units to be completed in 2026

    Slide 15: Units to be completed in 2026

    02. S a l e s r e s u l t & r e v e n u e p e r s p e c t i v e Number of units to be completed in 2026 G d a n s k & Gdynia Warsaw Wroclaw & Poznan Total no. of units to Total no. of units to be Total no. of units to be Project Project Project be completed in 2026 completed in 2026 completed in 202

  16. Slide 16: Part 03: Financial results

    Slide 16: Part 03: Financial results

    ROBYG 3 PART Financial results 16

  17. Slide 17: Financial results

    Slide 17: Financial results

    03. F i n a n c i a l r e s u l t s (PLNk) 2024 2023 Change Revenues 1 301 353 1 813 037 (28,22%) Sales of residential and commercial units 1 116 457 1 735 823 (35,68%) Revenues from services provided to related parties 166 513 15 798 954,01% Other revenues 18 383 61 416 (70,07%) Cost of sales (975

  18. Slide 18: Financial condition

    Slide 18: Financial condition

    03. F i n a n c i a l r e s u l t s Financial condition (PLNk) 2024 2023 Change Total assets, including: 3 565 598 3 291 950 8,31% Non-current assets, including: 1 003 056 724 258 38,49% Investment properties 680 224 453 200 50,09% Loans granted to related parties 147 714 153 274 (3,63%) Inventories

  19. Slide 19: Statement of cash flow

    Slide 19: Statement of cash flow

    03. F i n a n c i a l r e s u l t s Statement of cash flow (PLNk) 2024 2023 Net cash flows from operating activities, including: 64 028 515 656 Expenditures for the purchase of new plots (432 949) (154 417) Net cash flows from investing activities, including: (272 203) 25 523 Proceeds from JV partne

  20. Slide 20: Debt financing

    Slide 20: Debt financing

    03. F i n a n c i a l r e s u l t s Debt financing Nominal value and maturity of bank credit facilities and bonds as at December 31st 2024 (PLNm). DEBT - Aging <1 y e a r 1-2 years 2-3 years 3-4 years 4 - 5 years O v e r 5 years Total BANK CREDIT 109,75 148,36 150,00 0,00 0,00 0,00 408,10 FACILITIES

  21. Slide 21: Leverage and collections

    Slide 21: Leverage and collections

    03. F i n a n c i a l r e s u l t s Leverage and collections as at December 31st 2024 * Net debt ratio = net debt ** / equity ** N e t d e b t = i n t e r e s t b e a r i n g l i a b i l i t i e s + d e r i va t i ve s + g u a r a n t e e s N e t d e b t r a t i o * = 0,13 g r a n t e d – i n t e r

  22. Slide 22: Part 04: Plans of ROBYG Group

    Slide 22: Part 04: Plans of ROBYG Group

    PART 04 Plans of ROBYG Group 22

  23. Slide 23: Strategic goals

    Slide 23: Strategic goals

    04. Plans of ROBYG Group Strategic goals Residential sales in 2025 at the level of approx. 2 600 units* Increasing sales in the years ahead Maintaining of margins Expansion of activities in Warsaw, Wroclaw and Tricity Maintaining of the land bank level Realisation of the ESG strategy 23 * Incl. unit

  24. Slide 24: Strategy agreed with TAG

    Slide 24: Strategy agreed with TAG

    04. Plans of ROBYG Group Strategy Strategy for the operational and business activities of the ROBYG Group agreed with TAG Immobilien AG (hereinafter: "TAG") for all TAG activities on the Polish residential market, i.e. for the activities of the ROBYG Group and Vantage Development S.A. Areas ROBYG Gr

  25. Slide 25: Total land bank

    Slide 25: Total land bank

    04. Plans of ROBYG Group Total land bank 21 449** units + 1 777 units on offer = 23 226 units Gdansk&Gdynia Warsaw Wroclaw Poznan Number of Number of Number of Number of District % District % District % District % units units units units Ujescisko 190 4% Wilanow 800 7% Stare Miasto 299 16% Piatkowo

  26. Slide 26: Commercial potential

    Slide 26: Commercial potential

    04. Plans of ROBYG Group Commercial potential = 65 000 sqm of usable area Commercial potential = 65 000 sqm of usable area WROCLAW* WARSAW** 35 000 30 000 TOTAL: 65 000 sqm *Preliminary land purchase agreements. 26 ** Final agreement signed after 31.12.2024

