  1. Slide 1: FY 2016 Preliminary Results

    FY 2016 Preliminary Results 12 months to 30 June 2016 19 September 2016 Driving Forward

  2. Slide 2: Important Notice

    Important Notice • These Presentation Materials are being supplied to you by Petra Diamonds Limited (the “Company”) solely for your information and use at this presentation. These Presentation Materials may contain information that is confidential, legally privileged or otherwise protected by law. T

  3. Slide 3: FY 2016 – Driving Forward

    FY 2016 – Driving Forward Continued production growth • Record production of 3.7 Mcts and 19.0 Mt in FY 2016 • FY 2019 target increased from ca. 5 Mcts to ca. 5.3 Mcts Expansion programmes on track • SLC at Finsch and new C-Cut block cave at Cullinan commenced initial production • Cullinan mill plan

  4. Slide 4: FY 2016 – Key Performance Indicators

    FY 2016 – Key Performance Indicators ROUGH DIAMOND PRODUCTION REVENUE SAFETY Million carats US dollars (millions) LTIFR 3.7 +16% 430.9 +1% 0.29 0% 3.7 471.8 3.1 3.2 425.0 430.9 2.7 392.5 1.13 2.2 316.9 0.67 0.32 0.29 0.29 12 13 14 15 16 12 13 14 15 16 12 13 14 15 16 • Increased contribution of • Inc

  5. Slide 5: FY 2016 – Key Performance Indicators

    FY 2016 – Key Performance Indicators EBITDA1 OPERATING CASHFLOW2 CAPEX3 US dollars (millions) US dollars (millions) US dollars (millions) 164.3 +18% 192.0 +36% 295.8 +17% 187.7 164.3 295.8 139.3 192.0 127.6 181.2 252.2 132.8 141.3 201.9 90.3 186.0 131.7 79.9 12 13 14 15 16 12 13 14 15 16 12 13 14 15

  6. Slide 6: Financial Position

    Financial Position Unit 30 June 2016 30 June 2015 Closing exchange rate used for conversion R14.68:US$1 R12:16:US$1 Cash at bank US$m 48.7 166.6 US$ loan notes (including accrued interest) US$m 302.0 303.3 Bank loans and borrowings US$m 131.5 35.0 Net debt US$m 384.8 171.7 Bank facilities undrawn an

  7. Slide 7: FY 2016 – Operational Results

    FY 2016 – Operational Results Production by mine Revenue by mine Production Split - Carats Finsch 19% 18% Tailings Cullinan / Other 30% 43% 6% 2% 60% Williamson 18% 14% Koffiefontein 70% Combined Kimberley ROM Operations 14% 6% Unit FY 20161 FY 2015 Variance SALES Revenue US$M 430.9 425.0 +1% Diamon

  8. Slide 8: Operating Costs

    Operating Costs Petra’s focus on cost control and the weaker ZAR helped to mitigate inflationary pressures FY 2016 On-mine cash cost breakdown (South Africa operations) 9% Group on-mine US$ cash costs decreased 3% due to: 15% • Increase in tonnes treated (7% increase) 39% • Inflationary increases, i

  9. Slide 9: FY 2016 – Summary of Results

    FY 2016 – Summary of Results FY 2016 FY 2015 (US$m) (US$m) Revenue 430.9 425.0 Adjusted mining and processing costs2 (257.7) (272.7) Other direct income 2.8 2.2 Profit from mining activities2 176.0 154.5 Exploration expense (2.7) (5.6) Corporate overhead (9.0) (9.6) Adjusted EBITDA2 164.3 139.3 Depr

  10. Slide 10: Diamond Market – Overview

    Diamond Market – Overview Supply Demand • Supply constraints: Global rough diamond production • US recovery: economy continues to improve; very strong rose 2% to 127 Mcts worth $13.9bn in 2015 (average diamond buying culture (ca. 45% of world demand); retail $109/ct) demand currently performing well