  27. Slide 27: Part 05: ESG

    Slide 27: Part 05: ESG

    PART 05 ESG Creating people and planet friendly spaces 27

  28. Slide 28: ESG mission, values and directions

    Slide 28: ESG mission, values and directions

    05. ESG FOR SOCIETY AND ENVIRONMENT MISSION OUR VALUES DIRECTIONS “Our goal at ROBYG is to build homes and suitable surroundings for our clients. We develop homes CARE and housing developments for entire communities The protection of natural resources and that are integrated with the surrounding car

  29. Slide 29: The biggest ESG successes in 2024

    Slide 29: The biggest ESG successes in 2024

    05. ESG FOR SOCIETY AND ENVIRONMENT The biggest ESG successes in 2024 Development of a consolidated sustainability report in cooperation Voluntary assurance of the New methodology for calculating with TAG, in accordance with the sustainability report by an external CO2e emission intensity and launch

  30. Slide 30: Environmental dimension: ROBYG for Planet

    Slide 30: Environmental dimension: ROBYG for Planet

    05. ESG – Environmental dimension ROBYG FOR PLANET ROBYG for the Planet means that we lead a sustainable development process, and we fully respect the natural environment on all our projects. Strategic Goals 1. ROBYG as the number 1 low-carbon housing developer in Poland: • Continuation of reporting

  31. Slide 31: The Green Standard

    Slide 31: The Green Standard

    05. ESG – Environmental dimension ROBYG FOR PLANET THE GREEN STANDARD 15 minutes to Local estates green Pro-ecological Photovoltaic Smart House Solar In 2024, the Management Boards of ROBYG S.A. all important and recreation facilities rain gardens panels system in benches and Vantage Development S.A

  32. Slide 32: Social dimension: ROBYG for People

    Slide 32: Social dimension: ROBYG for People

    05. ESG – Social dimension ROBYG FOR PEOPLE For us, construction is part of the process of Strategic Goals creating new communities, which includes erecting buildings, developing infrastructure, shaping green areas, and creating spaces for 1. ROBYG Zero Accidents: zero serious and fatal accidents on

  33. Slide 33: Governance dimension: ROBYG for Sustainable Business

    Slide 33: Governance dimension: ROBYG for Sustainable Business

    05. ESG – Governance dimension ROBYG FOR SUSTAINABLE BUSSINES We act responsibly by choosing to partner with local businesses, caring for the natural environment and managing the company responsibly while delivering strong financial results. Sustainable governance also means that we communicate abou

  34. Slide 34: ESG

    Slide 34: ESG

    05. ESG All of us at ROBYG acknowledge how important sustainable growth is for the envirnomnent and society. So far we have done a lot, but we treat this is a journey that will involve over time. Thus, we are committed to continuing our work to constantly improve our performance and disclose it to t

  35. Slide 35: Part 06: Appendices

    Slide 35: Part 06: Appendices

    ROBYG PART Appendices 35

  36. Slide 36: Senior Management Team

    Slide 36: Senior Management Team

    06. Appendices Senior Management Team O s c a r K a z a n e ls on A rtu r C e g la rz D a riu s z P a w lu k ow ic z E y a l K e lts h M a rta H e ja k Chairman of the Supervisory Vice President, Vice President, President of the Board, CEO Vice President, CFO Board Head of Business Dev. Head of HR Y

  37. Slide 37: Ownership structure

    Slide 37: Ownership structure

    06. Appendices Ownership structure TAG Immobilien AG holds indirectly 100% of ROBYG S.A. shares. TAG Immobilien AG is a MDAX-listed (Frankfurt Stock Exchange) real estate company. 37

  38. Slide 38: TAG Immobilien AG

    Slide 38: TAG Immobilien AG

    06. A p p e n d i c e s TAG Immobilien AG consolidated financials (EURm) Financial data (mln EUR) 2024 2023 2022 2021 2020 2019 2018 Assets 7 750,25 7 299,80 8 214,60 7 088,60 6 478,00 5 647,00 5 033,30 Equi t y 3 099,85 2 964,50 3 307,70 3 129,50 2 681,50 2 394,20 2 048,30 E B I T D A (adjusted) 23

  39. Slide 39: Investments under construction (1)

    Slide 39: Investments under construction (1)

    06. Appendices Description of investments – under construction (1) Lawendowe Wzgórza / Osiedle Kameralne City Sfera Stacja Nowy Gdansk City: Gdansk City: Warsaw City: Warsaw District: Jasień District: Bemowo District: Włochy No. of stages: ca. 35 No. of stages: 8 No. of stages: 14 Stages completed:

  40. Slide 40: Investments under construction (2)

    Slide 40: Investments under construction (2)