  11. Slide 11: Diamond Market – Overview

    Diamond Market – Overview FY 2016 Market FY 2017 Outlook • Petra pricing down ca. 6% for Year • Market conditions will depend on continued supply discipline from • H1: Market experienced challenging conditions in H1 2016 – the major producers, as well as a stable retail market, particularly Petra pr

  12. Slide 12: Exceptional Diamonds

    Exceptional Diamonds • Petra classifies ‘exceptional diamonds’ as stones that sell for +$5 million each • Exceptional diamonds contributed on average $23 million pa from FY 2009 to FY 2016 • Average increased to ca. $36 million pa in FY 2014 to FY 2016 Exceptional Diamond Sales – FY 2016 Williamson

  13. Slide 13: Moving to Undiluted Ore

    Moving to Undiluted Ore • Caving is a safe and proven mechanised mining method; provides access to higher volumes of ore than other methods • Current underground mining taking place in diluted, mature caves nearing end of lives • Expansion programmes to take next ‘cut’ by deepening and establishing

  14. Slide 14: Growth and Margin Expansion

    Growth and Margin Expansion Adjusted EBITDA margin expected to rise from ca. 38% in FY 2016 to +50% by FY 2019 • Increase in ROM grades and increase in tonnage throughput (mainly due to Kimberley Mines transaction) to lead to ca. 43% growth in production • Lower value tailings carat production to re

  15. Slide 15: Finsch – Development Programme

    Finsch – Development Programme Expansion Plan FY 2016 Development: Waste: 2,484 metres; Raiseboring: 99 metres; Kimberlite: 2,969 metres • Expansion plan to take production to ca. 2.0 Mctpa (ROM) by FY 2018 • Sub level cave - tunnelling in host rock complete - 6/11 tunnels in production – 1st level

  16. Slide 16: Finsch Development Snapshot

    Finsch Development Snapshot Long hole drilling, 70 Level SLC kimberlite Tipping blasted ore through rockbreaker Access development tunnel UG conveyor used to transport broken ore Installation of the Apron Feeder Bulkhead The new bulk sample plant Petra Diamonds Limited FY 2016 Preliminary Results 16

  17. Slide 17: Cullinan – Development Programme

    Cullinan – Development Programme Expansion Plan FY 2016 Development: Waste: 1,911 metres; Raiseboring: 838 metres; Kimberlite: 2,837 metres • Expansion plan to take production to ca. 2.2 Mcts by FY 2019 (2.0 ROM & 0.2 tailings) • C-Cut Phase 1: new block cave being established on the western side of

  18. Slide 18: Cullinan Development Snapshot

    Cullinan Development Snapshot Rock breaker south extraction Long hole drilling draw point North production conveyor 2 Mill plant, mill basis and DMS feed area Crusher installation 101 conveyor to mill Petra Diamonds Limited FY 2016 Preliminary Results 18

  19. Slide 19: Cullinan Mill Plant Project

    Cullinan Mill Plant Project Recovery, XRL and HPGR 2 Silos and conveyor belts Mill structure • Increase in diamond liberation and gentler process likely to result in less breakage • Saving of ca. ZAR20 – 25/t in processing costs • Strong standalone economics  Payback of ca. 3 years  IRR of 25% • C

  20. Slide 20: Growth and Margin Expansion

    Growth and Margin Expansion Petra to maintain a fairly flat tonnage profile from FY 2017 onwards, but the replacement of poor quality tonnes with better quality tonnes will significantly grow production and increase the average value per carat FY 2019 production target of ca. 5.3 Mcts; revenue of ca

  21. Slide 21: Sustainability Highlights

    Sustainability Highlights Health and Safety • Achievements: Stable LTIFR; Finsch won two MineSAFE Awards • Challenges: Petra’s mining method and operations are inherently safe but there is an ever present risk of accidents • Fatality in Jul 15 at Tailings Treatment Plant at Cullinan related to equip