    06. Appendices Description of investments – under construction (2) Young City 2 Modern City Jagodno City: Warsaw City: Warsaw City: Wroclaw District: Bemowo District: Bemowo District: Krzyki No. of stages: 4 No. of stages: 9 No. of stages: 10 Stages completed: 2 Stages completed: 4 Stages completed:

  41. Slide 41: Investments under construction (3)

    Slide 41: Investments under construction (3)

    06. Appendices Description of investments – under construction (3) Osiedle Życzliwa Praga Nadmotławie Estate Szumilas City: Warsaw City: Gdansk City: Gdansk (Kowale) District: Tarchomin District: Śródmieście No. of stages: 8 No. of stages: 9 No. of stages: 6 Stages completed: 7 Stages completed: 4 S

  42. Slide 42: Investments under construction (4)

    Slide 42: Investments under construction (4)

    06. Appendices Description of investments – under construction (4) Royal Residence Porto Początek Piątkowo City: Warsaw City: Gdansk City: Poznan District: Wilanów District: Nowy Port District: Piątkowo No. of stages: 7 No. of stages: 7 No. of stages: 8 Stages completed: 5 Stages completed: 3 Stages

  43. Slide 43: Investments under construction (5)

    Slide 43: Investments under construction (5)

    06. Appendices Description of investments – under construction (5) Sady Ursynów Rytm Mokotowa Praga Piano City: Warsaw City: Warsaw City: Warsaw District: Ursynów District: Mokotów District: Praga Południe No. of stages: 5 No. of stages: 4 No. of stages: 1 Stages completed: 1 Stages under constructi

  44. Slide 44: Investments under construction (7)

    Slide 44: Investments under construction (7)

    06. Appendices Description of investments – under construction (7) Rosa Przystanek Tarnogaj Kobieli City: Gdansk City: Wroclaw City: Gdansk District: Ujeścisko District: Krzyki District: Brzezno No. of stages: 3 No. of stages : 1 No. of stages: 1 Stages under construction: 2 Stages under constructio

  45. Slide 45: Investments under construction (6)

    Slide 45: Investments under construction (6)

    06. Appendices Description of investments – under construction (6) Wendy Foresteria Apartamenty Krakowska City: Gdynia City: Gdynia City: Wroclaw District: Śródmieście District: Wielki Kack District: Krzyki No. of stages: 5 No. of stages: 7 No. of stages: 3 Stages under construction: 1 Stages under

  46. Slide 46: Investments completed (1)

    Slide 46: Investments completed (1)

    06. Appendices Description of investments – completed (1) Szczęśliwy Dom Osiedle Zdrowa Nowa Rezydencja Królowej Marysieńki City: Warsaw City: Warsaw City: Warsaw District: Ochota District: Wilanów District: Wilanów No. of stages: 3 No. of stages: 5 No. of stages: 10 No. of units: 304 units No. of u

  47. Slide 47: Investments completed (2)

    Slide 47: Investments completed (2)

    06. Appendices Description of investments – completed (2) City Apartments Osiedle Królewskie Albatross Towers City: Warsaw City: Warsaw City: Gdansk District: Żoliborz District: Wilanów District: Przymorze No. of stages: 6 No. of stages: 6 No. of stages: 5 No. of units: 1 190 units No. of units: 640

  48. Slide 48: Investments completed (3)

    Slide 48: Investments completed (3)

    06. Appendices Description of investments – completed (3) Królewski Park Park Wola Residence Modern Żoliborz City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Wola District: Żoliborz No. of stages: 6 No. of stages: 1 No. of stages: 1 No. of units: 528 units No. of units: 317 units N

  49. Slide 49: Investments completed (4)

    Slide 49: Investments completed (4)

    06. Appendices Description of investments – completed (4) Young City Młody Wilanów Mila Baltica City: Warsaw City: Warsaw City: Gdansk District: Bemowo District: Wilanów District: Zaspa No. of stages: 9 No. of stages: 3 No. of stages: 2 No. of units: 1 302 units No. of units: 257 units No. of units:

  50. Slide 50: Investments completed (5)

    Slide 50: Investments completed (5)

    06. Appendices Description of investments – completed (5) Apartamenty Villa Nobile Słoneczna Morena MoreNova City: Warsaw City: Gdansk City: Gdansk District: Wilanów District: Piecki-Migowo District: Piecki-Migowo No. of stages: 3 No. of stages: 22 No. of stages: 3 No. of units: 637 units No. of uni