  22. Slide 22: Integrated Approach to Sustainability

    Integrated Approach to Sustainability Williamson Children’s Day Environmental Awareness Local Economic Development An annual fun day for children of all ages Tree planting at local schools Finsch’s Small Business Hub for entrepreneurs Professional Development Education Community Exposure to career o

  23. Slide 23: Appendix

    x< = = 5 ioe BS 2]

  24. Slide 24: Capital Structure

    Capital Structure Share Price (1 year to 15 Sep 16) vs As at 16 September 2016 Number FTSE 250 & FTSE 350 Mining of voting % ISC rights BlackRock Investment (UK) Limited 68,084,516 13.2% T. Rowe Price 58,276,543 11.1% M&G Investment Fund 44,010,631 8.4% Standard Life Investment (Holdings) Limited 28

  25. Slide 25: The Petra Board

    The Petra Board Adonis Pouroulis Johan Dippenaar Jim Davidson Non-Executive Chairman CEO Technical Director One of South Africa’s most successful Acknowledged world authority on kimberlite Successful mining entrepreneur diamond entrepreneurs with 25 years’ geology and exploration Founded Petra Diamo

  26. Slide 26: World Diamond Mines

    World Diamond Mines Petra Diamonds Limited FY 2016 Preliminary Results 26

  27. Slide 27: Focus on Africa

    Focus on Africa • Five producing mines (four in South Africa and one in Tanzania), plus exploration in Botswana and South Africa • Diversified portfolio is key to managing production risk across the Group Petra Diamonds Limited FY 2016 Preliminary Results 27

  28. Slide 28: An Exceptional Growth Plan

    An Exceptional Growth Plan July 2007 July 2008 February 2009 Koffiefontein Cullinan Williamson Petra has acquired six non-core diamond mining operations from De Beers Petra approach: • Flat management structures 70% Petra¹; 30% BEE 74%¹ Petra; 26% BEE 75% Petra¹; 25% Government of Tanzania • Focus o

  29. Slide 29: 2016 Resource Statement (30 June 2016)

    2016 Resource Statement (30 June 2016) World-class Resource base of 312.2 million carats¹ worth ca. US$48.6 billion² Gross Resources (Mcts) 100 49.1 50 40.4 194.2 9.0 6.7 - Cullinan Finsch Williamson Operations3 Kimberley Operations Koffiefontein Gross In Situ Value (US$bn)² 15.5 24.5 4.4 3.1 1.2 -

  30. Slide 30: Production and Revenue – FY 2016 vs. FY 2019

    Production and Revenue – FY 2016 vs. FY 2019 Gross Production Gross Revenue FY 2016 actual: 3.7 million carats FY 2016 actual: US$430.9 million 18% 19% Finsch 6% 43% 60% 2% Cullinan 18% 14% Williamson Koffiefontein 6% Kimberley 14% FY 2019: ca. 5.3 million carats1 FY 2019: ca. US$0.8 billion1 39% 39

  31. Slide 31: The Diamond Market in 2015

    The Diamond Market in 2015 • Global diamond jewellery sales +2% in local currency but -2% in USD: ca. $79 billion Share of World Polished Diamond Consumption in Value (US$ PWP) Diamond Jewellery Value, Growth by Geography (US$bn) Source: De Beers Diamond Insight Report 2016 Petra Diamonds Limited FY

  32. Slide 32: Petra Production Profile

    Petra Production Profile • Production profile of a kimberlite is highly consistent when the mine is in steady state production • Ever growing volumes across the full diamond spectrum (from lowest to highest value) • Growing trend for mass luxury supported by strong pricing performance in smaller / 2

  33. Slide 33: Iconic Diamonds From Iconic Mines

    Iconic Diamonds From Iconic Mines The Greater Star of The Williamson Pink Africa 55ct rough; 24ct polished; Largest polished yield gifted to Princess Elizabeth from the Cullinan at on her engagement 530ct; sits in the Royal Williamson, 1947 Sceptre Cullinan, 1905 The Cullinan Heritage 507.5 carats r

  34. Slide 34: The Most Highly Concentrated Form of Wealth

    The Most Highly Concentrated Form of Wealth Examples of recent polished diamond sales at auction The 14.62ct The 12.03ct Blue Oppenheimer Moon of Blue diamond Josephine diamond Sold for $57.7m $3.9m per carat, Sold for $48.4m 18 May 2016 $4.0m per carat, 12 November 2015 The 24.18ct The 15.38ct Cull

  35. Slide 35: FY 2016 Operational Results

    FY 2016 Operational Results Combined Finsch Cullinan Koffiefontein Williamson Kimberley Ops FY FY FY FY FY FY FY FY FY FY 2016 2015 2016 2015 2016 2015 2016 2015 2016 2015 ROM PRODUCTION Tonnes Treated (t) 3,547,798 3,016,385 2,302,892 2,513,004 681,344 341,783 721,513 1,196,269 4,003,180 4,056,638

  36. Slide 36: Koffiefontein – Development Programme

    Koffiefontein – Development Programme Expansion Plan Koffiefontein Kimberlite Pipe Schematic Expansion Plan – to take production to ca. 95,000 ctpa by FY 2017 • SLC to be mined over 3 levels from 560 mL to 600 mL • Production commenced from first tunnels of SLC on 560 mL – end FY 2015 • 52L Western

  37. Slide 37: Kimberley Underground – Development Programme

    Kimberley Underground – Development Programme Expansion Plan Kimberley Underground Kimberlite Pipes Schematic Expansion Plan – planned underground production of ca. 215,000 ctpa from FY 2019 • Underground ore to be treated at Central Treatment Plant – from FY 2017 • Planned grade of 13 – 14 cpht – f

  38. Slide 38: Williamson – Development Programme

    Williamson – Development Programme Expansion Plan Williamson Kimberlite Pipe Schematic Expansion Plan – to take production to ca. 325,000 ctpa by FY 2018 • Plant modifications (additional crusher circuit, 2 autogenous mills) commenced – FY 2016 • Commissioning of crusher – FY 2016 • Commissioning of

  39. Slide 39: Debt Facilities

    Debt Facilities • Bank facilities (excl. FX lines) as at 30 June 2016: ca. $242 million • Bank debt facilities undrawn and available to the Group as at 30 June 2016: $110 million Lender Type Size Size Utilised at Interest Rate Repayment ZARM US$M1 30 Jun 2016 ZARM/US$M Absa & RMB ZAR Amortising term

  40. Slide 40: Bank Debt Facilities – Covenants

    Bank Debt Facilities – Covenants Distribution Maintenance Covenants Covenants 12 months to 12 months to 12 months to 12 months to 12 months to Covenant 30 June 2016 30 June 2016 31 Dec 2016 30 June 2017 31 Dec 2017 All periods and thereafter Actual Required ratio Required ratio Required ratio Requir

  41. Slide 41: Leverage Ratios

    Leverage Ratios 30 June 2016 30 June 2015 IFRS Net debt¹ USDm 375.8 160.5 Consolidated net debt (for bank debt covenant measurement) USDm 464.6 256.1 Gearing² % 69 26 Adjusted EBITDA³ USDm 164.3 139.3 EBITDA margin4 % 38 33 Consolidated net debt: EBITDA5 x 2.8 1.8 EBITDA net interest cover6 x 4.3 7.

  42. Slide 42: Capex Profile – FY 2017 to FY 2019

    Capex Profile – FY 2017 to FY 2019 1. All Capex numbers are stated in FY 2017 money terms (ZAR14:$1 where applicable) 2. Depreciation on mining assets for FY 2017 guided at ca. US$70 – 75 million at ZAR14:$1 3. As in prior guidance, capital estimates above do not include any capitalised borrowing co

  43. Slide 43: Thank You

    Thank You Further enquiries: Petra Diamonds Cathy Malins Corporate Communications Manager cathy.malins@petradiamonds.com +44 20 7494 8203 www.petradiamonds.com