  51. Slide 51: Investments completed (6)

    Slide 51: Investments completed (6)

    06. Appendices Description of investments – completed (6) Ogrody Wilanów Green Mokotów Stacja Nowy Ursus City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Mokotów District: Ursus No. of stages: 3 No. of stages: 9 No. of stages: 5 No. of units: 221 units No. of units: 673 units No. o

  52. Slide 52: Investments completed (7)

    Slide 52: Investments completed (7)

    06. Appendices Description of investments – completed (7) Forum Wola Praga Arte Leśna Przystań City: Warsaw City: Warsaw City: Wroclaw District: Wola District: Praga Południe District: Osobowice No. of stages: 4 No. of stages: 1 No. of stages: 1 No. of units: ca. 880 units No. of units: ca. 250 unit

  53. Slide 53: Investments completed (8)

    Slide 53: Investments completed (8)

    06. Appendices Description of investments – completed (8) Willa Nad Potokiem Uroczysko Zajezdnia Wrzeszcz City: Wroclaw City: Wroclaw City: Gdansk District: Fabryczna District: Psie Pole District: Wrzeszcz No. of stages: 1 No. of stages: 3 No. of stages: 14 No. of units: 13 units No. of units: 309 u

  54. Slide 54: Investments completed (9)

    Slide 54: Investments completed (9)

    06. Appendices Description of investments – completed (9) Więcej Park Południe Apartamenty Królewskie City: Gdansk City: Gdansk City: Warsaw District: Łostowice District: Łostowice District: Wilanów No. of stages: 2 No. of stages: 8 No. of stages: 2 No. of units: 378 units No. of units: 565 units No

  55. Slide 55: Investments completed (10)

    Slide 55: Investments completed (10)

    06. Appendices Description of investments – completed (10) Praga Deco Wojszyckie Alejki Młode Stogi City: Warsaw City: Wroclaw City: Gdansk District: Praga Południe District: Krzyki District: Stogi No. of stages: 1 No. of stages: 2 No. of stages: 1 No. of units: 192 units No. of units: 210 units No.

  56. Slide 56: Investments completed (11)

    Slide 56: Investments completed (11)

    06. Appendices Description of investments – completed (11) Kameralna Olszówka Apartamenty przy metrze Wiśniowa Aleja City: Wroclaw City: Warsaw City: Gdansk District: Krzyki District: Bemowo District: Ujescisko No. of stages: 1 No. of stages: 1 No. of stages: 2 No. of units: 55 units No. of units: 8

  57. Slide 57: Investments completed (12)

    Slide 57: Investments completed (12)

    06. Appendices Description of investments – completed (12) VISTA (Myśliwska) Dożynkowa 43 Osiedle nad Widawą City: Gdansk City: Wroclaw City: Wroclaw District: Piecki-Migowo District: Krzyki District: Psie Pole No. of stages: 1 No. of stages: 1 No. of stages: 1 No. of units: 87 units No. of units: 1

  58. Slide 58: Investments completed (13)

    Slide 58: Investments completed (13)

    06. Appendices Description of investments – completed (13) Moment Lagom Nowa Letnica City: Gdansk City: Gdansk City: Gdansk District: Ujescisko District: Ujescisko District: Letnica No. of stages: 2 No. of stages: 1 No. of stages: 9 No. of units: 207 units No. of units: 41 units No. of units: 2 197

  59. Slide 59: Investments completed (14)

    Slide 59: Investments completed (14)

    06. Appendices Description of investments – completed (14) Sea Salt Mój Ursus Jutrzenki 92 City: Gdansk City: Warsaw City: Warsaw District: Zaspa District: Ursus District: Włochy No. of stages: 1 No. of stages: 8 No. of stages: 1 No. of units: 118 units No. of units: ca. 2 293 units No. of units: 14

  60. Slide 60: Disclaimer

    Slide 60: Disclaimer

    Disclaimer ROBYG S.A. endeavours to ensure that the information in the presentation is complete and up-to-date, however, we do not make any guarantees in this respect. ROBYG S.A. accepts no liability for the any errors and inaccuracies of this presentation. This presentation has been prepared solely

  61. Slide 61: Summary 2024

    Slide 61: Summary 2024

    Summary 2024 Please contact us: Developer and preliminary agreements signed: 1 891 (net after cancellations) Investor Relations ROBYG S.A. ri@robyg.com.pl Units on offer: 1 777 (out of which 3% are finished goods) (22) 419 11 00 Revenues: PLN 1 301 million Strong cash position*: PLN 363 million Oper

Source: company website